SH302_MarianDriveTurnLanes
0463-07-055 · let May 7, 2026 · Ector, Odessa · Intersection & Operational Imprv
$1,275,100Low bid: RAGLE CONSTRUCTION, INC.-1.9% vs estimate $1,299,947
$76,018Left on the table6.0% gap to the second bid
3BiddersSpread 63% low to high
58Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | RAGLE CONSTRUCTION, INC. | $1,275,100 | -1.9% | $76,018 | 8+$326,532 | 1-$393,850 | |
| 2 | REECE ALBERT, INC. | $1,351,118 | +6.0% | 3.9% | $726,660 | 7+$384,430 | 3-$449,179 |
| 3 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | $2,077,778 | +63.0% | 59.8% | 12+$871,155 | 1-$315,293 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
RAGLE CONSTRUCTION, INC. vs REECE ALBERT, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $24,500.00 | $5,050.63 | $11,585.04 | -$58,348 |
| 344-7005 SP MIXES SP-B SAC-B PG70-22 | 1,121 TON | $130.00 | $180.95 | $94.47 | $57,115 |
| 347-7001 TOM-C PG76-22 SAC-A | 874 TON | $170.00 | $228.03 | $169.86 | $50,718 |
| 6025-7001 TMSP RADAR SPEED CONTROL MONITOR | 2 EA | $17,500.00 | $1,721.51 | $8,404.45 | -$31,557 |
| 112-7001 SUBGR WIDEN (OC) | 18 STA | $1,500.00 | $3,154.15 | $458.34 | $29,775 |
| 530-7010 DRIVEWAYS (ACP) | 285 SY | $124.00 | $222.61 | $54.96 | $28,104 |
| 132-7003 EMBANK (FNL)(OC)(TY B) | 250 CY | $100.00 | $9.13 | $16.96 | -$22,718 |
| 500-7001 MOBILIZATION | 1 LS | $130,000.00 | $107,640.21 | $523,850.32 | -$22,360 |
| 110-7001 EXCAV (ROADWAY) | 250 CY | $100.00 | $15.41 | $11.68 | -$21,148 |
| 247-7069 FL BS (CMP IN PLC)(TY A GR 4) (8") | 1,940 SY | $11.00 | $21.89 | $17.87 | $21,127 |
| 416-7040 DRILL SHAFT (RDWY ILL POLE) (30 IN) | 80 LF | $550.00 | $289.26 | $270.84 | -$20,859 |
| 618-7030 CONDT (PVC) (SCH 40) (2") | 1,990 LF | $7.00 | $17.47 | $13.17 | $20,835 |
| 512-7097 PORT CTB (REMOVE) (TL-3 LPCB) | 2,000 LF | $13.00 | $21.47 | $17.35 | $16,940 |
| 610-7200 IN RD IL (TY SA) 50T-12 (400W EQ) LED | 8 EA | $8,500.00 | $6,658.54 | $5,867.03 | -$14,732 |
| 150-7002 BLADING | 20 HR | $160.00 | $615.31 | $171.50 | $9,106 |
| 505-7003 TMA (MOBILE OPERATION) | 15 DAY | $250.00 | $741.39 | $229.60 | $7,371 |
| 467-7323 SET (TY II) (24 IN) (CMP) (6: 1) (C) | 1 EA | $3,500.00 | $9,762.70 | $3,471.43 | $6,263 |
| 628-7048 ELC SRV TY A 240/480 060(NS)SS(E)SP(O) | 1 EA | $14,000.00 | $8,186.73 | $10,248.93 | -$5,813 |
| 662-7008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) | 5,000 LF | $0.4500 | $1.53 | $0.2750 | $5,400 |
| 662-7038 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) | 5,000 LF | $0.4500 | $1.53 | $0.2770 | $5,400 |
Positive: the low bidder was cheaper on that item. These 20 items account for $60,619 of the $76,018 gap.
