CR 125 Bridge Replacement 2711
0913-09-134 · let Sep 2, 2026 · Wharton, Yoakum · Bridge Replacement
$2,677,071Low bid: Rucoba & Maya Construction, LLC+14.2% vs estimate $2,343,468
$22,353Left on the table0.8% gap to the second bid
12BiddersSpread 64% low to high
112Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | Rucoba & Maya Construction, LLC | $2,677,071 | 14.2% | $22,353 | 0 | 4-$584,436 | |
| 2 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $2,699,424 | +0.8% | 15.2% | $93,952 | 3+$82,827 | 2-$200,797 |
| 3 | R CONSTRUCTION CIVIL, LLC | $2,793,376 | +4.3% | 19.2% | $120,867 | 2+$86,266 | 4-$645,103 |
| 4 | E-Z BEL CONSTRUCTION, LLC | $2,914,243 | +8.9% | 24.4% | $31,973 | 4+$109,006 | 1-$140,351 |
| 5 | STX CIVIL | $2,946,216 | +10.1% | 25.7% | $50,819 | 4+$176,505 | 3-$477,757 |
| 6 | TREVWAY, INC. | $2,997,035 | +12.0% | 27.9% | $43,283 | ||
| 7 | JOHN REED AND COMPANY, LLC | $3,040,317 | +13.6% | 29.7% | $134,584 | ||
| 8 | PRESIDIO CONTRACTING, LLC | $3,174,902 | +18.6% | 35.5% | $289,347 | ||
| 9 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $3,464,249 | +29.4% | 47.8% | $19,768 | ||
| 10 | FORDE CONSTRUCTION COMPANY, INC. | $3,484,017 | +30.1% | 48.7% | $9,855 | ||
| 11 | JFO SERVICES, LLC | $3,493,872 | +30.5% | 49.1% | $884,849 | ||
| 12 | CASTILLO ARANDA LLC | $4,378,721 | +63.6% | 86.8% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
Rucoba & Maya Construction, LLC vs TEXAS STEEL INDUSTRIAL PLACING, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $195,000.00 | $269,918.15 | $523,850.32 | $74,918 |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 4,711 CY | $150.00 | $135.00 | $184.74 | -$70,665 |
| 425-7027 PRESTR CONC BOX BEAM (5B20) | 774 LF | $364.68 | $290.00 | $294.26 | -$57,802 |
| 496-7009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 3 EA | $12,000.00 | $25,000.00 | $28,021.15 | $39,000 |
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 26 CY | $115.58 | $1,450.00 | $111.76 | $34,695 |
| 425-7016 PRESTR CONC SLAB BEAM (4SB12) | 711 LF | $241.25 | $290.00 | $259.02 | $34,661 |
| 316-7194 AGGR (TY-E, GR-5)(SAC-B) | 25 CY | $119.48 | $1,450.00 | $156.13 | $33,263 |
| 416-7005 DRILL SHAFT (30 IN) | 930 LF | $295.14 | $275.00 | $239.74 | -$18,730 |
| 247-7196 FL BS (CMP IN PLC)(TY E GR 5)(FNAL POS) | 912 CY | $110.00 | $90.00 | $88.48 | -$18,240 |
| 416-7004 DRILL SHAFT (24 IN) | 360 LF | $219.44 | $265.00 | $234.98 | $16,402 |
| 468-7002 THERMOPLASTIC PIPE (PP) (24") | 240 LF | $125.00 | $65.00 | $108.87 | -$14,400 |
| 110-7001 EXCAV (ROADWAY) | 2,178 CY | $18.00 | $12.00 | $11.68 | -$13,068 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $600.00 | $1,500.00 | $11,585.04 | $12,600 |
| 425-7017 PRESTR CONC SLAB BEAM (5SB12) | 237 LF | $241.25 | $290.00 | $242.93 | $11,554 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 1,047 CY | $27.00 | $18.00 | $18.71 | -$9,423 |
| 316-7264 ASPH (AC 20-5TR OR AC-20XP OR CRS-2P) | 1,177 GAL | $10.00 | $17.50 | $4.17 | $8,828 |
| 454-7003 ARMOR JOINT (SEALED) | 170 LF | $150.00 | $100.00 | $154.25 | -$8,500 |
| 110-7002 EXCAV (CHANNEL) | 1,269 CY | $18.00 | $12.00 | $16.69 | -$7,614 |
| 316-7016 ASPH (RC-250) | 691 GAL | $9.50 | $19.75 | $5.28 | $7,083 |
| 420-7038 CL C CONC (COLUMN) | 7.6 CY | $2,400.00 | $1,500.00 | $1,548.37 | -$6,840 |
Positive: the low bidder was cheaper on that item. These 20 items account for $47,720 of the $22,353 gap.
