FM 1461 from CR 123 to Franklin Branch
1392-03-017 · let Jul 1, 2026 · Collin, Dallas · Rehabilitation of Existing Road
$4,381,938Low bid: JAGOE-PUBLIC COMPANY-1.7% vs estimate $4,456,443
$202,967Left on the table4.6% gap to the second bid
9BiddersSpread 30% low to high
163Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | JAGOE-PUBLIC COMPANY | $4,381,938 | -1.7% | $202,967 | 4+$364,204 | 3-$845,811 | |
| 2 | QUALITY EXCAVATION, LLC | $4,584,905 | +4.6% | 2.9% | $179,184 | 3+$135,066 | 1-$524,741 |
| 3 | STX CIVIL | $4,764,089 | +8.7% | 6.9% | $72,023 | 5+$367,166 | 2-$694,775 |
| 4 | FOUTSCO PAVING COMPANY, LLC | $4,836,112 | +10.4% | 8.5% | $199,221 | 4+$645,341 | 5-$915,702 |
| 5 | OVERLAND CORPORATION | $5,035,333 | +14.9% | 13.0% | $37,491 | 6+$420,710 | 3-$629,417 |
| 6 | AUSTIN BRIDGE & ROAD SERVICES, LP | $5,072,824 | +15.8% | 13.8% | $500,204 | ||
| 7 | ALTUS CONSTRUCTION LLC | $5,573,028 | +27.2% | 25.1% | $83,545 | ||
| 8 | TEXAS MATERIALS GROUP, INC. | $5,656,574 | +29.1% | 26.9% | $32,036 | ||
| 9 | ED BELL CONSTRUCTION COMPANY | $5,688,610 | +29.8% | 27.6% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
JAGOE-PUBLIC COMPANY vs QUALITY EXCAVATION, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $35,000.00 | $8,565.00 | $11,585.04 | -$264,350 |
| 344-7001 SP MIXES SP-B PG64-22 | 7,250 TON | $100.00 | $127.27 | $124.45 | $197,708 |
| 168-7001 VEGETATIVE WATERING | 21,250 TGL | $0.0100 | $6.25 | $8.43 | $132,600 |
| 344-7011 SP MIXES SP-C SAC-B PG64-22 | 3,642 TON | $110.00 | $137.87 | $130.31 | $101,503 |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 2,102 SY | $90.00 | $136.79 | $98.88 | $98,353 |
| 462-7034 CONC BOX CULV (10 FT X 6 FT) | 213 LF | $1,400.00 | $980.00 | $1,153.72 | -$89,460 |
| 100-7002 PREPARING ROW | 102.43 STA | $80.00 | $950.00 | $6,072.92 | $89,114 |
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 333 CY | $350.00 | $175.00 | $179.97 | -$58,275 |
| 403-7001 TEMPORARY SPL SHORING | 1,924.5 SF | $32.00 | $60.00 | $25.56 | $53,886 |
| 530-7010 DRIVEWAYS (ACP) | 2,477 SY | $60.00 | $80.60 | $54.96 | $51,026 |
| 505-7001 TMA (STATIONARY) | 316 DAY | $50.00 | $196.00 | $217.57 | $46,136 |
| 464-7003 RC PIPE (CL III)(18 IN) | 902 LF | $49.00 | $95.00 | $83.08 | $41,492 |
| 105-7059 RMV (8"-14") TRT/UNTRT BASE & ASPH PAV | 2,848 SY | $8.00 | $21.25 | $6.31 | $37,736 |
| 466-7107 HEADWALL (CH - PW - 0) (DIA= 48 IN) | 4 EA | $17,000.00 | $8,584.00 | $14,996.86 | -$33,664 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 3,639 CY | $26.00 | $16.75 | $13.19 | -$33,661 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 46 CY | $1,200.00 | $520.00 | $616.83 | -$31,280 |
| 500-7001 MOBILIZATION | 1 LS | $485,000.00 | $458,000.00 | $523,850.32 | -$27,000 |
| 400-7010 CEM STABIL BKFL | 466 CY | $240.00 | $190.00 | $138.14 | -$23,300 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 743 LF | $17.00 | $46.24 | $40.65 | $21,725 |
| 467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) | 54 EA | $1,500.00 | $1,100.00 | $1,176.76 | -$21,600 |
Positive: the low bidder was cheaper on that item. These 20 items account for $288,688 of the $202,967 gap.
