FY26 Littlefield ASPPM
6499-14-001 · let Apr 21, 2026 · Lamb, Lubbock · Material Maintenance Project
$446,000Low bid: L A FULLER & SONS CONSTRUCTION, LTD.+1.9% vs estimate $437,500
$129,000Left on the table28.9% gap to the second bid
2BiddersSpread 29% low to high
5Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | L A FULLER & SONS CONSTRUCTION, LTD. | $446,000 | 1.9% | $129,000 | 0 | 0 | |
| 2 | TOUCHSTONE RESOURCES, LLC | $575,000 | +28.9% | 31.4% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
L A FULLER & SONS CONSTRUCTION, LTD. vs TOUCHSTONE RESOURCES, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8012-7097 ASPH CONC PAT MAT(ASPPM)(DEL)(ST1) | 500 TON | $171.00 | $240.00 | $179.36 | $34,500 |
| 8012-7098 ASPH CONC PAT MAT(ASPPM)(DEL)(ST2) | 500 TON | $175.20 | $230.00 | $172.07 | $27,400 |
| 8012-7100 ASPH CONC PAT MAT(ASPPM)(DEL)(ST4) | 500 TON | $183.95 | $230.00 | $190.24 | $23,025 |
| 8012-7101 ASPH CONC PAT MAT(ASPPM)(DEL)(ST5) | 500 TON | $183.95 | $230.00 | $189.31 | $23,025 |
| 8012-7099 ASPH CONC PAT MAT(ASPPM)(DEL)(ST3) | 500 TON | $177.90 | $220.00 | $180.83 | $21,050 |
Positive: the low bidder was cheaper on that item. These 5 items account for $129,000 of the $129,000 gap.