Bid Tab X-ray: 6475-67-001

Dec 4, 2024 · Henderson Sign up free
Set your company to personalize scores

FY 25 Athens RDC Bagged ASPPM

6475-67-001 · let Dec 4, 2024 · Henderson, Maintenance Division · Material Maintenance Project

$150,000Low bid: WALLER COUNTY ASPHALT INC.-26.5% vs estimate $204,000
$38,400Left on the table25.6% gap to the second bid
5BiddersSpread 252% low to high
1Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1WALLER COUNTY ASPHALT INC. $150,000-26.5% $38,400 0 0
2SOUTHERN SOURCING SOLUTIONS, LLC $188,400+25.6%-7.6% $49,920 0 0
3USA AMTECH, INC. $238,320+58.9%16.8% $22,560 0 0
4SKYLINE BRIDGE LLC $260,880+73.9%27.9% $267,120 0 0
5TUFFTEX MATERIALS $528,000+252.0%158.8% 1+$378,000 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.

Where the job was won

WALLER COUNTY ASPHALT INC. vs SOUTHERN SOURCING SOLUTIONS, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8012-7060 ASPH CONC PAT MAT(ASPPM)(DEL)(ST2)12,000 BAG $12.50$15.70$12.50 $38,400

Positive: the low bidder was cheaper on that item. These 1 items account for $38,400 of the $38,400 gap.

TUFFTEX MATERIALS: unbalanced items

Placed 5
ItemQtyTheir priceMarketx market$ vs market
8012-7060 ASPH CONC PAT MAT(ASPPM)(DEL)(ST2)12,000 BAG $44.00$12.503.52x$378,000