Bid Tab X-ray: 0916-00-263

Jun 2, 2026 · Nueces Sign up free
Set your company to personalize scores

Scour bridges FY 26 Karnes

0916-00-263 · let Jun 2, 2026 · Nueces, Corpus Christi · Bridge Maintenance

$177,547Low bid: TAYLOR BRIDGE LLC-19.7% vs estimate $221,134
$10,203Left on the table5.7% gap to the second bid
14BiddersSpread 118% low to high
14Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1TAYLOR BRIDGE LLC $177,547-19.7% $10,203 5+$67,985 5-$657,973
2PREMIER CONTRACTORS LLC $187,750+5.7%-15.1% $9,480 3+$40,779 6-$644,196
3GARRET SHIELDS INFRASTRUCTURE $197,230+11.1%-10.8% $16,678 3+$27,817 3-$613,757
4MPB, INC. $213,908+20.5%-3.3% $11,412 4+$51,087 3-$621,457
5JACKSON EXCAVATION, LLC $225,320+26.9%1.9% $2,088 2+$34,740 5-$569,254
6MACIAS SPECIALTY CONTRACTING LLC $227,408+28.1%2.8% $7,743
7BLACKSMITH VENTURES LLC $235,151+32.4%6.3% $23,309
8RELMCO, INC. $258,460+45.6%16.9% $5,070
9AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC $263,530+48.4%19.2% $5,825
10ROY JORGENSEN ASSOCIATES, INC. $269,355+51.7%21.8% $4,713
11GV LANDSCAPE AND CONSTRUCTION LLC $274,068+54.4%23.9% $2,156
12SCR CIVIL CONSTRUCTION, LLC $276,224+55.6%24.9% $9,891
13LUCANIA CONTRACTORS LLC $286,115+61.1%29.4% $100,085
1412TWELVE ROAD AND BRIDGE LLC $386,200+117.5%74.6%

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.

Where the job was won

TAYLOR BRIDGE LLC vs PREMIER CONTRACTORS LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
500-7001 MOBILIZATION1 LS $3,500.00$15,000.00$523,850.32 $11,500
429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)45 SF $275.00$500.00$150.68 $10,125
446-7019 SPOT CLEAN & PNT EXT STR(SPL PROT SYS)1 LS $30,000.00$40,000.00$117,652.00 $10,000
432-7043 RIPRAP (STONE PROTECTION)(18 IN)200 CY $350.00$300.00$184.74 -$10,000
735-7061 DRIFTWOOD REMOVAL3 LS $4,000.00$1,000.00$3,574.63 -$9,000
438-7001 CLEANING AND SEALING EXISTING JOINTS735 LF $30.00$40.00$15.92 $7,350
752-7005 TREE REMOVAL (4" - 12" DIA)4 EA $2,000.00$500.00$60.77 -$6,000
752-7002 SPOT TREE TRIMMING / BRUSH REMOVAL1,936 LF $7.00$5.00$1.20 -$3,872
780-7003 CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)10 LF $200.00$250.00$46.07 $500
401-7001 FLOWABLE BACKFILL2 CY $1,200.00$1,000.00$298.77 -$400
503-7001 PORTABLE CHANGEABLE MESSAGE SIGN78 DAY $1.00$1.00$87.82 $0
505-7001 TMA (STATIONARY)39 DAY $1.00$1.00$217.57 $0
735-7072 DEBRIS REMOVAL (SPOT DEBRIS)0.31 MI $5,000.00$5,000.00$171.68 $0
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $1.00$1.00$11,585.04 $0

Positive: the low bidder was cheaper on that item. These 14 items account for $10,203 of the $10,203 gap.

