SL12 SS 408 to West Fork Trinity River
0581-02-162 · let Jun 2, 2026 · Dallas, Dallas · Rehabilitation of Existing Road
$19,588,668Low bid: AUSTIN BRIDGE & ROAD SERVICES, LP+9.0% vs estimate $17,965,405
$687,379Left on the table3.5% gap to the second bid
4BiddersSpread 6% low to high
94Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | AUSTIN BRIDGE & ROAD SERVICES, LP | $19,588,668 | 9.0% | $687,379 | 4+$2,199,611 | 3-$469,457 | |
| 2 | GIBSON & ASSOCIATES, INC. | $20,276,047 | +3.5% | 12.9% | $314,139 | 3+$1,261,935 | 2-$492,950 |
| 3 | TEXAS MATERIALS GROUP, INC. | $20,590,186 | +5.1% | 14.6% | $141,514 | 3+$1,610,124 | 2-$436,834 |
| 4 | RAGLE CONSTRUCTION, INC. | $20,731,701 | +5.8% | 15.4% | 2+$2,352,374 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
AUSTIN BRIDGE & ROAD SERVICES, LP vs GIBSON & ASSOCIATES, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $2,154,753.50 | $1,000,000.00 | $523,850.32 | -$1,154,754 |
| 346-7001 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 | 40,297 TON | $165.66 | $181.98 | $156.93 | $657,647 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 MO | $32,997.07 | $56,000.00 | $11,585.04 | $345,044 |
| 3000-7001 CAM PG76-22 SAC-B | 17,041 TON | $188.08 | $202.88 | $190.22 | $252,207 |
| 505-7001 TMA (STATIONARY) | 484 DAY | $1.00 | $350.00 | $217.57 | $168,916 |
| 451-7024 RETROFIT RAIL (TY SSTR) | 12,428 LF | $118.00 | $129.80 | $175.01 | $146,650 |
| 361-7049 FULL - DEPTH REPAIR CRCP (8") | 5,500 SY | $198.00 | $217.80 | $189.93 | $108,900 |
| 512-7074 PTB (MOVE)(STEEL) | 11,460 LF | $14.14 | $6.50 | $31.04 | -$87,554 |
| 361-7047 FULL-DEPTH REP(BR APPR SLAB)(9"-13") | 45.5 CY | $3,900.00 | $2,000.00 | $1,087.55 | -$86,450 |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 11,215 SY | $76.00 | $82.08 | $60.19 | $68,187 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $9,652.56 | $25,000.00 | $9,253.78 | $61,390 |
| 752-7001 TREE TRIMMING / BRUSH REMOVAL | 0.8 MI | $64,000.00 | $11,500.00 | $1,716.86 | -$42,000 |
| 512-7072 PTB (FUR & INST)(STEEL) | 3,820 LF | $39.17 | $28.50 | $83.93 | -$40,759 |
| 505-7003 TMA (MOBILE OPERATION) | 100 DAY | $1.00 | $350.00 | $229.60 | $34,900 |
| 512-7076 PTB (REMOVE)(STEEL) | 3,820 LF | $1.17 | $10.00 | $18.36 | $33,731 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 1,749 SF | $160.00 | $176.00 | $150.68 | $27,984 |
| 346-7028 TACK COAT | 68,229 GAL | $4.60 | $4.97 | $5.05 | $25,245 |
| 778-7001 CONCRETE RAIL REPAIR (IN-KIND) | 40 LF | $820.00 | $250.00 | $380.94 | -$22,800 |
| 662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W | 4,437 EA | $0.5000 | $5.00 | $1.03 | $19,967 |
| 354-7033 PLANE ASPH CONC PAV(0" TO 3") | 127,786 SY | $2.90 | $2.75 | $3.11 | -$19,168 |
Positive: the low bidder was cheaper on that item. These 20 items account for $497,282 of the $687,379 gap.
AUSTIN BRIDGE & ROAD SERVICES, LP: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $2,154,753.50 | $523,850.32 | 4.11x | $1,630,903 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 MO | $32,997.07 | $11,585.04 | 2.85x | $321,180 |
| 361-7047 FULL-DEPTH REP(BR APPR SLAB)(9"-13") | 45.5 CY | $3,900.00 | $1,087.55 | 3.59x | $127,966 |
| 787-7001 REPLACING ELASTOMERIC BEARING PADS | 34 EA | $6,300.00 | $2,783.49 | 2.26x | $119,561 |
| 512-7074 PTB (MOVE)(STEEL) | 11,460 LF | $14.14 | $31.04 | 0.46x | -$193,659 |
| 512-7072 PTB (FUR & INST)(STEEL) | 3,820 LF | $39.17 | $83.93 | 0.47x | -$170,977 |
| 505-7001 TMA (STATIONARY) | 484 DAY | $1.00 | $217.57 | 0.00x | -$104,821 |
GIBSON & ASSOCIATES, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 MO | $56,000.00 | $11,585.04 | 4.83x | $666,224 |
| 500-7001 MOBILIZATION | 1 LS | $1,000,000.00 | $523,850.32 | 1.91x | $476,150 |
| 787-7001 REPLACING ELASTOMERIC BEARING PADS | 34 EA | $6,300.00 | $2,783.49 | 2.26x | $119,561 |
| 512-7074 PTB (MOVE)(STEEL) | 11,460 LF | $6.50 | $31.04 | 0.21x | -$281,214 |
| 512-7072 PTB (FUR & INST)(STEEL) | 3,820 LF | $28.50 | $83.93 | 0.34x | -$211,736 |
TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 MO | $68,014.01 | $11,585.04 | 5.87x | $846,435 |
| 500-7001 MOBILIZATION | 1 LS | $1,158,390.00 | $523,850.32 | 2.21x | $634,540 |
| 787-7001 REPLACING ELASTOMERIC BEARING PADS | 34 EA | $6,582.00 | $2,783.49 | 2.36x | $129,149 |
| 512-7074 PTB (MOVE)(STEEL) | 11,460 LF | $10.45 | $31.04 | 0.34x | -$235,947 |
| 512-7072 PTB (FUR & INST)(STEEL) | 3,820 LF | $31.34 | $83.93 | 0.37x | -$200,888 |