04 Winter Weather Material - Brine 11/26
6506-43-001 · let Oct 14, 2026 · Denton, Dallas · Material Maintenance Project
$130,000Low bid: TOUCHSTONE RESOURCES, LLC+18.7% vs estimate $109,500
$6,024Left on the table4.6% gap to the second bid
2BiddersSpread 5% low to high
2Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TOUCHSTONE RESOURCES, LLC | $130,000 | 18.7% | $6,024 | 0 | 0 | |
| 2 | NSG LOGISTICS, LLC | $136,024 | +4.6% | 24.2% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
TOUCHSTONE RESOURCES, LLC vs NSG LOGISTICS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8032-7458 CAT 8C-B BRINE SALT (DEL)(SITE 1) | 500 TON | $200.00 | $209.02 | $165.45 | $4,510 |
| 8032-7477 CAT 8C-B BRINE SALT (DEL)(SITE 1)(EXP) | 150 TON | $200.00 | $210.09 | $155.21 | $1,514 |
Positive: the low bidder was cheaper on that item. These 2 items account for $6,024 of the $6,024 gap.