TAYLOR BRIDGE LLC: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
432-7043 RIPRAP (STONE PROTECTION)(18 IN)200 CY $350.00$184.741.89x$33,052
752-7002 SPOT TREE TRIMMING / BRUSH REMOVAL1,936 LF $7.00$1.205.84x$11,231
438-7001 CLEANING AND SEALING EXISTING JOINTS735 LF $30.00$15.921.88x$10,351
752-7005 TREE REMOVAL (4" - 12" DIA)4 EA $2,000.00$60.7732.91x$7,757
429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)45 SF $275.00$150.681.83x$5,594
500-7001 MOBILIZATION1 LS $3,500.00$523,850.320.01x-$520,350
446-7019 SPOT CLEAN & PNT EXT STR(SPL PROT SYS)1 LS $30,000.00$117,652.000.25x-$87,652
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $1.00$11,585.040.00x-$34,752
505-7001 TMA (STATIONARY)39 DAY $1.00$217.570.00x-$8,446
503-7001 PORTABLE CHANGEABLE MESSAGE SIGN78 DAY $1.00$87.820.01x-$6,772

PREMIER CONTRACTORS LLC: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
438-7001 CLEANING AND SEALING EXISTING JOINTS735 LF $40.00$15.922.51x$17,701
429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)45 SF $500.00$150.683.32x$15,719
752-7002 SPOT TREE TRIMMING / BRUSH REMOVAL1,936 LF $5.00$1.204.17x$7,359
500-7001 MOBILIZATION1 LS $15,000.00$523,850.320.03x-$508,850
446-7019 SPOT CLEAN & PNT EXT STR(SPL PROT SYS)1 LS $40,000.00$117,652.000.34x-$77,652
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $1.00$11,585.040.00x-$34,752
505-7001 TMA (STATIONARY)39 DAY $1.00$217.570.00x-$8,446
735-7061 DRIFTWOOD REMOVAL3 LS $1,000.00$3,574.630.28x-$7,724
503-7001 PORTABLE CHANGEABLE MESSAGE SIGN78 DAY $1.00$87.820.01x-$6,772

GARRET SHIELDS INFRASTRUCTURE: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
438-7001 CLEANING AND SEALING EXISTING JOINTS735 LF $40.00$15.922.51x$17,701
752-7002 SPOT TREE TRIMMING / BRUSH REMOVAL1,936 LF $5.00$1.204.17x$7,359
752-7005 TREE REMOVAL (4" - 12" DIA)4 EA $750.00$60.7712.34x$2,757
500-7001 MOBILIZATION1 LS $20,000.00$523,850.320.04x-$503,850
446-7019 SPOT CLEAN & PNT EXT STR(SPL PROT SYS)1 LS $35,000.00$117,652.000.30x-$82,652
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $2,500.00$11,585.040.22x-$27,255

MPB, INC.: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
438-7001 CLEANING AND SEALING EXISTING JOINTS735 LF $50.00$15.923.14x$25,051
752-7002 SPOT TREE TRIMMING / BRUSH REMOVAL1,936 LF $7.80$1.206.51x$12,780
752-7005 TREE REMOVAL (4" - 12" DIA)4 EA $2,400.00$60.7739.49x$9,357
735-7072 DEBRIS REMOVAL (SPOT DEBRIS)0.31 MI $12,750.00$171.6874.27x$3,899
500-7001 MOBILIZATION1 LS $15,000.00$523,850.320.03x-$508,850
446-7019 SPOT CLEAN & PNT EXT STR(SPL PROT SYS)1 LS $35,000.00$117,652.000.30x-$82,652
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $1,600.00$11,585.040.14x-$29,955

JACKSON EXCAVATION, LLC: unbalanced items

Placed 5
ItemQtyTheir priceMarketx market$ vs market
438-7001 CLEANING AND SEALING EXISTING JOINTS735 LF $40.00$15.922.51x$17,701
752-7002 SPOT TREE TRIMMING / BRUSH REMOVAL1,936 LF $10.00$1.208.34x$17,039
500-7001 MOBILIZATION1 LS $5,000.00$523,850.320.01x-$518,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $3,000.00$11,585.040.26x-$25,755
735-7061 DRIFTWOOD REMOVAL3 LS $80.00$3,574.630.02x-$10,484
505-7001 TMA (STATIONARY)39 DAY $10.00$217.570.05x-$8,095
503-7001 PORTABLE CHANGEABLE MESSAGE SIGN78 DAY $10.00$87.820.11x-$6,070