RMC-Mill, Inlay and Pavement Repair
6498-92-001 · let May 19, 2026 · San Patricio, Corpus Christi · Routine Maintenance Project - Sealed
$517,855Low bid: CK NEWBERRY, LLC+3.9% vs estimate $498,201
$7,994Left on the table1.5% gap to the second bid
3BiddersSpread 8% low to high
33Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | CK NEWBERRY, LLC | $517,855 | 3.9% | $7,994 | 1+$20,979 | 3-$506,012 | |
| 2 | HUNTER INDUSTRIES, LTD. | $525,849 | +1.5% | 5.5% | $35,698 | 1+$4,216 | 2-$496,743 |
| 3 | ANDERSON COLUMBIA CO., INC. | $561,547 | +8.4% | 12.7% | 2+$45,832 | 2-$527,180 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
CK NEWBERRY, LLC vs HUNTER INDUSTRIES, LTD., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 136 DAY | $15.00 | $351.79 | $217.57 | $45,803 |
| 341-7050 D-GR HMA TY-D SAC-B PG70-22 | 1,758 TON | $135.00 | $115.50 | $116.75 | -$34,281 |
| 351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 615 SY | $70.00 | $52.23 | $35.89 | -$10,929 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 MO | $10,000.00 | $4,958.23 | $11,585.04 | -$10,084 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $40,361.13 | $523,850.32 | -$9,639 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 68 DAY | $20.00 | $125.64 | $87.82 | $7,184 |
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 15,975 SY | $1.50 | $1.87 | $1.62 | $5,911 |
| 316-7212 AGGR (TY-PB, GR-4S OR 4)(SAC-B) | 305 CY | $145.00 | $162.36 | $125.13 | $5,295 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 672 LF | $5.00 | $11.50 | $5.23 | $4,368 |
| 316-7263 ASPH (MULTI OPTION) | 13,070 GAL | $4.00 | $4.24 | $3.89 | $3,137 |
| 662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W | 1,116 EA | $0.5000 | $1.60 | $1.03 | $1,228 |
| 341-7082 TACK COAT | 1,278 GAL | $4.00 | $3.19 | $3.93 | -$1,035 |
| 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 910 EA | $0.5000 | $1.60 | $0.5715 | $1,001 |
| 506-7046 BIODEG EROSN CONT LOGS (REMOVE) | 672 LF | $2.00 | $2.50 | $1.29 | $336 |
| 666-7422 REFL PAV MRK TY I (Y)6"(SLD)(090MIL) | 13,530 LF | $0.6000 | $0.5800 | $0.5014 | -$271 |
| 666-7407 REFL PAV MRK TY I (W)6"(BRK)(090MIL) | 2,980 LF | $0.6500 | $0.6400 | $0.5397 | -$30 |
| 662-7005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) | 1,490 LF | $0.5000 | $0.5000 | $0.3316 | $0 |
| 662-7008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) | 140 LF | $0.8500 | $0.8500 | $0.2750 | $0 |
| 662-7012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) | 120 LF | $0.9500 | $0.9500 | $0.6092 | $0 |
| 662-7015 WK ZN PAV MRK NON-REMOV (W)12"(SLD) | 88 LF | $2.00 | $2.00 | $2.55 | $0 |
Positive: the low bidder was cheaper on that item. These 20 items account for $7,994 of the $7,994 gap.
CK NEWBERRY, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 615 SY | $70.00 | $35.89 | 1.95x | $20,979 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $523,850.32 | 0.10x | -$473,850 |
| 505-7001 TMA (STATIONARY) | 136 DAY | $15.00 | $217.57 | 0.07x | -$27,550 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 68 DAY | $20.00 | $87.82 | 0.23x | -$4,612 |
HUNTER INDUSTRIES, LTD.: unbalanced items
Placed 2ANDERSON COLUMBIA CO., INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 15,975 SY | $3.25 | $1.62 | 2.01x | $26,082 |
| 351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 615 SY | $68.00 | $35.89 | 1.89x | $19,749 |
| 500-7001 MOBILIZATION | 1 LS | $24,900.00 | $523,850.32 | 0.05x | -$498,950 |
| 505-7001 TMA (STATIONARY) | 136 DAY | $10.00 | $217.57 | 0.05x | -$28,230 |