6501-16-001 Hot Mix Refugio
6501-16-001 · let May 19, 2026 · Refugio, Corpus Christi · Material Maintenance Project
$439,500Low bid: TEXAS MATERIALS GROUP, INC.-0.2% vs estimate $440,500
$39,840Left on the table9.1% gap to the second bid
3BiddersSpread 24% low to high
2Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TEXAS MATERIALS GROUP, INC. | $439,500 | -0.2% | $39,840 | 0 | 0 | |
| 2 | COLORADO MATERIALS, LTD. | $479,340 | +9.1% | 8.8% | $66,860 | 0 | 0 |
| 3 | ANDERSON COLUMBIA CO., INC. | $546,200 | +24.3% | 24.0% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
TEXAS MATERIALS GROUP, INC. vs COLORADO MATERIALS, LTD., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8011-7056 D-GR HMA TY D PG 64-22 (DEL) SITE 1 | 4,000 TON | $108.00 | $117.46 | $99.54 | $37,840 |
| 8011-7055 D-GR HMA TY D PG 64-22 (PICKUP) | 100 TON | $75.00 | $95.00 | $89.12 | $2,000 |
Positive: the low bidder was cheaper on that item. These 2 items account for $39,840 of the $39,840 gap.