John McCain Rd; At Monticello Pkwy
0902-90-213 · let Oct 9, 2025 · Tarrant, Fort Worth · Safety Improvement Projects
$538,838Low bid: GREY SKY CONSTRUCTION LLC+2.2% vs estimate $527,107
$47,758Left on the table8.9% gap to the second bid
4BiddersSpread 32% low to high
48Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | GREY SKY CONSTRUCTION LLC | $538,838 | 2.2% | $47,758 | 16+$152,790 | 1-$473,850 | |
| 2 | JAGOE-PUBLIC COMPANY | $586,596 | +8.9% | 11.3% | $82,712 | 14+$201,379 | 2-$462,276 |
| 3 | ED BELL CONSTRUCTION COMPANY | $669,308 | +24.2% | 27.0% | $43,975 | 20+$290,013 | 1-$460,850 |
| 4 | TEXAS MATERIALS GROUP, INC. | $713,284 | +32.4% | 35.3% | 13+$305,778 | 1-$453,850 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
GREY SKY CONSTRUCTION LLC vs JAGOE-PUBLIC COMPANY, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 466-7175 WINGWALL (PW - 1) (HW=5 FT) | 2 EA | $20,000.00 | $60,000.00 | $23,385.57 | $80,000 |
| 100-7002 PREPARING ROW | 4 STA | $12,500.00 | $5,000.00 | $6,072.92 | -$30,000 |
| 341-7001 D-GR HMA TY-B PG64-22 | 254 TON | $195.00 | $120.00 | $97.82 | -$19,050 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $65,100.00 | $523,850.32 | $15,100 |
| 462-7006 CONC BOX CULV (5 FT X 2 FT) | 66 LF | $650.00 | $500.00 | $479.64 | -$9,900 |
| 752-7008 TREE REMOVAL (24" - 30" DIA) | 2 EA | $3,500.00 | $8,000.00 | $208.61 | $9,000 |
| 685-7004 INSTL RDSD FLSH BCN ASSM (SOLAR PWRD) | 2 EA | $15,000.00 | $11,000.00 | $5,710.21 | -$8,000 |
| 506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) | 228 SY | $50.00 | $15.00 | $30.47 | -$7,980 |
| 496-7008 REMOV STR (BOX CULVERT) | 66 LF | $150.00 | $260.00 | $85.27 | $7,260 |
| 496-7006 REMOV STR (HEADWALL) | 2 EA | $2,500.00 | $6,000.00 | $1,533.90 | $7,000 |
| 752-7005 TREE REMOVAL (4" - 12" DIA) | 3 EA | $1,500.00 | $3,800.00 | $60.77 | $6,900 |
| 479-7008 ADJUSTING MANHOLES (WATER METER) | 3 EA | $2,500.00 | $480.00 | $710.24 | -$6,060 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,100 SY | $15.00 | $20.00 | $3.93 | $5,500 |
| 105-7004 RMV (4"-8") TRT/UNTRT BASE & ASPH PAV | 1,059 SY | $20.00 | $25.00 | $4.38 | $5,295 |
| 530-7006 DRIVEWAYS (CONC) | 58 SY | $100.00 | $190.00 | $109.20 | $5,220 |
| 110-7001 EXCAV (ROADWAY) | 51 CY | $20.00 | $100.00 | $11.68 | $4,080 |
| 344-7025 SP MIXES SP-C SAC-B PG70-28 | 128 TON | $200.00 | $170.00 | $124.40 | -$3,840 |
| 166-7001 FERTILIZER | 0.2 AC | $20,000.00 | $1,000.00 | $717.14 | -$3,800 |
| 168-7001 VEGETATIVE WATERING | 12 TGL | $50.00 | $350.00 | $8.43 | $3,600 |
| 506-7024 CONSTRUCTION EXITS (REMOVE) | 228 SY | $20.00 | $5.00 | $8.93 | -$3,420 |
Positive: the low bidder was cheaper on that item. These 20 items account for $56,905 of the $47,758 gap.
