Limestone Rock Asphalt Webb
6484-38-001 · let May 20, 2025 · Webb, Laredo · Material Maintenance Project - Sealed
$566,650Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+1.5% vs estimate $558,400
$24,650Left on the table4.4% gap to the second bid
2BiddersSpread 4% low to high
2Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | VULCAN CONSTRUCTION MATERIALS, LLC | $566,650 | 1.5% | $24,650 | 0 | 0 | |
| 2 | MARTIN MARIETTA MATERIALS, INC. | $591,300 | +4.4% | 5.9% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8001-7093 LRA (TY II GR CS) (DEL) (ST1) | 5,000 TON | $107.41 | $111.98 | $104.61 | $22,850 |
| 8001-7007 LRA (TY II GR CS) (PICKUP) | 400 TON | $74.00 | $78.50 | $74.00 | $1,800 |
Positive: the low bidder was cheaper on that item. These 2 items account for $24,650 of the $24,650 gap.