FM3016_FROM FM 228 TO CR 1685
3110-01-003 · let Jul 1, 2026 · Houston, Lufkin · Safety Improvement Projects
$3,814,102Low bid: L. S. EQUIPMENT CO., INC.-7.1% vs estimate $4,104,553
$39,009Left on the table1.0% gap to the second bid
5BiddersSpread 9% low to high
87Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | L. S. EQUIPMENT CO., INC. | $3,814,102 | -7.1% | $39,009 | 0 | 3-$810,631 | |
| 2 | PINTO CONSTRUCTION CO., INC. | $3,853,111 | +1.0% | -6.1% | $72,577 | 0 | 3-$872,974 |
| 3 | BIG CREEK CONSTRUCTION, LTD. | $3,925,688 | +2.9% | -4.4% | $115,846 | 0 | 3-$856,475 |
| 4 | A. L. HELMCAMP, INC. | $4,041,534 | +6.0% | -1.5% | $124,704 | 2+$168,639 | 3-$748,860 |
| 5 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | $4,166,237 | +9.2% | 1.5% | 0 | 3-$784,396 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
L. S. EQUIPMENT CO., INC. vs PINTO CONSTRUCTION CO., INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $300,000.00 | $400,000.00 | $523,850.32 | $100,000 |
| 100-7002 PREPARING ROW | 134.45 STA | $1,200.00 | $892.50 | $6,072.92 | -$41,343 |
| 530-7010 DRIVEWAYS (ACP) | 2,470 SY | $70.00 | $56.60 | $54.96 | -$33,098 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $3,000.00 | $1,500.00 | $11,585.04 | -$21,000 |
| 247-7210 FL BS (RDWY DEL) (TY D GR 3) | 18,939 TON | $55.00 | $53.95 | $42.12 | -$19,886 |
| 505-7001 TMA (STATIONARY) | 164 DAY | $150.00 | $250.00 | $217.57 | $16,400 |
| 506-7011 ROCK FILTER DAMS (REMOVE) | 2,216 LF | $4.00 | $8.95 | $12.47 | $10,969 |
| 466-7126 HEADWALL (CH - PW - S) (DIA= 72 IN) | 2 EA | $27,000.00 | $22,050.00 | $20,625.00 | -$9,900 |
| 464-7003 RC PIPE (CL III)(18 IN) | 676 LF | $60.00 | $74.55 | $83.08 | $9,836 |
| 275-7001 CEMENT | 753 TON | $220.00 | $206.99 | $224.93 | -$9,797 |
| 275-7009 CEMENT TRT (EXIST MATL & NEW BASE)(12") | 41,829 SY | $3.50 | $3.29 | $2.49 | -$8,784 |
| 164-7073 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | 104,109 SY | $0.5000 | $0.5800 | $0.5463 | $8,329 |
| 150-7001 BLADING | 134.45 STA | $100.00 | $160.38 | $152.64 | $8,118 |
| 112-7001 SUBGR WIDEN (OC) | 134.45 STA | $375.00 | $415.62 | $458.34 | $5,461 |
| 316-7254 AGGR (TY E OR L, GR-5) | 299 CY | $152.00 | $168.28 | $192.05 | $4,868 |
| 506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) | 180 SY | $36.50 | $10.00 | $30.47 | -$4,770 |
| 496-7037 REMOV STR (PIPE) | 15 EA | $10.00 | $315.00 | $740.62 | $4,575 |
| 316-7032 ASPH (RC-250) | 45 TON | $1,240.00 | $1,338.70 | $1,089.28 | $4,442 |
| 316-7268 AGGR (TY E OR L, PE OR PL GR 4) | 310 CY | $162.00 | $175.72 | $172.39 | $4,253 |
| 158-7002 SPEC EXCAV WORK (HYD EXCAVATOR) | 164 HR | $100.00 | $125.00 | $154.20 | $4,100 |
Positive: the low bidder was cheaper on that item. These 20 items account for $32,773 of the $39,009 gap.
L. S. EQUIPMENT CO., INC.: unbalanced items
Placed 1PINTO CONSTRUCTION CO., INC.: unbalanced items
Placed 2BIG CREEK CONSTRUCTION, LTD.: unbalanced items
Placed 3A. L. HELMCAMP, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 530-7010 DRIVEWAYS (ACP) | 2,470 SY | $110.00 | $54.96 | 2.00x | $135,960 |
| 134-7002 BACKFILL (TY B) | 134.45 STA | $450.00 | $206.94 | 2.17x | $32,679 |
| 100-7002 PREPARING ROW | 134.45 STA | $1,000.00 | $6,072.92 | 0.16x | -$682,054 |
| 112-7001 SUBGR WIDEN (OC) | 134.45 STA | $193.00 | $458.34 | 0.42x | -$35,675 |
| 168-7001 VEGETATIVE WATERING | 4,187.7 TGL | $1.00 | $8.43 | 0.12x | -$31,130 |