FY 25 Seguin RDC Bagged ASPPM
6475-68-001 · let Dec 4, 2024 · Guadalupe, Maintenance Division · Material Maintenance Project
$212,500Low bid: WALLER COUNTY ASPHALT INC.-26.5% vs estimate $289,000
$59,840Left on the table28.2% gap to the second bid
3BiddersSpread 252% low to high
1Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | WALLER COUNTY ASPHALT INC. | $212,500 | -26.5% | $59,840 | 0 | 0 | |
| 2 | SOUTHERN SOURCING SOLUTIONS, LLC | $272,340 | +28.2% | -5.8% | $475,660 | 0 | 0 |
| 3 | TUFFTEX MATERIALS | $748,000 | +252.0% | 158.8% | 1+$535,500 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
WALLER COUNTY ASPHALT INC. vs SOUTHERN SOURCING SOLUTIONS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8012-7061 ASPH CONC PAT MAT(ASPPM)(DEL)(ST3) | 17,000 BAG | $12.50 | $16.02 | $12.50 | $59,840 |
Positive: the low bidder was cheaper on that item. These 1 items account for $59,840 of the $59,840 gap.
TUFFTEX MATERIALS: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 8012-7061 ASPH CONC PAT MAT(ASPPM)(DEL)(ST3) | 17,000 BAG | $44.00 | $12.50 | 3.52x | $535,500 |