6496-11-001 Miscellaneous Concrete
6496-11-001 · let Nov 10, 2026 · Ector, Odessa · Routine Maintenance Project
$274,692Low bid: SCR CIVIL CONSTRUCTION, LLC-9.9% vs estimate $304,962
$13,868Left on the table5.0% gap to the second bid
3BiddersSpread 5% low to high
15Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | SCR CIVIL CONSTRUCTION, LLC | $274,692 | -9.9% | $13,868 | 9+$145,424 | 1-$496,550 | |
| 2 | RB CONTRACTING, LLC | $288,560 | +5.0% | -5.4% | $354 | 9+$87,906 | 1-$433,850 |
| 3 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $288,914 | +5.2% | -5.3% | 9+$130,722 | 1-$495,050 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
SCR CIVIL CONSTRUCTION, LLC vs RB CONTRACTING, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $27,300.00 | $90,000.00 | $523,850.32 | $62,700 |
| 536-7002 CONC MEDIAN | 58 SY | $550.00 | $220.00 | $92.13 | -$19,140 |
| 466-7005 HEADWALL (CH - FW - 0) (DIA= 24 IN) | 2 EA | $20,000.00 | $12,000.00 | $9,324.22 | -$16,000 |
| 467-7326 SET (TY II) (24 IN) (RCP) (4: 1) (C) | 2 EA | $10,000.00 | $4,000.00 | $2,065.28 | -$12,000 |
| 432-7001 RIPRAP (CONC)(4 IN) | 12 CY | $1,860.00 | $1,100.00 | $573.24 | -$9,120 |
| 529-7009 CONC CURB & GUTTER (TY II) | 620 LF | $76.00 | $90.00 | $32.57 | $8,680 |
| 531-7001 CONC SIDEWALKS (4") | 60 SY | $285.00 | $160.00 | $70.57 | -$7,500 |
| 505-7001 TMA (STATIONARY) | 40 DAY | $325.00 | $500.00 | $217.57 | $7,000 |
| 400-7008 CUT & RESTORE ASPH PAVING | 10 SY | $1,000.00 | $340.00 | $140.13 | -$6,600 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 MO | $7,400.00 | $10,000.00 | $11,585.04 | $5,200 |
| 104-7017 REMOV CONC (CURB & GUTTER) | 586 LF | $32.00 | $25.00 | $8.04 | -$4,102 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 40 DAY | $80.00 | $180.00 | $87.82 | $4,000 |
| 401-7001 FLOWABLE BACKFILL | 2 CY | $2,185.00 | $2,500.00 | $298.77 | $630 |
| 464-7034 RC PIPE (CL V)(24 IN) | 10 LF | $333.00 | $350.00 | $156.72 | $170 |
| 496-7007 REMOV STR (PIPE) | 10 LF | $150.00 | $145.00 | $23.96 | -$50 |
Positive: the low bidder was cheaper on that item. These 15 items account for $13,868 of the $13,868 gap.
SCR CIVIL CONSTRUCTION, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 529-7009 CONC CURB & GUTTER (TY II) | 620 LF | $76.00 | $32.57 | 2.33x | $26,928 |
| 536-7002 CONC MEDIAN | 58 SY | $550.00 | $92.13 | 5.97x | $26,557 |
| 466-7005 HEADWALL (CH - FW - 0) (DIA= 24 IN) | 2 EA | $20,000.00 | $9,324.22 | 2.14x | $21,352 |
| 467-7326 SET (TY II) (24 IN) (RCP) (4: 1) (C) | 2 EA | $10,000.00 | $2,065.28 | 4.84x | $15,869 |
| 432-7001 RIPRAP (CONC)(4 IN) | 12 CY | $1,860.00 | $573.24 | 3.24x | $15,441 |
| 104-7017 REMOV CONC (CURB & GUTTER) | 586 LF | $32.00 | $8.04 | 3.98x | $14,040 |
| 531-7001 CONC SIDEWALKS (4") | 60 SY | $285.00 | $70.57 | 4.04x | $12,866 |
| 400-7008 CUT & RESTORE ASPH PAVING | 10 SY | $1,000.00 | $140.13 | 7.14x | $8,599 |
| 401-7001 FLOWABLE BACKFILL | 2 CY | $2,185.00 | $298.77 | 7.31x | $3,772 |
| 500-7001 MOBILIZATION | 1 LS | $27,300.00 | $523,850.32 | 0.05x | -$496,550 |
RB CONTRACTING, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 529-7009 CONC CURB & GUTTER (TY II) | 620 LF | $90.00 | $32.57 | 2.76x | $35,608 |
| 505-7001 TMA (STATIONARY) | 40 DAY | $500.00 | $217.57 | 2.30x | $11,297 |
| 104-7017 REMOV CONC (CURB & GUTTER) | 586 LF | $25.00 | $8.04 | 3.11x | $9,938 |
| 536-7002 CONC MEDIAN | 58 SY | $220.00 | $92.13 | 2.39x | $7,417 |
| 432-7001 RIPRAP (CONC)(4 IN) | 12 CY | $1,100.00 | $573.24 | 1.92x | $6,321 |
| 531-7001 CONC SIDEWALKS (4") | 60 SY | $160.00 | $70.57 | 2.27x | $5,366 |
| 401-7001 FLOWABLE BACKFILL | 2 CY | $2,500.00 | $298.77 | 8.37x | $4,402 |
| 467-7326 SET (TY II) (24 IN) (RCP) (4: 1) (C) | 2 EA | $4,000.00 | $2,065.28 | 1.94x | $3,869 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 40 DAY | $180.00 | $87.82 | 2.05x | $3,687 |
| 500-7001 MOBILIZATION | 1 LS | $90,000.00 | $523,850.32 | 0.17x | -$433,850 |
SCOTT TUCKER CONSTRUCTION COMPANY, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 536-7002 CONC MEDIAN | 58 SY | $653.00 | $92.13 | 7.09x | $32,531 |
| 529-7009 CONC CURB & GUTTER (TY II) | 620 LF | $74.00 | $32.57 | 2.27x | $25,688 |
| 467-7326 SET (TY II) (24 IN) (RCP) (4: 1) (C) | 2 EA | $10,482.00 | $2,065.28 | 5.08x | $16,833 |
| 531-7001 CONC SIDEWALKS (4") | 60 SY | $333.00 | $70.57 | 4.72x | $15,746 |
| 104-7017 REMOV CONC (CURB & GUTTER) | 586 LF | $27.00 | $8.04 | 3.36x | $11,110 |
| 432-7001 RIPRAP (CONC)(4 IN) | 12 CY | $1,327.00 | $573.24 | 2.31x | $9,045 |
| 400-7008 CUT & RESTORE ASPH PAVING | 10 SY | $980.00 | $140.13 | 6.99x | $8,399 |
| 505-7001 TMA (STATIONARY) | 40 DAY | $397.00 | $217.57 | 1.82x | $7,177 |
| 464-7034 RC PIPE (CL V)(24 IN) | 10 LF | $576.00 | $156.72 | 3.68x | $4,193 |
| 500-7001 MOBILIZATION | 1 LS | $28,800.00 | $523,850.32 | 0.05x | -$495,050 |