6484-16-001 Hot Mix Karnes Maint.
6484-16-001 · let May 20, 2025 · Karnes, Corpus Christi · Material Maintenance Project
$769,500Low bid: TEXAS MATERIALS GROUP, INC.-2.8% vs estimate $792,000
$6,030Left on the table0.8% gap to the second bid
4BiddersSpread 64% low to high
1Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TEXAS MATERIALS GROUP, INC. | $769,500 | -2.8% | $6,030 | 0 | 0 | |
| 2 | COLORADO MATERIALS, LTD. | $775,530 | +0.8% | -2.1% | $25,470 | 0 | 0 |
| 3 | BRAUNTEX MATERIALS, INC. | $801,000 | +4.1% | 1.1% | $459,000 | 0 | 0 |
| 4 | TOUCHSTONE RESOURCES, LLC | $1,260,000 | +63.7% | 59.1% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
TEXAS MATERIALS GROUP, INC. vs COLORADO MATERIALS, LTD., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8011-7056 D-GR HMA TY D PG 64-22 (DEL) SITE 1 | 9,000 TON | $85.50 | $86.17 | $99.54 | $6,030 |
Positive: the low bidder was cheaper on that item. These 1 items account for $6,030 of the $6,030 gap.