RM 473; 0142-09-049; SFT
0142-09-049 · let May 6, 2026 · Kendall, San Antonio · Safety Improvement Projects
$4,095,968Low bid: STX CIVIL+0.6% vs estimate $4,070,599
$148,845Left on the table3.6% gap to the second bid
7BiddersSpread 49% low to high
100Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | STX CIVIL | $4,095,968 | 0.6% | $148,845 | 5+$380,627 | 4-$1,993,244 | |
| 2 | JOE BLAND CONSTRUCTION LLC | $4,244,814 | +3.6% | 4.3% | $5,690 | 8+$383,128 | 2-$1,803,180 |
| 3 | ACME BRIDGE COMPANY, INC. | $4,250,503 | +3.8% | 4.4% | $176,511 | 5+$245,374 | 4-$1,887,202 |
| 4 | J. CARROLL WEAVER, INC. | $4,427,015 | +8.1% | 8.8% | $297,917 | 4+$525,292 | 2-$1,886,242 |
| 5 | HUNTER INDUSTRIES, LTD. | $4,724,932 | +15.4% | 16.1% | $3,479 | 6+$733,726 | 2-$1,786,589 |
| 6 | CLARK CONSTRUCTION OF TEXAS, INC. | $4,728,410 | +15.4% | 16.2% | $1,356,985 | ||
| 7 | DEAN WORD COMPANY, LTD. | $6,085,396 | +48.6% | 49.5% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
STX CIVIL vs JOE BLAND CONSTRUCTION LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 530-7016 DRIVEWAYS (SURF TREAT) | 5,074 SY | $43.00 | $10.00 | $34.56 | -$167,442 |
| 100-7002 PREPARING ROW | 315.35 STA | $341.93 | $750.00 | $6,072.92 | $128,685 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 13 MO | $1,595.80 | $7,750.00 | $11,585.04 | $80,005 |
| 316-7071 ASPH (AC-15P, AC-20-5TR OR AC-20XP) | 30,602 GAL | $7.39 | $5.00 | $3.42 | -$73,139 |
| 403-7001 TEMPORARY SPL SHORING | 1,623 SF | $21.12 | $60.00 | $25.56 | $63,102 |
| 105-7005 RMV (5"-9") TRT/UNTRT BASE & ASPH PAV | 22,456 SY | $2.42 | $5.00 | $4.05 | $57,936 |
| 110-7001 EXCAV (ROADWAY) | 14,005 CY | $18.91 | $15.00 | $11.68 | -$54,760 |
| 506-7011 ROCK FILTER DAMS (REMOVE) | 2,861 LF | $12.42 | $30.00 | $12.47 | $50,296 |
| 169-7010 SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL) | 46,860 SY | $2.48 | $1.50 | $2.71 | -$45,923 |
| 500-7001 MOBILIZATION | 1 LS | $315,624.45 | $275,000.00 | $523,850.32 | -$40,624 |
| 216-7001 PROOF ROLLING | 87 HR | $140.24 | $575.00 | $127.71 | $37,824 |
| 247-7188 FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) | 7,552 CY | $70.56 | $75.00 | $50.66 | $33,531 |
| 168-7001 VEGETATIVE WATERING | 1,707.82 TGL | $54.32 | $35.00 | $8.43 | -$32,995 |
| 150-7001 BLADING | 315.35 STA | $56.44 | $150.00 | $152.64 | $29,504 |
| 400-7006 CUT & RESTORING PAV | 146 SY | $376.12 | $180.00 | $171.81 | -$28,634 |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 54,882 SY | $2.47 | $2.00 | $1.95 | -$25,795 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 41,840 LF | $4.22 | $4.75 | $3.92 | $22,175 |
| 6089-7001 RESIDENTIAL DRIVEWAY TEMP SIGNAL SYSTEM | 13 MO | $10,157.15 | $8,500.00 | $6,943.78 | -$21,543 |
| 506-7002 ROCK FILTER DAMS (INSTALL) (TY 2) | 1,871 LF | $55.90 | $45.00 | $44.91 | -$20,394 |
| 464-7005 RC PIPE (CL III)(24 IN) | 80 LF | $106.09 | $355.00 | $108.34 | $19,913 |
Positive: the low bidder was cheaper on that item. These 20 items account for $11,724 of the $148,845 gap.
