Bid Tab X-ray: 6511-08-001

Nov 18, 2026 · Madison Sign up free
Set your company to personalize scores

FY27 - Madison HMA - 11

6511-08-001 · let Nov 18, 2026 · Madison, Bryan · Material Maintenance Project

$270,750Low bid: KNIFE RIVER CORPORATION - SOUTH-12.7% vs estimate $310,000
$550Left on the table0.2% gap to the second bid
3BiddersSpread 11% low to high
2Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1KNIFE RIVER CORPORATION - SOUTH $270,750-12.7% $550 0 0
2BIG CREEK CONSTRUCTION, LTD. $271,300+0.2%-12.5% $28,400 0 0
3AMERICAN MATERIALS, INC. $299,700+10.7%-3.3% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.

Where the job was won

KNIFE RIVER CORPORATION - SOUTH vs BIG CREEK CONSTRUCTION, LTD., biggest item swings
ItemQtyLow2ndMarket2nd minus low
8011-7092 D-GR HMA TY F PG 64-22 (DEL) SITE 12,000 TON $96.25$98.10$101.37 $3,700
8011-7091 D-GR HMA TY F PG 64-22 (PICKUP)1,000 TON $78.25$75.10$87.59 -$3,150

Positive: the low bidder was cheaper on that item. These 2 items account for $550 of the $550 gap.