Limestone Rock Asphalt 09 1026
6503-01-001 · let Oct 14, 2026 · Ellis, Dallas · Material Maintenance Project
$197,064Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+8.0% vs estimate $182,400
$11,034Left on the table5.6% gap to the second bid
2BiddersSpread 6% low to high
4Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | VULCAN CONSTRUCTION MATERIALS, LLC | $197,064 | 8.0% | $11,034 | 0 | 0 | |
| 2 | MARTIN MARIETTA MATERIALS, INC. | $208,098 | +5.6% | 14.1% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8001-7094 LRA (TY II GR CS) (DEL) (ST2) | 300 TON | $165.68 | $175.38 | $127.06 | $2,910 |
| 8001-7093 LRA (TY II GR CS) (DEL) (ST1) | 300 TON | $163.76 | $173.45 | $104.61 | $2,907 |
| 8001-7010 LRA (TY I GR AA) (DEL) (ST2) | 300 TON | $164.68 | $173.38 | $124.75 | $2,610 |
| 8001-7009 LRA (TY I GR AA) (DEL) (ST1) | 300 TON | $162.76 | $171.45 | $112.79 | $2,607 |
Positive: the low bidder was cheaper on that item. These 4 items account for $11,034 of the $11,034 gap.