STX CIVIL: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 316-7071 ASPH (AC-15P, AC-20-5TR OR AC-20XP) | 30,602 GAL | $7.39 | $3.42 | 2.16x | $121,478 |
| 316-7224 AGGR (TY-PD, GR-4)(SAC-B) | 851 CY | $189.18 | $86.92 | 2.18x | $87,025 |
| 168-7001 VEGETATIVE WATERING | 1,707.82 TGL | $54.32 | $8.43 | 6.44x | $78,366 |
| 132-7008 EMBANK (FNL)(DC)(TY C1) | 1,376 CY | $63.85 | $17.39 | 3.67x | $63,929 |
| 400-7006 CUT & RESTORING PAV | 146 SY | $376.12 | $171.81 | 2.19x | $29,829 |
| 100-7002 PREPARING ROW | 315.35 STA | $341.93 | $6,072.92 | 0.06x | -$1,807,268 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 13 MO | $1,595.80 | $11,585.04 | 0.14x | -$129,860 |
| 150-7001 BLADING | 315.35 STA | $56.44 | $152.64 | 0.37x | -$30,336 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 400 DAY | $23.37 | $87.82 | 0.27x | -$25,779 |
JOE BLAND CONSTRUCTION LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 316-7224 AGGR (TY-PD, GR-4)(SAC-B) | 851 CY | $190.00 | $86.92 | 2.19x | $87,723 |
| 403-7001 TEMPORARY SPL SHORING | 1,623 SF | $60.00 | $25.56 | 2.35x | $55,895 |
| 132-7008 EMBANK (FNL)(DC)(TY C1) | 1,376 CY | $55.00 | $17.39 | 3.16x | $51,752 |
| 506-7011 ROCK FILTER DAMS (REMOVE) | 2,861 LF | $30.00 | $12.47 | 2.41x | $50,153 |
| 168-7001 VEGETATIVE WATERING | 1,707.82 TGL | $35.00 | $8.43 | 4.15x | $45,370 |
| 216-7001 PROOF ROLLING | 87 HR | $575.00 | $127.71 | 4.50x | $38,914 |
| 164-7075 BONDED FBR MTRX SEED (TEMP)(COOL) | 27,444 SY | $1.50 | $0.5266 | 2.85x | $26,714 |
| 164-7074 BONDED FBR MTRX SEED (TEMP)(WARM) | 27,444 SY | $1.50 | $0.5305 | 2.83x | $26,607 |
| 100-7002 PREPARING ROW | 315.35 STA | $750.00 | $6,072.92 | 0.12x | -$1,678,583 |
| 530-7016 DRIVEWAYS (SURF TREAT) | 5,074 SY | $10.00 | $34.56 | 0.29x | -$124,597 |
ACME BRIDGE COMPANY, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 168-7001 VEGETATIVE WATERING | 1,707.82 TGL | $54.90 | $8.43 | 6.51x | $79,356 |
| 506-7011 ROCK FILTER DAMS (REMOVE) | 2,861 LF | $37.00 | $12.47 | 2.97x | $70,180 |
| 400-7006 CUT & RESTORING PAV | 146 SY | $423.00 | $171.81 | 2.46x | $36,674 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 4,255 SY | $15.40 | $6.84 | 2.25x | $36,435 |
| 510-7001 ONE-WAY TRAF CONT (FLAGGER CONT) | 160 HR | $189.00 | $46.94 | 4.03x | $22,729 |
| 100-7002 PREPARING ROW | 315.35 STA | $641.00 | $6,072.92 | 0.11x | -$1,712,956 |
| 506-7003 ROCK FILTER DAMS (INSTALL) (TY 3) | 990 LF | $1.00 | $71.34 | 0.01x | -$69,641 |
| 169-7010 SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL) | 46,860 SY | $1.25 | $2.71 | 0.46x | -$68,233 |
| 150-7001 BLADING | 315.35 STA | $37.30 | $152.64 | 0.24x | -$36,372 |
J. CARROLL WEAVER, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 161-7002 COMPOST MANUF TOPSOIL (4") | 54,882 SY | $8.55 | $1.95 | 4.39x | $362,397 |
| 316-7101 AGGR (TY-B, GR-5)(SAC-A) | 278 CY | $455.96 | $242.40 | 1.88x | $59,370 |
| 530-7006 DRIVEWAYS (CONC) | 329 SY | $277.50 | $109.20 | 2.54x | $55,371 |
| 168-7001 VEGETATIVE WATERING | 1,707.82 TGL | $36.63 | $8.43 | 4.34x | $48,154 |
| 100-7002 PREPARING ROW | 315.35 STA | $174.73 | $6,072.92 | 0.03x | -$1,859,995 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 400 DAY | $22.20 | $87.82 | 0.25x | -$26,247 |
HUNTER INDUSTRIES, LTD.: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 110-7001 EXCAV (ROADWAY) | 14,005 CY | $49.50 | $11.68 | 4.24x | $529,638 |
| 316-7224 AGGR (TY-PD, GR-4)(SAC-B) | 851 CY | $154.40 | $86.92 | 1.78x | $57,427 |
| 150-7001 BLADING | 315.35 STA | $319.00 | $152.64 | 2.09x | $52,462 |
| 403-7001 TEMPORARY SPL SHORING | 1,623 SF | $49.96 | $25.56 | 1.95x | $39,600 |
| 168-7001 VEGETATIVE WATERING | 1,707.82 TGL | $26.40 | $8.43 | 3.13x | $30,683 |
| 132-7008 EMBANK (FNL)(DC)(TY C1) | 1,376 CY | $34.77 | $17.39 | 2.00x | $23,915 |
| 100-7002 PREPARING ROW | 315.35 STA | $742.50 | $6,072.92 | 0.12x | -$1,680,948 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 13 MO | $3,458.87 | $11,585.04 | 0.30x | -$105,640 |