FM 531 SAFETY IMPROVEMENT 2606
0269-10-028 · let Apr 7, 2026 · Lavaca, Yoakum · Safety Improvement Projects
$2,566,089Low bid: HUNTER INDUSTRIES, LTD.+17.8% vs estimate $2,177,688
$388,323Left on the table15.1% gap to the second bid
3BiddersSpread 34% low to high
115Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | HUNTER INDUSTRIES, LTD. | $2,566,089 | 17.8% | $388,323 | 0 | 3-$448,297 | |
| 2 | E-Z BEL CONSTRUCTION, LLC | $2,954,412 | +15.1% | 35.7% | $482,321 | 4+$127,798 | 3-$155,797 |
| 3 | ACME BRIDGE COMPANY, INC. | $3,436,733 | +33.9% | 57.8% | 5+$383,850 | 2-$90,649 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
HUNTER INDUSTRIES, LTD. vs E-Z BEL CONSTRUCTION, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 341-7002 D-GR HMA TY-B SAC-B PG64-22 | 3,862 TON | $94.60 | $144.00 | $109.80 | $190,783 |
| 500-7001 MOBILIZATION | 1 LS | $189,215.94 | $285,000.00 | $523,850.32 | $95,784 |
| 341-7050 D-GR HMA TY-D SAC-B PG70-22 | 6,062 TON | $102.43 | $115.00 | $116.75 | $76,199 |
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 383 CY | $121.42 | $300.00 | $111.76 | $68,396 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $9,972.13 | $2,050.00 | $11,585.04 | -$55,455 |
| 100-7002 PREPARING ROW | 9.9 STA | $1,587.44 | $6,900.00 | $6,072.92 | $52,594 |
| 112-7001 SUBGR WIDEN (OC) | 157.98 STA | $440.00 | $200.00 | $458.34 | -$37,915 |
| 467-7156 SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1)(P) | 4 EA | $2,464.02 | $11,700.00 | $19,778.01 | $36,944 |
| 530-7010 DRIVEWAYS (ACP) | 1,380 SY | $44.00 | $20.00 | $54.96 | -$33,120 |
| 341-7004 D-GR HMA TY-B PG64-22 (LEVEL-UP) | 500 TON | $94.60 | $135.00 | $139.33 | $20,200 |
| 168-7001 VEGETATIVE WATERING | 443.26 TGL | $23.10 | $60.00 | $8.43 | $16,356 |
| 462-7015 CONC BOX CULV (7 FT X 3 FT) | 21 LF | $952.01 | $1,500.00 | $699.36 | $11,508 |
| 466-7189 WINGWALL (PW - 2) (HW=5 FT) | 1 EA | $15,680.10 | $26,500.00 | $18,305.05 | $10,820 |
| 464-7007 RC PIPE (CL III)(30 IN) | 84 LF | $224.00 | $110.00 | $140.03 | -$9,576 |
| 316-7264 ASPH (AC 20-5TR OR AC-20XP OR CRS-2P) | 16,910 GAL | $4.56 | $4.00 | $4.17 | -$9,470 |
| 134-7001 BACKFILL (TY A) | 152.28 STA | $121.00 | $180.00 | $224.26 | $8,985 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $3,603.65 | $7,500.00 | $9,253.78 | $7,793 |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,000 SY | $62.92 | $70.00 | $60.19 | $7,080 |
| 6025-7001 TMSP RADAR SPEED CONTROL MONITOR | 2 EA | $5,148.07 | $8,481.00 | $8,404.45 | $6,666 |
| 403-7001 TEMPORARY SPL SHORING | 256 SF | $56.00 | $30.00 | $25.56 | -$6,656 |
Positive: the low bidder was cheaper on that item. These 20 items account for $457,916 of the $388,323 gap.
HUNTER INDUSTRIES, LTD.: unbalanced items
Placed 1E-Z BEL CONSTRUCTION, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 383 CY | $300.00 | $111.76 | 2.68x | $72,098 |
| 168-7001 VEGETATIVE WATERING | 443.26 TGL | $60.00 | $8.43 | 7.11x | $22,857 |
| 462-7015 CONC BOX CULV (7 FT X 3 FT) | 21 LF | $1,500.00 | $699.36 | 2.14x | $16,814 |
| 400-7010 CEM STABIL BKFL | 113 CY | $280.00 | $138.14 | 2.03x | $16,030 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $2,050.00 | $11,585.04 | 0.18x | -$66,745 |
| 530-7010 DRIVEWAYS (ACP) | 1,380 SY | $20.00 | $54.96 | 0.36x | -$48,239 |
| 112-7001 SUBGR WIDEN (OC) | 157.98 STA | $200.00 | $458.34 | 0.44x | -$40,813 |
ACME BRIDGE COMPANY, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $32,500.00 | $11,585.04 | 2.81x | $146,405 |
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 383 CY | $383.00 | $111.76 | 3.43x | $103,887 |
| 316-7264 ASPH (AC 20-5TR OR AC-20XP OR CRS-2P) | 16,910 GAL | $9.00 | $4.17 | 2.16x | $81,631 |
| 6025-7001 TMSP RADAR SPEED CONTROL MONITOR | 2 EA | $25,200.00 | $8,404.45 | 3.00x | $33,591 |
| 168-7001 VEGETATIVE WATERING | 443.26 TGL | $49.80 | $8.43 | 5.90x | $18,336 |
| 530-7010 DRIVEWAYS (ACP) | 1,380 SY | $21.50 | $54.96 | 0.39x | -$46,169 |
| 100-7002 PREPARING ROW | 9.9 STA | $1,580.00 | $6,072.92 | 0.26x | -$44,480 |