FPSR 07 08.26
6498-28-001 · let Jul 8, 2026 · Collin, Dallas · Routine Maintenance Project - Sealed
$710,406Low bid: JAGOE-PUBLIC COMPANY-3.8% vs estimate $738,371
$70,564Left on the table9.9% gap to the second bid
4BiddersSpread 23% low to high
9Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | JAGOE-PUBLIC COMPANY | $710,406 | -3.8% | $70,564 | 2+$15,289 | 2-$451,448 | |
| 2 | TEXAS MATERIALS GROUP, INC. | $780,970 | +9.9% | 5.8% | $28,599 | 1+$4,919 | 2-$498,247 |
| 3 | PEACHTREE CONSTRUCTION, LTD. | $809,568 | +14.0% | 9.6% | $64,329 | 1+$10,065 | 2-$499,020 |
| 4 | ICOS MANAGEMENT, LLC | $873,898 | +23.0% | 18.4% | 2+$36,396 | 1-$493,061 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
JAGOE-PUBLIC COMPANY vs TEXAS MATERIALS GROUP, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 351-7025 FLEXIBLE PAV STR REPAIR 12" -TYPICAL A | 5,522 SY | $104.50 | $130.00 | $116.93 | $140,811 |
| 500-7001 MOBILIZATION | 1 LS | $78,100.00 | $33,000.00 | $523,850.32 | -$45,100 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 MO | $15,750.00 | $8,000.00 | $11,585.04 | -$15,500 |
| 354-7051 PLANE ASPH CONC PAV(2") | 924 SY | $14.00 | $5.00 | $1.86 | -$8,316 |
| 505-7001 TMA (STATIONARY) | 34 DAY | $50.00 | $0.0100 | $217.57 | -$1,700 |
| 344-7011 SP MIXES SP-C SAC-B PG64-22 | 34 TON | $250.00 | $275.00 | $130.31 | $850 |
| 505-7003 TMA (MOBILE OPERATION) | 10 DAY | $50.00 | $0.0100 | $229.60 | -$500 |
| 344-7077 TACK COAT | 6.16 GAL | $5.00 | $8.00 | $3.25 | $18 |
| 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 18 EA | $5.00 | $5.00 | $0.5715 | $0 |
Positive: the low bidder was cheaper on that item. These 9 items account for $70,564 of the $70,564 gap.