RMC 6508-74-001

6508-74-001 · let Oct 13, 2026 · Waller, Houston · Routine Maintenance Project - Sealed

$384,715Low bid: ABOVE ALL CONTRACTING LLC-27.8% vs estimate $532,540
$139,135Left on the table36.2% gap to the second bid
3BiddersSpread 38% low to high
15Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1ABOVE ALL CONTRACTING LLC $384,715-27.8% $139,135 1+$3,691 5-$102,030
2ROY JORGENSEN ASSOCIATES, INC. $523,850+36.2%-1.6% $5,510 4+$25,308 3-$76,977
3RHINO EQUITY, LLC $529,360+37.6%-0.6% 2+$20,427 5-$101,229

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.

Where the job was won

ABOVE ALL CONTRACTING LLC vs ROY JORGENSEN ASSOCIATES, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
771-7026 REPLACE LINE OR TERMINAL POST (GIBRAL)800 EA $175.00$250.00$176.83 $60,000
770-7037 REPLACE GUARDRAIL END TREATMENT SYSTEM40 EA $3,200.00$4,200.00$3,116.90 $40,000
778-7004 CONCRETE RAIL REPLACEMENT (IN-KIND)40 LF $100.00$500.00$382.36 $16,000
512-7017 PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)1,100 LF $30.00$18.00$25.07 -$13,200
500-7033 MOBILIZATION (EMERGENCY)5 EA $1.00$2,000.00$844.81 $9,995
770-7041 REPLACE GDRL END TREATMENT MRKR40 EA $5.00$200.00$29.93 $7,800
770-7026 REPLACE DOWNSTREAM ANCHOR TERMINAL10 EA $500.00$1,200.00$534.87 $7,000
500-7002 MOBILIZATION (CALLOUT)60 EA $1.00$100.00$600.85 $5,940
770-7036 REPLACE THRIE-BEAM RAIL40 LF $75.00$200.00$48.04 $5,000
505-7001 TMA (STATIONARY)150 DAY $1.00$25.00$217.57 $3,600
770-7038 REPLACE CURVED RAIL50 LF $100.00$50.00$26.19 -$2,500
771-7033 SPLICE CABLE10 EA $250.00$200.00$342.77 -$500
770-7035 REPLACE W-BEAM RAIL3,000 LF $20.00$20.00$24.10 $0
771-7030 CHECK AND RE-TENSION CABLE SYSTEM60 EA $50.00$50.00$350.67 $0
771-7031 REPLACE CABLE40 LF $20.00$20.00$3.23 $0

Positive: the low bidder was cheaper on that item. These 15 items account for $139,135 of the $139,135 gap.

ABOVE ALL CONTRACTING LLC: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
770-7038 REPLACE CURVED RAIL50 LF $100.00$26.193.82x$3,691
500-7002 MOBILIZATION (CALLOUT)60 EA $1.00$600.850.00x-$35,991
505-7001 TMA (STATIONARY)150 DAY $1.00$217.570.00x-$32,486
771-7030 CHECK AND RE-TENSION CABLE SYSTEM60 EA $50.00$350.670.14x-$18,040
778-7004 CONCRETE RAIL REPLACEMENT (IN-KIND)40 LF $100.00$382.360.26x-$11,294
500-7033 MOBILIZATION (EMERGENCY)5 EA $1.00$844.810.00x-$4,219

ROY JORGENSEN ASSOCIATES, INC.: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
770-7041 REPLACE GDRL END TREATMENT MRKR40 EA $200.00$29.936.68x$6,803
770-7026 REPLACE DOWNSTREAM ANCHOR TERMINAL10 EA $1,200.00$534.872.24x$6,651
770-7036 REPLACE THRIE-BEAM RAIL40 LF $200.00$48.044.16x$6,078
500-7033 MOBILIZATION (EMERGENCY)5 EA $2,000.00$844.812.37x$5,776
500-7002 MOBILIZATION (CALLOUT)60 EA $100.00$600.850.17x-$30,051
505-7001 TMA (STATIONARY)150 DAY $25.00$217.570.11x-$28,886
771-7030 CHECK AND RE-TENSION CABLE SYSTEM60 EA $50.00$350.670.14x-$18,040

RHINO EQUITY, LLC: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
770-7026 REPLACE DOWNSTREAM ANCHOR TERMINAL10 EA $2,000.00$534.873.74x$14,651
500-7033 MOBILIZATION (EMERGENCY)5 EA $2,000.00$844.812.37x$5,776
500-7002 MOBILIZATION (CALLOUT)60 EA $1.00$600.850.00x-$35,991
505-7001 TMA (STATIONARY)150 DAY $1.00$217.570.00x-$32,486
771-7030 CHECK AND RE-TENSION CABLE SYSTEM60 EA $50.00$350.670.14x-$18,040
778-7004 CONCRETE RAIL REPLACEMENT (IN-KIND)40 LF $100.00$382.360.26x-$11,294
771-7033 SPLICE CABLE10 EA $1.00$342.770.00x-$3,418