Bid Tab X-ray: 6501-45-001

Sep 9, 2026 · Collin Sign up free
Set your company to personalize scores

BRINE SALT FY27

6501-45-001 · let Sep 9, 2026 · Collin, Dallas · Material Maintenance Project

$247,177Low bid: NSG LOGISTICS, LLC+94.1% vs estimate $127,342
$64,823Left on the table26.2% gap to the second bid
2BiddersSpread 26% low to high
2Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1NSG LOGISTICS, LLC $247,17794.1% $64,823 0 0
2TOUCHSTONE RESOURCES, LLC $312,000+26.2%145.0% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

NSG LOGISTICS, LLC vs TOUCHSTONE RESOURCES, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8032-7458 CAT 8C-B BRINE SALT (DEL)(SITE 1)1,000 TON $189.79$240.00$165.45 $50,210
8032-7477 CAT 8C-B BRINE SALT (DEL)(SITE 1)(EXP)300 TON $191.29$240.00$155.21 $14,613

Positive: the low bidder was cheaper on that item. These 2 items account for $64,823 of the $64,823 gap.