SH 121 FR from Hickory Dr. to Hickory Dr
0363-03-061 · let Aug 6, 2026 · Tarrant, Fort Worth · Overlay
$3,202,525Low bid: FOUTSCO PAVING COMPANY, LLC+9.5% vs estimate $2,924,978
$54,266Left on the table1.7% gap to the second bid
5BiddersSpread 10% low to high
64Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | FOUTSCO PAVING COMPANY, LLC | $3,202,525 | 9.5% | $54,266 | 1+$153,660 | 3-$448,905 | |
| 2 | AUSTIN BRIDGE & ROAD SERVICES, LP | $3,256,791 | +1.7% | 11.3% | $89,440 | 1+$101,698 | 2-$69,201 |
| 3 | TEXAS MATERIALS GROUP, INC. | $3,346,231 | +4.5% | 14.4% | $54,282 | 2+$142,239 | 3-$376,895 |
| 4 | PEACHTREE CONSTRUCTION, LTD. | $3,400,513 | +6.2% | 16.3% | $134,658 | 1+$73,660 | 2-$350,330 |
| 5 | JAGOE-PUBLIC COMPANY | $3,535,171 | +10.4% | 20.9% | 4+$213,860 | 1-$51,229 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
FOUTSCO PAVING COMPANY, LLC vs AUSTIN BRIDGE & ROAD SERVICES, LP, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $150,000.00 | $358,247.01 | $523,850.32 | $208,247 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $50,000.00 | $12,414.27 | $11,585.04 | -$150,343 |
| 344-7024 SP MIXES SP-C SAC-A PG70-28 | 12,706 TON | $142.00 | $137.60 | $156.36 | -$55,906 |
| 316-7173 AGGR (TY-B, GR-4)(SAC-B) | 670 CY | $250.00 | $330.00 | $178.21 | $53,600 |
| 316-7007 ASPH (AC-20-5TR) | 29,464 GAL | $5.00 | $3.53 | $3.27 | -$43,312 |
| 344-7044 SP MIXES SP-D PG64-22 (LEVEL-UP) | 1,271 TON | $130.00 | $100.50 | $153.47 | -$37,495 |
| 354-7081 PLANE ASPH CONC PAV (2" TO 4 1/2") | 73,660 SY | $1.50 | $2.00 | $2.34 | $36,830 |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 2,210 SY | $75.50 | $81.55 | $60.19 | $13,371 |
| 104-7018 REMOV CONC (CURB OR CURB & GUTTER) | 2,500 LF | $7.00 | $10.00 | $11.27 | $7,500 |
| 100-7002 PREPARING ROW | 10 STA | $300.00 | $885.00 | $6,072.92 | $5,850 |
| 666-7347 PAVEMENT SLER 6" | 48,010 LF | $0.2000 | $0.1000 | $0.1841 | -$4,801 |
| 134-7004 BACKFILL (TY A OR B) | 25 STA | $150.00 | $330.79 | $211.21 | $4,520 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 75 CY | $650.00 | $707.05 | $616.83 | $4,279 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 1,100 LF | $0.1000 | $3.75 | $3.92 | $4,015 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $5,000.00 | $3,288.60 | $9,253.78 | -$3,423 |
| 666-7305 TY I HIGH PERF PM (Y)6"(SLD)(100MIL) | 22,110 LF | $0.5600 | $0.7000 | $0.5714 | $3,095 |
| 666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 21,700 LF | $0.5600 | $0.7000 | $0.5533 | $3,038 |
| 666-7072 REFL PAV MRK TY I(W)(EXIT GORE)(100MIL) | 4 EA | $1,600.00 | $900.00 | $964.21 | -$2,800 |
| 506-7043 BIODEG EROSN CONT LOGS (INSTL) (8") | 500 LF | $0.1000 | $5.50 | $4.63 | $2,700 |
| 662-7038 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) | 22,110 LF | $0.2600 | $0.3700 | $0.2770 | $2,432 |
Positive: the low bidder was cheaper on that item. These 20 items account for $51,397 of the $54,266 gap.
FOUTSCO PAVING COMPANY, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $50,000.00 | $11,585.04 | 4.32x | $153,660 |
| 500-7001 MOBILIZATION | 1 LS | $150,000.00 | $523,850.32 | 0.29x | -$373,850 |
| 100-7002 PREPARING ROW | 10 STA | $300.00 | $6,072.92 | 0.05x | -$57,729 |
| 505-7001 TMA (STATIONARY) | 80 DAY | $1.00 | $217.57 | 0.00x | -$17,326 |
AUSTIN BRIDGE & ROAD SERVICES, LP: unbalanced items
Placed 2TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $30,000.00 | $11,585.04 | 2.59x | $73,660 |
| 529-7009 CONC CURB & GUTTER (TY II) | 2,500 LF | $60.00 | $32.57 | 1.84x | $68,580 |
| 500-7001 MOBILIZATION | 1 LS | $225,000.00 | $523,850.32 | 0.43x | -$298,850 |
| 100-7002 PREPARING ROW | 10 STA | $1.00 | $6,072.92 | 0.00x | -$60,719 |
| 505-7001 TMA (STATIONARY) | 80 DAY | $1.00 | $217.57 | 0.00x | -$17,326 |
PEACHTREE CONSTRUCTION, LTD.: unbalanced items
Placed 4JAGOE-PUBLIC COMPANY: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $40,250.00 | $11,585.04 | 3.47x | $114,660 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 75 CY | $1,200.00 | $616.83 | 1.95x | $43,738 |
| 134-7004 BACKFILL (TY A OR B) | 25 STA | $1,570.00 | $211.21 | 7.43x | $33,970 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $20,000.00 | $9,253.78 | 2.16x | $21,492 |
| 100-7002 PREPARING ROW | 10 STA | $950.00 | $6,072.92 | 0.16x | -$51,229 |