Reflectorized Pavement Markings 09 10/26
6502-76-001 · let Oct 14, 2026 · Ellis, Dallas · Routine Maintenance Project - Sealed
$453,554Low bid: STRIPE-A-ZONE, LLC+22.4% vs estimate $370,456
$34,762Left on the table7.7% gap to the second bid
2BiddersSpread 8% low to high
39Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | STRIPE-A-ZONE, LLC | $453,554 | 22.4% | $34,762 | 4+$23,938 | 2-$12,111 | |
| 2 | TRP INFRASTRUCTURE SERVICES, LLC | $488,316 | +7.7% | 31.8% | 2+$70,073 | 1-$21,960 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
STRIPE-A-ZONE, LLC vs TRP INFRASTRUCTURE SERVICES, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7002 MOBILIZATION (CALLOUT) | 12 EA | $500.00 | $5,000.00 | $600.85 | $54,000 |
| 505-7003 TMA (MOBILE OPERATION) | 100 DAY | $250.00 | $10.00 | $229.60 | -$24,000 |
| 666-7347 PAVEMENT SLER 6" | 65,000 LF | $0.2000 | $0.4500 | $0.1841 | $16,250 |
| 666-7171 RE PM TY II (W) 4" (SLD) | 120,000 LF | $0.1800 | $0.2800 | $0.1960 | $12,000 |
| 666-7210 RE PM TY II (Y) 4" (SLD) | 85,000 LF | $0.1800 | $0.2800 | $0.1822 | $8,500 |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 65,000 LF | $0.7100 | $0.6000 | $0.4757 | -$7,150 |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 65,000 LF | $0.7100 | $0.6000 | $0.4986 | -$7,150 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 4,400 LF | $1.65 | $0.5000 | $0.2040 | -$5,060 |
| 533-7002 MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | 4,400 LF | $1.65 | $0.5000 | $0.2394 | -$5,060 |
| 677-7001 ELIM EXT PM & MRKS (4") | 100,000 LF | $0.4500 | $0.4000 | $0.2643 | -$5,000 |
| 666-7266 RE PROFILE PM TY I(W)6"(SLD)(100MIL) | 26,400 LF | $0.9600 | $0.8000 | $0.6515 | -$4,224 |
| 666-7270 RE PROFILE PM TY I(Y)6"(SLD)(100MIL) | 26,400 LF | $0.9600 | $0.8000 | $0.6629 | -$4,224 |
| 666-7346 PAVEMENT SLER 4" | 20,000 LF | $0.1000 | $0.3000 | $0.4948 | $4,000 |
| 678-7002 PAV SURF PREP FOR MRK (6") | 75,000 LF | $0.0100 | $0.0600 | $0.0662 | $3,750 |
| 677-7002 ELIM EXT PM & MRKS (6") | 6,250 LF | $1.05 | $0.5500 | $0.2755 | -$3,125 |
| 666-7168 RE PM TY II (W) 4" (BRK) | 30,000 LF | $0.1900 | $0.2800 | $0.2707 | $2,700 |
| 666-7211 RE PM TY II (Y) 6" (BRK) | 37,500 LF | $0.3500 | $0.2800 | $0.1759 | -$2,625 |
| 666-7208 RE PM TY II (Y) 4" (BRK) | 21,500 LF | $0.1900 | $0.2800 | $0.2426 | $1,935 |
| 666-7213 RE PM TY II (Y) 6" (SLD) | 150,000 LF | $0.2700 | $0.2800 | $0.1749 | $1,500 |
| 672-7004 REFL PAV MRKR TY II-A-A | 1,500 EA | $6.00 | $5.00 | $3.97 | -$1,500 |
Positive: the low bidder was cheaper on that item. These 20 items account for $35,517 of the $34,762 gap.
STRIPE-A-ZONE, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 666-7211 RE PM TY II (Y) 6" (BRK) | 37,500 LF | $0.3500 | $0.1759 | 1.99x | $6,529 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 4,400 LF | $1.65 | $0.2040 | 8.09x | $6,362 |
| 533-7002 MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | 4,400 LF | $1.65 | $0.2394 | 6.89x | $6,207 |
| 677-7002 ELIM EXT PM & MRKS (6") | 6,250 LF | $1.05 | $0.2755 | 3.81x | $4,841 |
| 666-7346 PAVEMENT SLER 4" | 20,000 LF | $0.1000 | $0.4948 | 0.20x | -$7,896 |
| 678-7002 PAV SURF PREP FOR MRK (6") | 75,000 LF | $0.0100 | $0.0662 | 0.15x | -$4,215 |