6501-38-001 LRA
6501-38-001 · let Jun 9, 2026 · Ector, Odessa · Material Maintenance Project
$254,624Low bid: MARTIN MARIETTA MATERIALS, INC.-1.1% vs estimate $257,500
$5,318Left on the table2.1% gap to the second bid
2BiddersSpread 2% low to high
10Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | MARTIN MARIETTA MATERIALS, INC. | $254,624 | -1.1% | $5,318 | 0 | 0 | |
| 2 | VULCAN CONSTRUCTION MATERIALS, LLC | $259,942 | +2.1% | 0.9% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
MARTIN MARIETTA MATERIALS, INC. vs VULCAN CONSTRUCTION MATERIALS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8001-7038 LRA (TY I GR B) (DEL) (ST2) | 400 TON | $142.84 | $146.41 | $153.94 | $1,428 |
| 8001-7011 LRA (TY I GR AA) (DEL) (ST3) | 200 TON | $136.05 | $141.16 | $127.41 | $1,022 |
| 8001-7082 LRA (TY I GR D) (DEL) (ST4) | 400 TON | $143.95 | $145.73 | $137.41 | $712 |
| 8001-7081 LRA (TY I GR D) (DEL) (ST3) | 350 TON | $140.55 | $142.16 | $138.98 | $563 |
| 8001-7110 LRA (TY II GR DS) (DEL) (ST4) | 200 TON | $143.95 | $146.73 | $127.32 | $556 |
| 8001-7026 LRA (TY I GR A) (DEL) (ST4) | 50 TON | $139.12 | $144.73 | $114.29 | $280 |
| 8001-7010 LRA (TY I GR AA) (DEL) (ST2) | 50 TON | $140.84 | $146.41 | $124.75 | $279 |
| 8001-7040 LRA (TY I GR B) (DEL) (ST4) | 50 TON | $141.12 | $144.73 | $133.33 | $180 |
| 8001-7039 LRA (TY I GR B) (DEL) (ST3) | 50 TON | $138.05 | $141.16 | $134.52 | $155 |
| 8001-7037 LRA (TY I GR B) (DEL) (ST1) | 50 TON | $135.18 | $138.01 | $152.70 | $141 |
Positive: the low bidder was cheaper on that item. These 10 items account for $5,318 of the $5,318 gap.