JAGOE-PUBLIC COMPANY: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $35,000.00 | $11,585.04 | 3.02x | $234,150 |
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 333 CY | $350.00 | $179.97 | 1.94x | $56,620 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 3,639 CY | $26.00 | $13.19 | 1.97x | $46,609 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 46 CY | $1,200.00 | $616.83 | 1.95x | $26,826 |
| 100-7002 PREPARING ROW | 102.43 STA | $80.00 | $6,072.92 | 0.01x | -$613,855 |
| 168-7001 VEGETATIVE WATERING | 21,250 TGL | $0.0100 | $8.43 | 0.00x | -$179,004 |
| 505-7001 TMA (STATIONARY) | 316 DAY | $50.00 | $217.57 | 0.23x | -$52,953 |
QUALITY EXCAVATION, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 403-7001 TEMPORARY SPL SHORING | 1,924.5 SF | $60.00 | $25.56 | 2.35x | $66,279 |
| 105-7059 RMV (8"-14") TRT/UNTRT BASE & ASPH PAV | 2,848 SY | $21.25 | $6.31 | 3.37x | $42,548 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 3 EA | $18,000.00 | $9,253.78 | 1.95x | $26,239 |
| 100-7002 PREPARING ROW | 102.43 STA | $950.00 | $6,072.92 | 0.16x | -$524,741 |
STX CIVIL: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 168-7001 VEGETATIVE WATERING | 21,250 TGL | $16.00 | $8.43 | 1.90x | $160,784 |
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 21,431 SY | $5.50 | $1.62 | 3.40x | $83,210 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 743 LF | $105.00 | $40.65 | 2.58x | $47,814 |
| 403-7001 TEMPORARY SPL SHORING | 1,924.5 SF | $47.00 | $25.56 | 1.84x | $41,260 |
| 530-7007 DRIVEWAYS (CONC) (HES) | 273 SY | $247.00 | $122.10 | 2.02x | $34,098 |
| 100-7002 PREPARING ROW | 102.43 STA | $216.00 | $6,072.92 | 0.04x | -$599,924 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $2,100.00 | $11,585.04 | 0.18x | -$94,850 |
FOUTSCO PAVING COMPANY, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $39,000.00 | $11,585.04 | 3.37x | $274,150 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 3,639 CY | $75.00 | $13.19 | 5.69x | $224,920 |
| 110-7001 EXCAV (ROADWAY) | 2,841 CY | $50.00 | $11.68 | 4.28x | $108,861 |
| 403-7001 TEMPORARY SPL SHORING | 1,924.5 SF | $45.00 | $25.56 | 1.76x | $37,411 |
| 100-7002 PREPARING ROW | 102.43 STA | $100.00 | $6,072.92 | 0.02x | -$611,806 |
| 168-7001 VEGETATIVE WATERING | 21,250 TGL | $0.0100 | $8.43 | 0.00x | -$179,004 |
| 505-7001 TMA (STATIONARY) | 316 DAY | $1.00 | $217.57 | 0.00x | -$68,437 |
| 466-7107 HEADWALL (CH - PW - 0) (DIA= 48 IN) | 4 EA | $7,042.40 | $14,996.86 | 0.47x | -$31,818 |
| 466-7177 WINGWALL (PW - 1) (HW=7 FT) | 1 EA | $12,355.60 | $36,993.32 | 0.33x | -$24,638 |
OVERLAND CORPORATION: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 316 DAY | $591.05 | $217.57 | 2.72x | $118,019 |
| 496-7038 REMOVE STR (DRIVEWAY CULVERT) | 27 EA | $5,000.00 | $799.87 | 6.25x | $113,403 |
| 105-7059 RMV (8"-14") TRT/UNTRT BASE & ASPH PAV | 2,848 SY | $30.00 | $6.31 | 4.75x | $67,468 |
| 164-7015 DRILL SEED (TEMP_WARM_COOL) | 71,422 SY | $0.8100 | $0.1885 | 4.30x | $44,389 |
| 164-7010 DRILL SEED (PERM_RURAL_CLAY) | 71,422 SY | $0.8200 | $0.2111 | 3.88x | $43,489 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 3 EA | $20,567.50 | $9,253.78 | 2.22x | $33,941 |
| 100-7002 PREPARING ROW | 102.43 STA | $1,968.00 | $6,072.92 | 0.32x | -$420,467 |
| 168-7001 VEGETATIVE WATERING | 21,250 TGL | $0.0100 | $8.43 | 0.00x | -$179,004 |
| 403-7001 TEMPORARY SPL SHORING | 1,924.5 SF | $10.00 | $25.56 | 0.39x | -$29,946 |