6500-64-001 Hot Mix Goliad Maint
6500-64-001 · let May 19, 2026 · Goliad, Corpus Christi · Material Maintenance Project
$514,500Low bid: TEXAS MATERIALS GROUP, INC.-3.7% vs estimate $534,000
$79,500Left on the table15.5% gap to the second bid
3BiddersSpread 16% low to high
1Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TEXAS MATERIALS GROUP, INC. | $514,500 | -3.7% | $79,500 | 0 | 0 | |
| 2 | BRAUNTEX MATERIALS, INC. | $594,000 | +15.5% | 11.2% | $1,560 | 0 | 0 |
| 3 | COLORADO MATERIALS, LTD. | $595,560 | +15.8% | 11.5% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
TEXAS MATERIALS GROUP, INC. vs BRAUNTEX MATERIALS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8011-7056 D-GR HMA TY D PG 64-22 (DEL) SITE 1 | 6,000 TON | $85.75 | $99.00 | $99.54 | $79,500 |
Positive: the low bidder was cheaper on that item. These 1 items account for $79,500 of the $79,500 gap.