FY27 Crackseal
6501-50-001 · let Sep 15, 2026 · Jefferson, Beaumont · Routine Maintenance Project - Sealed
$437,494Low bid: SAPO ENGINEERING CONSULTANTS, LLC-18.0% vs estimate $533,742
$1,728Left on the table0.4% gap to the second bid
6BiddersSpread 73% low to high
5Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | SAPO ENGINEERING CONSULTANTS, LLC | $437,494 | -18.0% | $1,728 | 2+$22,720 | 1-$503,850 | |
| 2 | D & M CONTRACTORS, LLC | $439,222 | +0.4% | -17.7% | $16,711 | 0 | 3-$535,444 |
| 3 | Alpha Pavement Markings LLC | $455,933 | +4.2% | -14.6% | $197,990 | 0 | 3-$525,536 |
| 4 | BLACKSMITH VENTURES LLC | $653,923 | +49.5% | 22.5% | $28,365 | 0 | 3-$502,536 |
| 5 | CRACKSEAL OF TEXAS, LLC | $682,288 | +56.0% | 27.8% | $72,843 | 0 | 3-$510,533 |
| 6 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | $755,131 | +72.6% | 41.5% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
SAPO ENGINEERING CONSULTANTS, LLC vs D & M CONTRACTORS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 712-7001 JT / CRCK SEAL (RUBBER - ASPHALT) | 454.52 LMI | $784.33 | $900.00 | $868.20 | $52,574 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $10,000.00 | $20.00 | $11,585.04 | -$29,940 |
| 505-7001 TMA (STATIONARY) | 32 DAY | $500.00 | $2.00 | $217.57 | -$15,936 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 15 DAY | $1,000.00 | $2.00 | $87.82 | -$14,970 |
| 500-7001 MOBILIZATION | 1 LS | $20,000.27 | $30,000.00 | $523,850.32 | $10,000 |
Positive: the low bidder was cheaper on that item. These 5 items account for $1,728 of the $1,728 gap.