Bid Tab X-ray: 6502-15-001

Sep 9, 2026 · Denton Sign up free
Set your company to personalize scores

04 Rock Riprap - 09/2026

6502-15-001 · let Sep 9, 2026 · Denton, Dallas · Material Maintenance Project

$40,000Low bid: TOUCHSTONE RESOURCES, LLC-23.1% vs estimate $52,000
$9,600Left on the table24.0% gap to the second bid
4BiddersSpread 71% low to high
1Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1TOUCHSTONE RESOURCES, LLC $40,000-23.1% $9,600 0 0
2GARRET SHIELDS INFRASTRUCTURE $49,600+24.0%-4.6% $12,480 0 0
3SOUTHERN SOURCING SOLUTIONS, LLC $62,080+55.2%19.4% $6,152 0 0
4DIGG COMMERCIAL, LLC $68,232+70.6%31.2% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.

Where the job was won

TOUCHSTONE RESOURCES, LLC vs GARRET SHIELDS INFRASTRUCTURE, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8004-7001 RIPRAP(STN CMN DRY)(3"-5")(DEL)(ST 1)800 CY $50.00$62.00$60.08 $9,600

Positive: the low bidder was cheaper on that item. These 1 items account for $9,600 of the $9,600 gap.