Rucoba & Maya Construction, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $195,000.00 | $523,850.32 | 0.37x | -$328,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $600.00 | $11,585.04 | 0.05x | -$153,791 |
| 100-7002 PREPARING ROW | 11.75 STA | $1,500.00 | $6,072.92 | 0.25x | -$53,732 |
| 496-7009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 3 EA | $12,000.00 | $28,021.15 | 0.43x | -$48,063 |
TEXAS STEEL INDUSTRIAL PLACING, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 26 CY | $1,450.00 | $111.76 | 12.97x | $34,794 |
| 316-7194 AGGR (TY-E, GR-5)(SAC-B) | 25 CY | $1,450.00 | $156.13 | 9.29x | $32,347 |
| 316-7264 ASPH (AC 20-5TR OR AC-20XP OR CRS-2P) | 1,177 GAL | $17.50 | $4.17 | 4.19x | $15,686 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $1,500.00 | $11,585.04 | 0.13x | -$141,191 |
| 100-7002 PREPARING ROW | 11.75 STA | $1,000.00 | $6,072.92 | 0.16x | -$59,607 |
R CONSTRUCTION CIVIL, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 26 CY | $1,825.00 | $111.76 | 16.33x | $44,544 |
| 316-7194 AGGR (TY-E, GR-5)(SAC-B) | 25 CY | $1,825.00 | $156.13 | 11.69x | $41,722 |
| 500-7001 MOBILIZATION | 1 LS | $60,000.00 | $523,850.32 | 0.11x | -$463,850 |
| 422-7005 REINF CONC SLAB (BOX BEAM) | 3,922 SF | $17.00 | $35.96 | 0.47x | -$74,347 |
| 420-7012 CL C CONC (ABUT) | 82.6 CY | $650.00 | $1,307.98 | 0.50x | -$54,349 |
| 100-7002 PREPARING ROW | 11.75 STA | $1,600.00 | $6,072.92 | 0.26x | -$52,557 |
E-Z BEL CONSTRUCTION, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 26 CY | $1,425.00 | $111.76 | 12.75x | $34,144 |
| 316-7194 AGGR (TY-E, GR-5)(SAC-B) | 25 CY | $1,450.00 | $156.13 | 9.29x | $32,347 |
| 110-7001 EXCAV (ROADWAY) | 2,178 CY | $24.00 | $11.68 | 2.05x | $26,828 |
| 316-7264 ASPH (AC 20-5TR OR AC-20XP OR CRS-2P) | 1,177 GAL | $17.50 | $4.17 | 4.19x | $15,686 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $1,560.00 | $11,585.04 | 0.13x | -$140,351 |
STX CIVIL: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 110-7001 EXCAV (ROADWAY) | 2,178 CY | $41.79 | $11.68 | 3.58x | $65,575 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 1,047 CY | $62.28 | $18.71 | 3.33x | $45,615 |
| 316-7194 AGGR (TY-E, GR-5)(SAC-B) | 25 CY | $1,465.26 | $156.13 | 9.38x | $32,728 |
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 26 CY | $1,365.10 | $111.76 | 12.22x | $32,587 |
| 500-7001 MOBILIZATION | 1 LS | $223,280.70 | $523,850.32 | 0.43x | -$300,570 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $2,543.11 | $11,585.04 | 0.22x | -$126,587 |
| 100-7002 PREPARING ROW | 11.75 STA | $1,766.51 | $6,072.92 | 0.29x | -$50,600 |