FY 26 LRA
6491-12-001 · let Sep 17, 2025 · Jefferson, Beaumont · Material Maintenance Project - Sealed
$672,636Low bid: MARTIN MARIETTA MATERIALS, INC.-7.9% vs estimate $730,700
$1,901Left on the table0.3% gap to the second bid
2BiddersSpread 0% low to high
8Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | MARTIN MARIETTA MATERIALS, INC. | $672,636 | -7.9% | $1,901 | 0 | 0 | |
| 2 | VULCAN CONSTRUCTION MATERIALS, LLC | $674,537 | +0.3% | -7.7% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
MARTIN MARIETTA MATERIALS, INC. vs VULCAN CONSTRUCTION MATERIALS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8001-7111 LRA (TY II GR DS) (DEL) (ST5) | 1,000 TON | $164.79 | $167.50 | $127.02 | $2,710 |
| 8001-7108 LRA (TY II GR DS) (DEL) (ST2) | 500 TON | $147.82 | $145.03 | $141.87 | -$1,395 |
| 8001-7110 LRA (TY II GR DS) (DEL) (ST4) | 1,000 TON | $157.49 | $158.47 | $127.32 | $980 |
| 8001-7113 LRA (TY II GR DS) (DEL) (ST7) | 500 TON | $161.51 | $163.09 | $130.23 | $790 |
| 8001-7109 LRA (TY II GR DS) (DEL) (ST3) | 200 TON | $148.55 | $145.87 | $132.08 | -$536 |
| 8001-7107 LRA (TY II GR DS) (DEL) (ST1) | 300 TON | $156.40 | $154.90 | $125.06 | -$450 |
| 8001-7010 LRA (TY I GR AA) (DEL) (ST2) | 500 TON | $144.72 | $144.03 | $124.75 | -$345 |
| 8001-7112 LRA (TY II GR DS) (DEL) (ST6) | 300 TON | $155.67 | $156.16 | $119.25 | $147 |
Positive: the low bidder was cheaper on that item. These 8 items account for $1,901 of the $1,901 gap.