RAGLE CONSTRUCTION, INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 512-7093 PORT CTB (FURN & INST)(TL-3 LPCB) | 2,000 LF | $150.00 | $67.00 | 2.24x | $165,997 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $24,500.00 | $11,585.04 | 2.11x | $38,745 |
| 416-7040 DRILL SHAFT (RDWY ILL POLE) (30 IN) | 80 LF | $550.00 | $270.84 | 2.03x | $22,333 |
| 110-7001 EXCAV (ROADWAY) | 250 CY | $100.00 | $11.68 | 8.56x | $22,079 |
| 132-7003 EMBANK (FNL)(OC)(TY B) | 250 CY | $100.00 | $16.96 | 5.90x | $20,759 |
| 530-7010 DRIVEWAYS (ACP) | 285 SY | $124.00 | $54.96 | 2.26x | $19,678 |
| 112-7001 SUBGR WIDEN (OC) | 18 STA | $1,500.00 | $458.34 | 3.27x | $18,750 |
| 6025-7001 TMSP RADAR SPEED CONTROL MONITOR | 2 EA | $17,500.00 | $8,404.45 | 2.08x | $18,191 |
| 500-7001 MOBILIZATION | 1 LS | $130,000.00 | $523,850.32 | 0.25x | -$393,850 |
REECE ALBERT, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 512-7093 PORT CTB (FURN & INST)(TL-3 LPCB) | 2,000 LF | $150.89 | $67.00 | 2.25x | $167,777 |
| 344-7005 SP MIXES SP-B SAC-B PG70-22 | 1,121 TON | $180.95 | $94.47 | 1.92x | $96,945 |
| 112-7001 SUBGR WIDEN (OC) | 18 STA | $3,154.15 | $458.34 | 6.88x | $48,525 |
| 530-7010 DRIVEWAYS (ACP) | 285 SY | $222.61 | $54.96 | 4.05x | $47,782 |
| 150-7002 BLADING | 20 HR | $615.31 | $171.50 | 3.59x | $8,876 |
| 505-7003 TMA (MOBILE OPERATION) | 15 DAY | $741.39 | $229.60 | 3.23x | $7,677 |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 6,000 LF | $1.64 | $0.4986 | 3.29x | $6,848 |
| 500-7001 MOBILIZATION | 1 LS | $107,640.21 | $523,850.32 | 0.21x | -$416,210 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $5,050.63 | $11,585.04 | 0.44x | -$19,603 |
| 6025-7001 TMSP RADAR SPEED CONTROL MONITOR | 2 EA | $1,721.51 | $8,404.45 | 0.20x | -$13,366 |
JONES BROS. DIRT & PAVING CONTRACTORS, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 512-7093 PORT CTB (FURN & INST)(TL-3 LPCB) | 2,000 LF | $240.00 | $67.00 | 3.58x | $345,997 |
| 344-7005 SP MIXES SP-B SAC-B PG70-22 | 1,121 TON | $228.00 | $94.47 | 2.41x | $149,688 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $50,000.00 | $11,585.04 | 4.32x | $115,245 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $23,125.00 | $9,253.78 | 2.50x | $55,485 |
| 112-7001 SUBGR WIDEN (OC) | 18 STA | $3,500.00 | $458.34 | 7.64x | $54,750 |
| 247-7069 FL BS (CMP IN PLC)(TY A GR 4) (8") | 1,940 SY | $39.94 | $17.87 | 2.23x | $42,815 |
| 416-7040 DRILL SHAFT (RDWY ILL POLE) (30 IN) | 80 LF | $660.00 | $270.84 | 2.44x | $31,133 |
| 110-7001 EXCAV (ROADWAY) | 250 CY | $92.98 | $11.68 | 7.96x | $20,324 |
| 134-7002 BACKFILL (TY B) | 18 STA | $1,017.33 | $206.94 | 4.92x | $14,587 |
| 467-7323 SET (TY II) (24 IN) (CMP) (6: 1) (C) | 1 EA | $18,000.00 | $3,471.43 | 5.19x | $14,529 |
| 500-7001 MOBILIZATION | 1 LS | $208,557.52 | $523,850.32 | 0.40x | -$315,293 |