FY 25 Post RDC Pre-Packaged Concrete
6475-63-001 · let Dec 4, 2024 · Garza, Maintenance Division · Material Maintenance Project
$159,800Low bid: AKA-MATERIALS-21.7% vs estimate $204,000
$13,600Left on the table8.5% gap to the second bid
7BiddersSpread 240% low to high
1Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | AKA-MATERIALS | $159,800 | -21.7% | $13,600 | 0 | 0 | |
| 2 | TOUCHSTONE RESOURCES, LLC | $173,400 | +8.5% | -15.0% | $4,760 | 0 | 0 |
| 3 | SOUTHERN SOURCING SOLUTIONS, LLC | $178,160 | +11.5% | -12.7% | $15,980 | 0 | 0 |
| 4 | DIGG COMMERCIAL, LLC | $194,140 | +21.5% | -4.8% | $8,840 | 0 | 0 |
| 5 | SKYLINE BRIDGE LLC | $202,980 | +27.0% | -0.5% | $64,260 | 0 | 0 |
| 6 | USA AMTECH, INC. | $267,240 | +67.2% | 31.0% | $276,760 | ||
| 7 | TUFFTEX MATERIALS | $544,000 | +240.4% | 166.7% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
AKA-MATERIALS vs TOUCHSTONE RESOURCES, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 7032-7001 PREPACKAGED CONCRETE (DEL)(ST1) | 34,000 BAG | $4.70 | $5.10 | $4.70 | $13,600 |
Positive: the low bidder was cheaper on that item. These 1 items account for $13,600 of the $13,600 gap.