Bridge Replacement Anderson Creek
0722-03-016 · let Sep 3, 2026 · Red River, Paris · Bridge Replacement
$1,474,741Low bid: LONGVIEW BRIDGE AND ROAD, LTD.-13.6% vs estimate $1,707,257
$54,239Left on the table3.7% gap to the second bid
8BiddersSpread 25% low to high
52Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | LONGVIEW BRIDGE AND ROAD, LTD. | $1,474,741 | -13.6% | $54,239 | 1+$10,559 | 5-$539,918 | |
| 2 | THK CONSTRUCTION LLC | $1,528,980 | +3.7% | -10.4% | $113,300 | 3+$44,615 | 5-$517,734 |
| 3 | DRAKE COMPANIES LLC | $1,642,280 | +11.4% | -3.8% | $12,159 | 2+$29,052 | 3-$447,471 |
| 4 | EAST TEXAS BRIDGE, INC. | $1,654,439 | +12.2% | -3.1% | $41,803 | 2+$20,079 | 3-$439,173 |
| 5 | HIGHWAY 19 CONSTRUCTION LLC | $1,696,242 | +15.0% | -0.6% | $3,546 | 3+$97,363 | 4-$472,791 |
| 6 | RB CONTRACTING, LLC | $1,699,789 | +15.3% | -0.4% | $123,342 | ||
| 7 | GARRET SHIELDS INFRASTRUCTURE | $1,823,131 | +23.6% | 6.8% | $20,634 | ||
| 8 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $1,843,764 | +25.0% | 8.0% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
LONGVIEW BRIDGE AND ROAD, LTD. vs THK CONSTRUCTION LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 341-7003 D-GR HMA TY-B PG64-22 (EXEMPT) | 1,823 TON | $150.00 | $168.66 | $127.48 | $34,017 |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 1,077 CY | $170.00 | $140.00 | $184.74 | -$32,310 |
| 251-7015 REWORK BS MTL (TY A)(12")(ORD COMP) | 1,904 SY | $5.00 | $18.00 | $5.00 | $24,752 |
| 500-7001 MOBILIZATION | 1 LS | $100,000.00 | $120,000.00 | $523,850.32 | $20,000 |
| 105-7052 RMV (0"-12") TRT/UNTRT BASE & ASPH PAV | 1,298 SY | $5.00 | $15.00 | $7.43 | $12,980 |
| 132-7003 EMBANK (FNL)(OC)(TY B) | 5,908 CY | $10.00 | $12.00 | $16.96 | $11,816 |
| 422-7001 REINF CONC SLAB | 3,800 SF | $30.00 | $27.00 | $24.45 | -$11,400 |
| 450-7008 RAIL (TY T223) | 250 LF | $130.00 | $175.00 | $141.07 | $11,250 |
| 416-7002 DRILL SHAFT (18 IN) | 148 LF | $152.00 | $79.03 | $161.72 | -$10,800 |
| 341-7034 D-GR HMA TY-C SAC-A PG64-22(EXEMPT) | 683 TON | $150.00 | $165.69 | $136.91 | $10,716 |
| 422-7013 APPROACH SLAB | 61 CY | $950.00 | $800.00 | $738.51 | -$9,150 |
| 416-7006 DRILL SHAFT (36 IN) | 296 LF | $280.00 | $252.43 | $280.58 | -$8,161 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $1,000.00 | $5,000.00 | $9,253.78 | $8,000 |
| 506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) | 78 SY | $79.00 | $1.00 | $30.47 | -$6,084 |
| 420-7012 CL C CONC (ABUT) | 56.2 CY | $900.00 | $1,000.00 | $1,307.98 | $5,620 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 34.6 CY | $600.00 | $750.00 | $616.83 | $5,190 |
| 505-7001 TMA (STATIONARY) | 66 DAY | $250.00 | $200.00 | $217.57 | -$3,300 |
| 506-7002 ROCK FILTER DAMS (INSTALL) (TY 2) | 100 LF | $62.00 | $30.00 | $44.91 | -$3,200 |
| 425-7003 PRESTR CONC GIRDER (TX40) | 472.5 LF | $300.00 | $293.26 | $213.86 | -$3,185 |
| 530-7015 DRIVEWAYS (BASE) | 131 SY | $23.25 | $45.00 | $27.85 | $2,849 |
Positive: the low bidder was cheaper on that item. These 20 items account for $59,602 of the $54,239 gap.
