SS136 Rehabilitation
6500-17-001 · let Jul 2, 2026 · Jefferson, Beaumont · Routine Maintenance Project - Sealed
$3,199,771Low bid: TEXAS MATERIALS GROUP, INC.+19.9% vs estimate $2,668,475
$723,353Left on the table22.6% gap to the second bid
2BiddersSpread 23% low to high
44Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TEXAS MATERIALS GROUP, INC. | $3,199,771 | 19.9% | $723,353 | 3+$927,044 | 2-$632,234 | |
| 2 | SELECT MAINTENANCE, L.L.C. | $3,923,124 | +22.6% | 47.0% | 6+$1,583,704 | 1-$505,931 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
TEXAS MATERIALS GROUP, INC. vs SELECT MAINTENANCE, L.L.C., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 347-7001 TOM-C PG76-22 SAC-A | 3,332 TON | $403.00 | $499.00 | $169.86 | $319,872 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $931.50 | $33,500.00 | $11,585.04 | $195,411 |
| 316-7007 ASPH (AC-20-5TR) | 16,986 GAL | $7.00 | $12.00 | $3.27 | $84,930 |
| 3012-7001 DOWEL BAR RETROFIT | 5,508 EA | $138.00 | $125.00 | $137.94 | -$71,604 |
| 438-7004 CLEANING AND SEALING EXIST JOINTS (CL3) | 35,647 LF | $3.25 | $5.00 | $19.19 | $62,382 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $9,473.00 | $35,000.00 | $9,253.78 | $51,054 |
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 5 EA | $626.50 | $10,405.66 | $696.14 | $48,896 |
| 500-7001 MOBILIZATION | 1 LS | $308,750.00 | $350,000.00 | $523,850.32 | $41,250 |
| 134-7001 BACKFILL (TY A) | 120.86 STA | $333.25 | $150.00 | $224.26 | -$22,148 |
| 316-7241 AGGR (TY-PB OR PL, GR-4)(SAC-A) | 363 CY | $420.00 | $476.00 | $180.75 | $20,328 |
| 505-7001 TMA (STATIONARY) | 125 DAY | $316.00 | $200.00 | $217.57 | -$14,500 |
| 530-7022 INTRSCT, DRVWAYS, & TURNOUT (ACP) | 313 SY | $69.50 | $98.00 | $42.62 | $8,921 |
| 720-7001 SPALLING REPAIR (HYDRAULIC CEMENT) | 100 CF | $289.50 | $225.00 | $206.00 | -$6,450 |
| 666-7265 RE PROFILE PM TY I(W)6"(SLD)(090MIL) | 23,973 LF | $1.00 | $0.7500 | $0.5887 | -$5,993 |
| 164-7020 HYDRO MULCH SEED (PERM_URBAN_CLAY) | 8,057 SY | $0.5000 | $1.00 | $0.5682 | $4,029 |
| 666-7269 RE PROFILE PM TY I(Y)6"(SLD)(090MIL) | 15,704 LF | $1.00 | $0.7500 | $0.6020 | -$3,926 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 7 CY | $842.25 | $1,325.00 | $616.83 | $3,379 |
| 164-7005 BROADCAST SEED (TEMP_WARM) | 4,029 SY | $0.2000 | $1.00 | $0.1968 | $3,223 |
| 164-7006 BROADCAST SEED (TEMP_COOL) | 4,029 SY | $0.2000 | $1.00 | $0.2087 | $3,223 |
| 168-7001 VEGETATIVE WATERING | 67.7 TGL | $18.50 | $50.00 | $8.43 | $2,133 |
Positive: the low bidder was cheaper on that item. These 20 items account for $724,409 of the $723,353 gap.
TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 347-7001 TOM-C PG76-22 SAC-A | 3,332 TON | $403.00 | $169.86 | 2.37x | $776,815 |
| 316-7241 AGGR (TY-PB OR PL, GR-4)(SAC-A) | 363 CY | $420.00 | $180.75 | 2.32x | $86,850 |
| 316-7007 ASPH (AC-20-5TR) | 16,986 GAL | $7.00 | $3.27 | 2.14x | $63,380 |
| 438-7004 CLEANING AND SEALING EXIST JOINTS (CL3) | 35,647 LF | $3.25 | $19.19 | 0.17x | -$568,313 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $931.50 | $11,585.04 | 0.08x | -$63,921 |
SELECT MAINTENANCE, L.L.C.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 347-7001 TOM-C PG76-22 SAC-A | 3,332 TON | $499.00 | $169.86 | 2.94x | $1,096,687 |
| 316-7007 ASPH (AC-20-5TR) | 16,986 GAL | $12.00 | $3.27 | 3.67x | $148,310 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $33,500.00 | $11,585.04 | 2.89x | $131,490 |
| 316-7241 AGGR (TY-PB OR PL, GR-4)(SAC-A) | 363 CY | $476.00 | $180.75 | 2.63x | $107,178 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $35,000.00 | $9,253.78 | 3.78x | $51,492 |
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 5 EA | $10,405.66 | $696.14 | 14.95x | $48,548 |
| 438-7004 CLEANING AND SEALING EXIST JOINTS (CL3) | 35,647 LF | $5.00 | $19.19 | 0.26x | -$505,931 |