FY 2026 DW Pavement Markings
0916-00-254 · let Aug 5, 2026 · Nueces, Corpus Christi · Traffic Control Devices
$4,763,993Low bid: TRP INFRASTRUCTURE SERVICES, LLC-7.5% vs estimate $5,148,857
$115,602Left on the table2.4% gap to the second bid
6BiddersSpread 29% low to high
51Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TRP INFRASTRUCTURE SERVICES, LLC | $4,763,993 | -7.5% | $115,602 | 1+$68,566 | 3-$609,591 | |
| 2 | CENTERLINE TECHNOLOGIES, LLC | $4,879,595 | +2.4% | -5.2% | $284,249 | 1+$90,816 | 2-$572,361 |
| 3 | L&L COMPANY | $5,163,844 | +8.4% | 0.3% | $24,022 | 1+$39,997 | 2-$593,354 |
| 4 | STRIPE-A-ZONE, LLC | $5,187,865 | +8.9% | 0.8% | $605,310 | 0 | 3-$519,927 |
| 5 | PAVEMENT MARKINGS INC. | $5,793,175 | +21.6% | 12.5% | $361,040 | 0 | 2-$577,761 |
| 6 | VIZCAINO, L.P. | $6,154,215 | +29.2% | 19.5% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
TRP INFRASTRUCTURE SERVICES, LLC vs CENTERLINE TECHNOLOGIES, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 666-7265 RE PROFILE PM TY I(W)6"(SLD)(090MIL) | 1,540,949 LF | $0.5400 | $0.5100 | $0.5887 | -$46,228 |
| 666-7410 REFL PAV MRK TY I (W)6"(SLD)(090MIL) | 2,272,968 LF | $0.3800 | $0.3600 | $0.4886 | -$45,459 |
| 666-7422 REFL PAV MRK TY I (Y)6"(SLD)(090MIL) | 1,900,703 LF | $0.3800 | $0.3600 | $0.5014 | -$38,014 |
| 666-7269 RE PROFILE PM TY I(Y)6"(SLD)(090MIL) | 1,189,234 LF | $0.5400 | $0.5100 | $0.6020 | -$35,677 |
| 666-7175 RE PM TY II (W) 6" (SLD) | 1,540,949 LF | $0.1100 | $0.1300 | $0.1701 | $30,819 |
| 672-7004 REFL PAV MRKR TY II-A-A | 59,593 EA | $3.50 | $4.00 | $3.97 | $29,797 |
| 668-7087 PREFAB PM TY C (W)(12")(SLD) | 7,093 LF | $5.00 | $9.00 | $8.49 | $28,372 |
| 668-7091 PREFAB PM TY C (W)(ARROW) | 393 EA | $120.00 | $185.00 | $201.69 | $25,545 |
| 666-7213 RE PM TY II (Y) 6" (SLD) | 1,189,234 LF | $0.1100 | $0.1300 | $0.1749 | $23,785 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 284,293 LF | $0.1200 | $0.2000 | $0.2040 | $22,743 |
| 505-7003 TMA (MOBILE OPERATION) | 89 DAY | $1,000.00 | $1,250.00 | $229.60 | $22,250 |
| 668-7089 PREFAB PM TY C (W)(24")(SLD) | 10,145 LF | $9.00 | $11.00 | $13.72 | $20,290 |
| 672-7006 REFL PAV MRKR TY II-C-R | 36,866 EA | $3.50 | $4.00 | $4.19 | $18,433 |
| 677-7009 ELIM EXT PM & MRKS (ARROW) | 407 EA | $20.00 | $50.00 | $50.50 | $12,210 |
| 668-7111 PREFAB PM TY C (W)(36")(YLD TRI) | 1,273 EA | $16.00 | $25.00 | $38.96 | $11,457 |
| 677-7015 ELIM EXT PM & MRKS (WORD) | 348 EA | $20.00 | $50.00 | $53.95 | $10,440 |
| 666-7023 REFL PAV MRK TY I (W)8"(SLD)(090MIL) | 126,969 LF | $0.6200 | $0.7000 | $0.9036 | $10,158 |
| 666-7273 RE PROFILE PM TY I(Y)6"(BRK)(090MIL) | 304,583 LF | $0.5400 | $0.5100 | $0.5289 | -$9,137 |
| 666-7407 REFL PAV MRK TY I (W)6"(BRK)(090MIL) | 370,554 LF | $0.3800 | $0.3600 | $0.5397 | -$7,411 |
| 668-7001 PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE) | 972 LF | $2.50 | $10.00 | $10.44 | $7,290 |
Positive: the low bidder was cheaper on that item. These 20 items account for $91,661 of the $115,602 gap.
TRP INFRASTRUCTURE SERVICES, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7003 TMA (MOBILE OPERATION) | 89 DAY | $1,000.00 | $229.60 | 4.36x | $68,566 |
| 500-7001 MOBILIZATION | 1 LS | $10,000.00 | $523,850.32 | 0.02x | -$513,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $500.00 | $11,585.04 | 0.04x | -$66,510 |
| 668-7111 PREFAB PM TY C (W)(36")(YLD TRI) | 1,273 EA | $16.00 | $38.96 | 0.41x | -$29,230 |