LONGVIEW BRIDGE AND ROAD, LTD.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 662-7035 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 2,640 LF | $4.40 | $0.4002 | 10.99x | $10,559 |
| 500-7001 MOBILIZATION | 1 LS | $100,000.00 | $523,850.32 | 0.19x | -$423,850 |
| 100-7002 PREPARING ROW | 13.3 STA | $2,000.00 | $6,072.92 | 0.33x | -$54,170 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,670.00 | $11,585.04 | 0.23x | -$35,660 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $1,000.00 | $9,253.78 | 0.11x | -$16,508 |
| 5011-7002 REMOVE LEAD-CONTAINING COATING (OTHER) | 1 LS | $6,050.00 | $15,780.56 | 0.38x | -$9,731 |
THK CONSTRUCTION LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 251-7015 REWORK BS MTL (TY A)(12")(ORD COMP) | 1,904 SY | $18.00 | $5.00 | 3.60x | $24,752 |
| 662-7035 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 2,640 LF | $4.20 | $0.4002 | 10.49x | $10,031 |
| 105-7052 RMV (0"-12") TRT/UNTRT BASE & ASPH PAV | 1,298 SY | $15.00 | $7.43 | 2.02x | $9,832 |
| 500-7001 MOBILIZATION | 1 LS | $120,000.00 | $523,850.32 | 0.23x | -$403,850 |
| 100-7002 PREPARING ROW | 13.3 STA | $2,000.00 | $6,072.92 | 0.33x | -$54,170 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,220.12 | $11,585.04 | 0.19x | -$37,460 |
| 416-7002 DRILL SHAFT (18 IN) | 148 LF | $79.03 | $161.72 | 0.49x | -$12,238 |
| 5011-7002 REMOVE LEAD-CONTAINING COATING (OTHER) | 1 LS | $5,764.50 | $15,780.56 | 0.37x | -$10,016 |
DRAKE COMPANIES LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $18,500.00 | $9,253.78 | 2.00x | $18,492 |
| 662-7035 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 2,640 LF | $4.40 | $0.4002 | 10.99x | $10,559 |
| 500-7001 MOBILIZATION | 1 LS | $125,000.00 | $523,850.32 | 0.24x | -$398,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,000.00 | $11,585.04 | 0.17x | -$38,340 |
| 5011-7002 REMOVE LEAD-CONTAINING COATING (OTHER) | 1 LS | $5,500.00 | $15,780.56 | 0.35x | -$10,281 |
EAST TEXAS BRIDGE, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 662-7035 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 2,640 LF | $4.40 | $0.4002 | 10.99x | $10,559 |
| 251-7015 REWORK BS MTL (TY A)(12")(ORD COMP) | 1,904 SY | $10.00 | $5.00 | 2.00x | $9,520 |
| 500-7001 MOBILIZATION | 1 LS | $130,000.00 | $523,850.32 | 0.25x | -$393,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $3,500.00 | $11,585.04 | 0.30x | -$32,340 |
| 416-7002 DRILL SHAFT (18 IN) | 148 LF | $74.00 | $161.72 | 0.46x | -$12,982 |
HIGHWAY 19 CONSTRUCTION LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 425-7003 PRESTR CONC GIRDER (TX40) | 472.5 LF | $379.00 | $213.86 | 1.77x | $78,027 |
| 105-7052 RMV (0"-12") TRT/UNTRT BASE & ASPH PAV | 1,298 SY | $15.00 | $7.43 | 2.02x | $9,832 |
| 662-7035 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 2,640 LF | $4.00 | $0.4002 | 10.00x | $9,503 |
| 500-7001 MOBILIZATION | 1 LS | $150,000.00 | $523,850.32 | 0.29x | -$373,850 |
| 100-7002 PREPARING ROW | 13.3 STA | $2,500.00 | $6,072.92 | 0.41x | -$47,520 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,500.00 | $11,585.04 | 0.22x | -$36,340 |
| 5011-7002 REMOVE LEAD-CONTAINING COATING (OTHER) | 1 LS | $700.00 | $15,780.56 | 0.04x | -$15,081 |