IH20_RampReversal_SH137_BI20-F EAST
0005-04-084 · let Jul 2, 2026 · Martin, Odessa · Freeway Operational Improvements
$8,792,883Low bid: GILVIN-TERRILL, LTD.+48.7% vs estimate $5,911,334
$176,946Left on the table2.0% gap to the second bid
4BiddersSpread 27% low to high
126Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | GILVIN-TERRILL, LTD. | $8,792,883 | 48.7% | $176,946 | 11+$1,440,866 | 0 | |
| 2 | RAGLE CONSTRUCTION, INC. | $8,969,829 | +2.0% | 51.7% | $1,430,121 | 7+$1,957,484 | 1-$45,881 |
| 3 | RK HALL, LLC | $10,399,950 | +18.3% | 75.9% | $727,909 | 11+$3,083,284 | 1-$62,855 |
| 4 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | $11,127,859 | +26.6% | 88.2% | 13+$4,564,004 | 1-$95,393 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
GILVIN-TERRILL, LTD. vs RAGLE CONSTRUCTION, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 19 MO | $21,000.00 | $78,525.00 | $11,585.04 | $1,092,975 |
| 6032-7001 AUTO PORT SMART TRAFFIC MONITORING SYS | 123 DAY | $2,500.00 | $300.00 | $673.02 | -$270,600 |
| 247-7345 FL BS (CMP IN PLC)(TY A GR 4)(5") | 24,552 SY | $20.00 | $10.00 | $8.56 | -$245,520 |
| 432-7003 RIPRAP (CONC)(6 IN) | 544 CY | $1,000.00 | $600.00 | $580.25 | -$217,600 |
| 110-7001 EXCAV (ROADWAY) | 5,770 CY | $20.00 | $45.00 | $11.68 | $144,250 |
| 344-7005 SP MIXES SP-B SAC-B PG70-22 | 8,596 TON | $150.00 | $165.00 | $94.47 | $128,940 |
| 420-7052 CL C CONC (RAIL FOUNDATION) | 381 CY | $1,000.00 | $670.00 | $552.17 | -$125,730 |
| 512-7085 PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL) | 2,280 LF | $50.00 | $100.00 | $38.28 | $114,000 |
| 132-7001 EMBANK (FNL)(OC)(TY A) | 9,696 CY | $20.00 | $30.00 | $22.62 | $96,960 |
| 450-7024 RAIL (TY SSTR) | 3,376 LF | $100.00 | $72.00 | $69.92 | -$94,528 |
| 512-7088 PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL) | 2,280 LF | $50.00 | $10.00 | $17.41 | -$91,200 |
| 403-7001 TEMPORARY SPL SHORING | 1,712 SF | $75.00 | $23.50 | $25.56 | -$88,168 |
| 400-7010 CEM STABIL BKFL | 210 CY | $500.00 | $130.00 | $138.14 | -$77,700 |
| 467-7095 SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1)(C) | 6 EA | $3,665.00 | $16,000.00 | $5,663.17 | $74,010 |
| 354-7018 PLANE & TEXT ASPH CONC PAV(1.5") | 4,037 SY | $15.00 | $3.00 | $1.85 | -$48,444 |
| 105-7003 RMV (3"-7") TRT/UNTRT BASE & ASPH PAV | 7,566 SY | $10.00 | $4.50 | $5.83 | -$41,613 |
| 105-7027 RMV (7") TRT/UNTRT BASE & ASPH PAV | 8,250 SY | $10.00 | $5.00 | $6.13 | -$41,250 |
| 500-7001 MOBILIZATION | 1 LS | $850,000.00 | $890,000.00 | $523,850.32 | $40,000 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $18,500.00 | $9,000.00 | $9,253.78 | -$38,000 |
| 512-7033 PORT CTB (MOVE)(LOW PROF)(TY 1) | 13,760 LF | $5.00 | $7.75 | $8.08 | $37,840 |
Positive: the low bidder was cheaper on that item. These 20 items account for $348,622 of the $176,946 gap.
