Bid Tab X-ray: 6498-29-001

Jul 8, 2026 · Collin Sign up free
Set your company to personalize scores

Tree Trimming and Brush Removal 07 0826

6498-29-001 · let Jul 8, 2026 · Collin, Dallas · Routine Maintenance Project - Sealed

$63,884Low bid: TEXWAY WASTEWATER SERVICES, LLC-17.9% vs estimate $77,791
$12,716Left on the table19.9% gap to the second bid
10BiddersSpread 144% low to high
12Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1TEXWAY WASTEWATER SERVICES, LLC $63,884-17.9% $12,716 0 2-$558,601
2WESTERN CERTIFIED ARBORISTS $76,600+19.9%-1.5% $10,655 0 2-$556,005
3RHINO EQUITY, LLC $87,255+36.6%12.2% $13,495 0 2-$549,105
4GV LANDSCAPE AND CONSTRUCTION LLC $100,750+57.7%29.5% $214 1+$2,769 2-$549,105
5BOEN LANDSCAPING & IRRIGATION, LLC $100,964+58.0%29.8% $1,987 3+$40,385 3-$555,652
6AUSTIN BARRICADE COMPANY, L.L.C. $102,951+61.2%32.3% $11,706
7GOOD NEWS RANCH AND FARM LLC $114,657+79.5%47.4% $4,356
8MARLANE CONSTRUCTION, LLC $119,013+86.3%53.0% $20,867
9JACKSON EXCAVATION, LLC $139,880+119.0%79.8% $15,733
10ANTHONY SERVICES $155,613+143.6%100.0%

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.

Where the job was won

TEXWAY WASTEWATER SERVICES, LLC vs WESTERN CERTIFIED ARBORISTS, biggest item swings
ItemQtyLow2ndMarket2nd minus low
505-7001 TMA (STATIONARY)10 DAY $1.00$300.00$217.57 $2,990
752-7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS)12.6 AC $1,700.00$1,500.00$1,602.83 -$2,520
752-7006 TREE REMOVAL (12" - 18" DIA)20 EA $100.00$225.00$100.44 $2,500
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $1.00$700.00$11,585.04 $2,097
752-7008 TREE REMOVAL (24" - 30" DIA)3 EA $100.00$750.00$208.61 $1,950
752-7005 TREE REMOVAL (4" - 12" DIA)40 EA $50.00$90.00$60.77 $1,600
752-7009 TREE REMOVAL (30" - 36" DIA)2 EA $100.00$750.00$293.05 $1,300
752-7007 TREE REMOVAL (18" - 24" DIA)4 EA $100.00$350.00$141.37 $1,000
752-7010 TREE REMOVAL (36" - 42" DIA)1 EA $100.00$750.00$334.81 $650
752-7011 TREE REMOVAL (42" - 48" DIA)1 EA $100.00$750.00$436.67 $650
500-7001 MOBILIZATION1 LS $1.00$500.00$523,850.32 $499
752-7001 TREE TRIMMING / BRUSH REMOVAL24.9 MI $1,500.00$1,500.00$1,716.86 $0

Positive: the low bidder was cheaper on that item. These 12 items account for $12,716 of the $12,716 gap.

TEXWAY WASTEWATER SERVICES, LLC: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $1.00$523,850.320.00x-$523,849
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $1.00$11,585.040.00x-$34,752

WESTERN CERTIFIED ARBORISTS: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $500.00$523,850.320.00x-$523,350
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $700.00$11,585.040.06x-$32,655

RHINO EQUITY, LLC: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $5,000.00$523,850.320.01x-$518,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $1,500.00$11,585.040.13x-$30,255

GV LANDSCAPE AND CONSTRUCTION LLC: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
752-7005 TREE REMOVAL (4" - 12" DIA)40 EA $130.00$60.772.14x$2,769
500-7001 MOBILIZATION1 LS $5,000.00$523,850.320.01x-$518,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $1,500.00$11,585.040.13x-$30,255

BOEN LANDSCAPING & IRRIGATION, LLC: unbalanced items

Placed 5
ItemQtyTheir priceMarketx market$ vs market
752-7005 TREE REMOVAL (4" - 12" DIA)40 EA $575.00$60.779.46x$20,569
505-7001 TMA (STATIONARY)10 DAY $1,250.00$217.575.75x$10,324
752-7006 TREE REMOVAL (12" - 18" DIA)20 EA $575.00$100.445.72x$9,491
500-7001 MOBILIZATION1 LS $10,000.00$523,850.320.02x-$513,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $3,333.00$11,585.040.29x-$24,756
752-7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS)12.6 AC $250.00$1,602.830.16x-$17,046