FM 550 at Rabbit Ridge in Rockwall
1014-03-065 · let Apr 7, 2026 · Rockwall, Dallas · Traffic Control Devices
$2,341,217Low bid: O. TREVINO CONSTRUCTION, LLC+7.9% vs estimate $2,169,620
$278,284Left on the table11.9% gap to the second bid
8BiddersSpread 44% low to high
173Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | O. TREVINO CONSTRUCTION, LLC | $2,341,217 | 7.9% | $278,284 | 8+$198,877 | 2-$432,815 | |
| 2 | ED BELL CONSTRUCTION COMPANY | $2,619,501 | +11.9% | 20.7% | $139,704 | 3+$213,398 | 2-$416,315 |
| 3 | DURABLE SPECIALTIES, INC. | $2,759,205 | +17.9% | 27.2% | $65,551 | 9+$578,125 | 3-$629,037 |
| 4 | YUNEX LLC | $2,824,756 | +20.7% | 30.2% | $96,145 | 9+$590,904 | 2-$351,296 |
| 5 | JAGOE-PUBLIC COMPANY | $2,920,901 | +24.8% | 34.6% | $75,925 | 8+$417,661 | 1-$90,957 |
| 6 | SELECT MAINTENANCE, L.L.C. | $2,996,825 | +28.0% | 38.1% | $5,202 | ||
| 7 | ELECNOR BELCO ELECTRIC, INC. | $3,002,028 | +28.2% | 38.4% | $362,382 | ||
| 8 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | $3,364,410 | +43.7% | 55.1% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
O. TREVINO CONSTRUCTION, LLC vs ED BELL CONSTRUCTION COMPANY, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $15,000.00 | $31,500.00 | $11,585.04 | $115,500 |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 4 EA | $43,000.00 | $60,000.00 | $34,944.96 | $68,000 |
| 100-7002 PREPARING ROW | 17.93 STA | $7,435.00 | $9,450.00 | $6,072.92 | $36,129 |
| 168-7001 VEGETATIVE WATERING | 1,775 TGL | $17.25 | $2.10 | $8.43 | -$26,891 |
| 112-7001 SUBGR WIDEN (OC) | 17.93 STA | $2,400.00 | $1,050.00 | $458.34 | -$24,206 |
| 105-7129 REMOVING STAB BASE AND ASPH PAV(0"-16") | 327 SY | $75.00 | $26.25 | $4.46 | -$15,941 |
| 500-7001 MOBILIZATION | 1 LS | $231,350.00 | $247,000.00 | $523,850.32 | $15,650 |
| 628-7190 ELC SRV TY D 120/240 070(NS)SS(E)PS(U) | 4 EA | $11,500.00 | $15,000.00 | $10,517.16 | $14,000 |
| 6008-7001 RVDS (PRESENCE DETECTION ONLY) | 12 EA | $10,500.00 | $11,496.56 | $8,729.59 | $11,959 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 496 SY | $50.00 | $26.25 | $19.70 | -$11,780 |
| 530-7007 DRIVEWAYS (CONC) (HES) | 500 SY | $135.00 | $157.50 | $122.10 | $11,250 |
| 344-7011 SP MIXES SP-C SAC-B PG64-22 | 972 TON | $150.00 | $161.47 | $130.31 | $11,149 |
| 686-7008 INS TRF SIG PL AM (S)STR(TY B)LUM | 8 EA | $11,600.00 | $12,762.91 | $8,686.93 | $9,303 |
| 105-7046 RMV (0"-6") TRT/UNTRT BASE & ASPH PAV | 463 SY | $35.00 | $15.75 | $5.90 | -$8,913 |
| 530-7010 DRIVEWAYS (ACP) | 528 SY | $110.00 | $96.09 | $54.96 | -$7,344 |
| 686-7059 INS TRF SIG PL AM(S)1 ARM(55')LUM | 2 EA | $33,600.00 | $37,057.14 | $37,709.54 | $6,914 |
| 6008-7002 RVDS (ADVANCE DETECTION ONLY) | 7 EA | $9,250.00 | $10,195.97 | $8,159.94 | $6,622 |
| 344-7001 SP MIXES SP-B PG64-22 | 502 TON | $172.00 | $183.93 | $124.45 | $5,989 |
| 752-7002 SPOT TREE TRIMMING / BRUSH REMOVAL | 25 LF | $40.00 | $262.50 | $1.20 | $5,563 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 3,346 LF | $2.20 | $0.5500 | $0.2040 | -$5,521 |
Positive: the low bidder was cheaper on that item. These 20 items account for $217,431 of the $278,284 gap.
