Bid Tab X-ray: 0500-03-664

Aug 6, 2026 · Harris Sign up free
Set your company to personalize scores

IH 45 FR OL: N of BNSF RR to Canino

0500-03-664 · let Aug 6, 2026 · Harris, Houston · Overlay

$5,092,365Low bid: MBN ENTERPRISES LLC+13.1% vs estimate $4,502,237
$281,684Left on the table5.5% gap to the second bid
5BiddersSpread 33% low to high
54Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1MBN ENTERPRISES LLC $5,092,36513.1% $281,684 0 2-$56,730
2TEXAS MATERIALS GROUP, INC. $5,374,049+5.5%19.4% $426,176 4+$242,397 2-$460,531
3FORDE CONSTRUCTION COMPANY, INC. $5,800,225+13.9%28.8% $22,062 2+$426,094 1-$368,850
4ENVIRONMENTAL ALLIES, INC. $5,822,286+14.3%29.3% $955,495 4+$438,362 0
5DURWOOD GREENE CONSTRUCTION CO. $6,777,781+33.1%50.5% 5+$1,051,289 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.

Where the job was won

MBN ENTERPRISES LLC vs TEXAS MATERIALS GROUP, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
500-7001 MOBILIZATION1 LS $400,000.00$116,000.00$523,850.32 -$284,000
361-7036 FULL - DEPTH REPAIR CPJR (8")423 CY $720.00$1,025.00$994.40 $129,015
361-7001 FULL - DEPTH REPAIR CRCP (6")388 CY $740.00$1,025.00$981.89 $110,580
529-7014 CONC CURB (DOWEL)1,283 LF $11.00$82.00$33.73 $91,093
354-7052 PLANE ASPH CONC PAV(3")79,415 SY $3.00$4.00$2.92 $79,415
316-7067 ASPH (AC-20-5TR OR AC-20XP)41,054 GAL $2.40$4.30$3.44 $78,003
505-7001 TMA (STATIONARY)110 DAY $140.00$750.00$217.57 $67,100
344-7064 SP MIXES SP-D SAC-A PG76-2216,912 TON $158.00$154.50$129.17 -$59,192
104-7016 REMOV CONC (CURB)1,283 LF $4.00$44.00$6.82 $51,320
104-7005 REMOV CONC (MOWSTRIP)5,023 LF $4.00$11.00$9.49 $35,161
316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B)877 CY $185.00$145.00$165.18 -$35,080
354-7051 PLANE ASPH CONC PAV(2")34,623 SY $3.00$4.00$1.86 $34,623
544-7001 GUARDRAIL END TREATMENT (INSTALL)30 EA $3,500.00$2,815.00$3,190.07 -$20,550
662-7017 WK ZN PAV MRK NON-REMOV (W)24"(SLD)4,848 LF $5.00$1.50$3.95 -$16,968
531-7003 CONC SIDEWALKS (6")53 SY $105.00$410.00$88.84 $16,165
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING8 MO $7,000.00$5,000.00$11,585.04 -$16,000
668-7089 PREFAB PM TY C (W)(24")(SLD)1,212 LF $15.00$26.75$13.72 $14,241
662-7012 WK ZN PAV MRK NON-REMOV (W)8"(SLD)12,706 LF $1.00$2.00$0.6092 $12,706
662-7038 WK ZN PAV MRK NON-REMOV (Y)6"(SLD)40,704 LF $0.6000$0.3000$0.2770 -$12,211
432-7013 RIPRAP (MOW STRIP)(4 IN)218 CY $650.00$600.00$616.83 -$10,900

Positive: the low bidder was cheaper on that item. These 20 items account for $264,520 of the $281,684 gap.

MBN ENTERPRISES LLC: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
529-7014 CONC CURB (DOWEL)1,283 LF $11.00$33.730.33x-$29,168
104-7005 REMOV CONC (MOWSTRIP)5,023 LF $4.00$9.490.42x-$27,562

TEXAS MATERIALS GROUP, INC.: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
354-7051 PLANE ASPH CONC PAV(2")34,623 SY $4.00$1.862.15x$74,197
529-7014 CONC CURB (DOWEL)1,283 LF $82.00$33.732.43x$61,925
505-7001 TMA (STATIONARY)110 DAY $750.00$217.573.45x$58,567
104-7016 REMOV CONC (CURB)1,283 LF $44.00$6.826.46x$47,708
500-7001 MOBILIZATION1 LS $116,000.00$523,850.320.22x-$407,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING8 MO $5,000.00$11,585.040.43x-$52,680

FORDE CONSTRUCTION COMPANY, INC.: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
361-7001 FULL - DEPTH REPAIR CRCP (6")388 CY $2,000.00$981.892.04x$395,026
505-7001 TMA (STATIONARY)110 DAY $500.00$217.572.30x$31,067
500-7001 MOBILIZATION1 LS $155,000.00$523,850.320.30x-$368,850

ENVIRONMENTAL ALLIES, INC.: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B)877 CY $365.00$165.182.21x$175,245
316-7067 ASPH (AC-20-5TR OR AC-20XP)41,054 GAL $7.00$3.442.04x$146,160
354-7051 PLANE ASPH CONC PAV(2")34,623 SY $4.00$1.862.15x$74,197
104-7005 REMOV CONC (MOWSTRIP)5,023 LF $18.00$9.491.90x$42,760

DURWOOD GREENE CONSTRUCTION CO.: unbalanced items

Placed 5
ItemQtyTheir priceMarketx market$ vs market
361-7001 FULL - DEPTH REPAIR CRCP (6")388 CY $2,100.00$981.892.14x$433,826
361-7036 FULL - DEPTH REPAIR CPJR (8")423 CY $1,800.00$994.401.81x$340,767
432-7013 RIPRAP (MOW STRIP)(4 IN)218 CY $1,200.00$616.831.95x$127,131
104-7005 REMOV CONC (MOWSTRIP)5,023 LF $30.00$9.493.16x$103,036
529-7014 CONC CURB (DOWEL)1,283 LF $70.00$33.732.08x$46,529