Bid Tab X-ray: 6504-67-001

Oct 7, 2026 · Harris Sign up free
Set your company to personalize scores

6504-67-001 FULL DEPTH CONCRETE

6504-67-001 · let Oct 7, 2026 · Harris, Houston · Routine Maintenance Project - Sealed

$2,731,500Low bid: ISI CONTRACTING, INC.-10.4% vs estimate $3,049,175
$42,900Left on the table1.6% gap to the second bid
4BiddersSpread 27% low to high
20Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1ISI CONTRACTING, INC. $2,731,500-10.4% $42,900 1+$1,029,728 5-$797,092
2MC2 CIVIL, LLC $2,774,400+1.6%-9.0% $558,074 0 0
3STRUCTURAL INTEGRITY GROUP LLC $3,332,474+22.0%9.3% $123,676 3+$525,902 0
4DIGG COMMERCIAL, LLC $3,456,150+26.5%13.3% 4+$678,670 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.

Where the job was won

ISI CONTRACTING, INC. vs MC2 CIVIL, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
505-7001 TMA (STATIONARY)300 DAY $3,650.00$250.00$217.57 -$1,020,000
429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT)7,000 SF $36.00$100.00$85.28 $448,000
438-7007 CLEANING AND SEALING EXIST JOINTS (CL7)7,000 LF $9.00$44.00$38.57 $245,000
785-7011 BRIDGE JOINT REPLACEMENT (SEJ)200 LF $283.00$1,000.00$634.97 $143,400
429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)1,000 SF $30.00$150.00$150.68 $120,000
429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT))500 SF $45.00$200.00$153.06 $77,500
361-7068 FULL-DEPTH REP(BR APPR SLAB)(9"-13")150 SY $380.00$500.00$550.34 $18,000
500-7033 MOBILIZATION (EMERGENCY)12 EA $500.00$2,000.00$844.81 $18,000
438-7004 CLEANING AND SEALING EXIST JOINTS (CL3)500 LF $12.00$25.00$19.19 $6,500
401-7001 FLOWABLE BACKFILL50 CY $250.00$350.00$298.77 $5,000
503-7001 PORTABLE CHANGEABLE MESSAGE SIGN50 DAY $250.00$150.00$87.82 -$5,000
361-7060 FULL-DEPTH REPAIR CRCP (12")1,500 SY $338.00$335.00$313.15 -$4,500
529-7014 CONC CURB (DOWEL)150 LF $6.00$35.00$33.73 $4,350
400-7010 CEM STABIL BKFL20 CY $250.00$60.00$138.14 -$3,800
361-7057 FULL - DEPTH REPAIR CRCP (10")500 SY $317.00$310.00$239.80 -$3,500
361-7070 FULL - DEPTH REPAIR CRCP (13"-15")1,000 SY $368.00$365.00$390.67 -$3,000
361-7067 FULL - DEPTH REPAIR CRCP (14")200 SY $366.00$355.00$300.63 -$2,200
500-7002 MOBILIZATION (CALLOUT)12 EA $250.00$100.00$600.85 -$1,800
438-7001 CLEANING AND SEALING EXISTING JOINTS50 LF $12.00$25.00$15.92 $650
104-7006 REMOV CONC (RIPRAP)100 SY $22.00$25.00$14.32 $300

Positive: the low bidder was cheaper on that item. These 20 items account for $42,900 of the $42,900 gap.

ISI CONTRACTING, INC.: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
505-7001 TMA (STATIONARY)300 DAY $3,650.00$217.5716.78x$1,029,728
429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT)7,000 SF $36.00$85.280.42x-$344,990
438-7007 CLEANING AND SEALING EXIST JOINTS (CL7)7,000 LF $9.00$38.570.23x-$206,998
429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)1,000 SF $30.00$150.680.20x-$120,680
785-7011 BRIDGE JOINT REPLACEMENT (SEJ)200 LF $283.00$634.970.45x-$70,394
429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT))500 SF $45.00$153.060.29x-$54,030

STRUCTURAL INTEGRITY GROUP LLC: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
361-7070 FULL - DEPTH REPAIR CRCP (13"-15")1,000 SY $765.00$390.671.96x$374,328
361-7057 FULL - DEPTH REPAIR CRCP (10")500 SY $430.00$239.801.79x$95,100
361-7067 FULL - DEPTH REPAIR CRCP (14")200 SY $583.00$300.631.94x$56,474

DIGG COMMERCIAL, LLC: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
505-7001 TMA (STATIONARY)300 DAY $2,000.00$217.579.19x$534,728
429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT))500 SF $300.00$153.061.96x$73,470
500-7033 MOBILIZATION (EMERGENCY)12 EA $5,000.00$844.815.92x$49,862
503-7001 PORTABLE CHANGEABLE MESSAGE SIGN50 DAY $500.00$87.825.69x$20,609