O. TREVINO CONSTRUCTION, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 558 SY | $140.00 | $60.19 | 2.33x | $44,533 |
| 112-7001 SUBGR WIDEN (OC) | 17.93 STA | $2,400.00 | $458.34 | 5.24x | $34,814 |
| 530-7010 DRIVEWAYS (ACP) | 528 SY | $110.00 | $54.96 | 2.00x | $29,063 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 286 CY | $100.00 | $18.71 | 5.34x | $23,248 |
| 105-7129 REMOVING STAB BASE AND ASPH PAV(0"-16") | 327 SY | $75.00 | $4.46 | 16.84x | $23,068 |
| 168-7001 VEGETATIVE WATERING | 1,775 TGL | $17.25 | $8.43 | 2.05x | $15,649 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 496 SY | $50.00 | $19.70 | 2.54x | $15,028 |
| 105-7046 RMV (0"-6") TRT/UNTRT BASE & ASPH PAV | 463 SY | $35.00 | $5.90 | 5.93x | $13,473 |
| 500-7001 MOBILIZATION | 1 LS | $231,350.00 | $523,850.32 | 0.44x | -$292,500 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 17 EA | $1,000.00 | $9,253.78 | 0.11x | -$140,314 |
ED BELL CONSTRUCTION COMPANY: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $31,500.00 | $11,585.04 | 2.72x | $139,405 |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 558 SY | $148.57 | $60.19 | 2.47x | $49,315 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 286 CY | $105.00 | $18.71 | 5.61x | $24,678 |
| 500-7001 MOBILIZATION | 1 LS | $247,000.00 | $523,850.32 | 0.47x | -$276,850 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 17 EA | $1,050.00 | $9,253.78 | 0.11x | -$139,464 |
DURABLE SPECIALTIES, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 247-7125 FL BS (CMP IN PLC)(TY D GR 1-2) (12") | 2,271 SY | $88.00 | $29.90 | 2.94x | $131,944 |
| 354-7003 PLANE & TEXT ASPH CONC PAV(0" TO 3") | 6,085 SY | $18.00 | $2.75 | 6.54x | $92,790 |
| 168-7001 VEGETATIVE WATERING | 1,775 TGL | $60.00 | $8.43 | 7.11x | $91,530 |
| 112-7001 SUBGR WIDEN (OC) | 17.93 STA | $5,000.00 | $458.34 | 10.91x | $81,432 |
| 505-7001 TMA (STATIONARY) | 210 DAY | $450.00 | $217.57 | 2.07x | $48,810 |
| 530-7010 DRIVEWAYS (ACP) | 528 SY | $145.00 | $54.96 | 2.64x | $47,543 |
| 162-7002 BLOCK SODDING | 8,937 SY | $9.00 | $4.39 | 2.05x | $41,220 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 496 SY | $65.00 | $19.70 | 3.30x | $22,468 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 286 CY | $90.00 | $18.71 | 4.81x | $20,388 |
| 500-7001 MOBILIZATION | 1 LS | $115,000.00 | $523,850.32 | 0.22x | -$408,850 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 17 EA | $70.00 | $9,253.78 | 0.01x | -$156,124 |
| 100-7002 PREPARING ROW | 17.93 STA | $2,500.00 | $6,072.92 | 0.41x | -$64,062 |
YUNEX LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 17 EA | $18,677.78 | $9,253.78 | 2.02x | $160,208 |
| 354-7003 PLANE & TEXT ASPH CONC PAV(0" TO 3") | 6,085 SY | $22.23 | $2.75 | 8.08x | $118,529 |
| 247-7125 FL BS (CMP IN PLC)(TY D GR 1-2) (12") | 2,271 SY | $70.28 | $29.90 | 2.35x | $91,702 |
| 112-7001 SUBGR WIDEN (OC) | 17.93 STA | $4,083.34 | $458.34 | 8.91x | $64,996 |
| 530-7010 DRIVEWAYS (ACP) | 528 SY | $155.56 | $54.96 | 2.83x | $53,119 |
| 168-7001 VEGETATIVE WATERING | 1,775 TGL | $28.57 | $8.43 | 3.39x | $35,742 |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 558 SY | $122.23 | $60.19 | 2.03x | $34,618 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 496 SY | $53.34 | $19.70 | 2.71x | $16,684 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 286 CY | $72.23 | $18.71 | 3.86x | $15,306 |
| 500-7001 MOBILIZATION | 1 LS | $228,488.89 | $523,850.32 | 0.44x | -$295,361 |
| 100-7002 PREPARING ROW | 17.93 STA | $2,953.34 | $6,072.92 | 0.49x | -$55,934 |
JAGOE-PUBLIC COMPANY: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $40,000.00 | $11,585.04 | 3.45x | $198,905 |
| 247-7125 FL BS (CMP IN PLC)(TY D GR 1-2) (12") | 2,271 SY | $55.00 | $29.90 | 1.84x | $57,001 |
| 530-7010 DRIVEWAYS (ACP) | 528 SY | $125.00 | $54.96 | 2.27x | $36,983 |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 558 SY | $120.00 | $60.19 | 1.99x | $33,373 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 496 SY | $70.00 | $19.70 | 3.55x | $24,948 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 286 CY | $100.00 | $18.71 | 5.34x | $23,248 |
| 105-7046 RMV (0"-6") TRT/UNTRT BASE & ASPH PAV | 463 SY | $55.00 | $5.90 | 9.32x | $22,733 |
| 112-7001 SUBGR WIDEN (OC) | 17.93 STA | $1,600.00 | $458.34 | 3.49x | $20,470 |
| 100-7002 PREPARING ROW | 17.93 STA | $1,000.00 | $6,072.92 | 0.16x | -$90,957 |