GILVIN-TERRILL, LTD.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 247-7345 FL BS (CMP IN PLC)(TY A GR 4)(5") | 24,552 SY | $20.00 | $8.56 | 2.34x | $280,980 |
| 6032-7001 AUTO PORT SMART TRAFFIC MONITORING SYS | 123 DAY | $2,500.00 | $673.02 | 3.71x | $224,719 |
| 512-7009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 3,340 LF | $100.00 | $43.56 | 2.30x | $188,507 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 19 MO | $21,000.00 | $11,585.04 | 1.81x | $178,884 |
| 420-7052 CL C CONC (RAIL FOUNDATION) | 381 CY | $1,000.00 | $552.17 | 1.81x | $170,624 |
| 403-7001 TEMPORARY SPL SHORING | 1,712 SF | $75.00 | $25.56 | 2.93x | $84,640 |
| 400-7010 CEM STABIL BKFL | 210 CY | $500.00 | $138.14 | 3.62x | $75,990 |
| 512-7088 PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL) | 2,280 LF | $50.00 | $17.41 | 2.87x | $74,310 |
| 316-7007 ASPH (AC-20-5TR) | 11,873 GAL | $8.00 | $3.27 | 2.45x | $56,175 |
| 354-7018 PLANE & TEXT ASPH CONC PAV(1.5") | 4,037 SY | $15.00 | $1.85 | 8.10x | $53,076 |
RAGLE CONSTRUCTION, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 19 MO | $78,525.00 | $11,585.04 | 6.78x | $1,271,859 |
| 110-7001 EXCAV (ROADWAY) | 5,770 CY | $45.00 | $11.68 | 3.85x | $192,244 |
| 512-7009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 3,340 LF | $100.00 | $43.56 | 2.30x | $188,507 |
| 512-7085 PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL) | 2,280 LF | $100.00 | $38.28 | 2.61x | $140,719 |
| 467-7095 SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1)(C) | 6 EA | $16,000.00 | $5,663.17 | 2.83x | $62,021 |
| 316-7007 ASPH (AC-20-5TR) | 11,873 GAL | $8.00 | $3.27 | 2.45x | $56,175 |
| 545-7016 CRASH CUSH ATTEN (INSTL)(S)(W)(TL3) | 1 EA | $56,000.00 | $10,040.20 | 5.58x | $45,960 |
| 6032-7001 AUTO PORT SMART TRAFFIC MONITORING SYS | 123 DAY | $300.00 | $673.02 | 0.45x | -$45,881 |
RK HALL, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 420-7052 CL C CONC (RAIL FOUNDATION) | 381 CY | $2,700.00 | $552.17 | 4.89x | $818,324 |
| 450-7024 RAIL (TY SSTR) | 3,376 LF | $270.00 | $69.92 | 3.86x | $675,462 |
| 512-7009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 3,340 LF | $200.00 | $43.56 | 4.59x | $522,507 |
| 512-7085 PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL) | 2,280 LF | $200.00 | $38.28 | 5.22x | $368,719 |
| 247-7345 FL BS (CMP IN PLC)(TY A GR 4)(5") | 24,552 SY | $16.03 | $8.56 | 1.87x | $183,509 |
| 530-7006 DRIVEWAYS (CONC) | 1,044 SY | $246.90 | $109.20 | 2.26x | $143,761 |
| 316-7136 AGGR (TY-PB, GR-4)(SAC-A) | 260 CY | $533.03 | $137.54 | 3.88x | $102,829 |
| 354-7018 PLANE & TEXT ASPH CONC PAV(1.5") | 4,037 SY | $21.89 | $1.85 | 11.82x | $80,891 |
| 403-7001 TEMPORARY SPL SHORING | 1,712 SF | $64.83 | $25.56 | 2.54x | $67,229 |
| 512-7086 PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL) | 6,530 LF | $18.72 | $9.41 | 1.99x | $60,787 |
| 6032-7001 AUTO PORT SMART TRAFFIC MONITORING SYS | 123 DAY | $162.00 | $673.02 | 0.24x | -$62,855 |
JONES BROS. DIRT & PAVING CONTRACTORS, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 420-7052 CL C CONC (RAIL FOUNDATION) | 381 CY | $3,125.00 | $552.17 | 5.66x | $980,249 |
| 450-7024 RAIL (TY SSTR) | 3,376 LF | $312.50 | $69.92 | 4.47x | $818,942 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 19 MO | $50,000.00 | $11,585.04 | 4.32x | $729,884 |
| 500-7001 MOBILIZATION | 1 LS | $971,866.26 | $523,850.32 | 1.86x | $448,016 |
| 247-7345 FL BS (CMP IN PLC)(TY A GR 4)(5") | 24,552 SY | $21.61 | $8.56 | 2.53x | $320,509 |
| 432-7003 RIPRAP (CONC)(6 IN) | 544 CY | $1,093.75 | $580.25 | 1.88x | $279,343 |
| 462-7061 CONC BOX CULV (5 FT X 2 FT)(EXTEND) | 450 LF | $1,237.50 | $695.65 | 1.78x | $243,831 |
| 530-7006 DRIVEWAYS (CONC) | 1,044 SY | $274.38 | $109.20 | 2.51x | $172,450 |
| 132-7001 EMBANK (FNL)(OC)(TY A) | 9,696 CY | $40.20 | $22.62 | 1.78x | $170,483 |
| 403-7001 TEMPORARY SPL SHORING | 1,712 SF | $106.25 | $25.56 | 4.16x | $138,140 |
| 512-7009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 3,340 LF | $15.00 | $43.56 | 0.34x | -$95,393 |