GREY SKY CONSTRUCTION LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 100-7002 PREPARING ROW | 4 STA | $12,500.00 | $6,072.92 | 2.06x | $25,708 |
| 341-7001 D-GR HMA TY-B PG64-22 | 254 TON | $195.00 | $97.82 | 1.99x | $24,682 |
| 685-7004 INSTL RDSD FLSH BCN ASSM (SOLAR PWRD) | 2 EA | $15,000.00 | $5,710.21 | 2.63x | $18,580 |
| 105-7004 RMV (4"-8") TRT/UNTRT BASE & ASPH PAV | 1,059 SY | $20.00 | $4.38 | 4.56x | $16,538 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,100 SY | $15.00 | $3.93 | 3.82x | $12,182 |
| 529-7009 CONC CURB & GUTTER (TY II) | 247 LF | $65.00 | $32.57 | 2.00x | $8,011 |
| 752-7008 TREE REMOVAL (24" - 30" DIA) | 2 EA | $3,500.00 | $208.61 | 16.78x | $6,583 |
| 160-7002 FURN & PLACE TOPSOIL (4") | 300 SY | $20.00 | $1.43 | 13.99x | $5,571 |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 1,004 LF | $6.00 | $0.4986 | 12.03x | $5,523 |
| 479-7008 ADJUSTING MANHOLES (WATER METER) | 3 EA | $2,500.00 | $710.24 | 3.52x | $5,369 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $523,850.32 | 0.10x | -$473,850 |
JAGOE-PUBLIC COMPANY: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 466-7175 WINGWALL (PW - 1) (HW=5 FT) | 2 EA | $60,000.00 | $23,385.57 | 2.57x | $73,229 |
| 105-7004 RMV (4"-8") TRT/UNTRT BASE & ASPH PAV | 1,059 SY | $25.00 | $4.38 | 5.70x | $21,833 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,100 SY | $20.00 | $3.93 | 5.09x | $17,682 |
| 752-7008 TREE REMOVAL (24" - 30" DIA) | 2 EA | $8,000.00 | $208.61 | 38.35x | $15,583 |
| 496-7008 REMOV STR (BOX CULVERT) | 66 LF | $260.00 | $85.27 | 3.05x | $11,532 |
| 752-7005 TREE REMOVAL (4" - 12" DIA) | 3 EA | $3,800.00 | $60.77 | 62.53x | $11,218 |
| 685-7004 INSTL RDSD FLSH BCN ASSM (SOLAR PWRD) | 2 EA | $11,000.00 | $5,710.21 | 1.93x | $10,580 |
| 529-7009 CONC CURB & GUTTER (TY II) | 247 LF | $70.00 | $32.57 | 2.15x | $9,246 |
| 496-7006 REMOV STR (HEADWALL) | 2 EA | $6,000.00 | $1,533.90 | 3.91x | $8,932 |
| 752-7006 TREE REMOVAL (12" - 18" DIA) | 2 EA | $2,800.00 | $100.44 | 27.88x | $5,399 |
| 500-7001 MOBILIZATION | 1 LS | $65,100.00 | $523,850.32 | 0.12x | -$458,750 |
| 506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) | 228 SY | $15.00 | $30.47 | 0.49x | -$3,526 |
ED BELL CONSTRUCTION COMPANY: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 462-7006 CONC BOX CULV (5 FT X 2 FT) | 66 LF | $1,200.00 | $479.64 | 2.50x | $47,544 |
| 466-7175 WINGWALL (PW - 1) (HW=5 FT) | 2 EA | $45,000.00 | $23,385.57 | 1.92x | $43,229 |
| 100-7002 PREPARING ROW | 4 STA | $15,000.00 | $6,072.92 | 2.47x | $35,708 |
| 341-7001 D-GR HMA TY-B PG64-22 | 254 TON | $200.00 | $97.82 | 2.04x | $25,952 |
| 105-7004 RMV (4"-8") TRT/UNTRT BASE & ASPH PAV | 1,059 SY | $25.00 | $4.38 | 5.70x | $21,833 |
| 344-7025 SP MIXES SP-C SAC-B PG70-28 | 128 TON | $275.00 | $124.40 | 2.21x | $19,277 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,100 SY | $20.00 | $3.93 | 5.09x | $17,682 |
| 530-7006 DRIVEWAYS (CONC) | 58 SY | $300.00 | $109.20 | 2.75x | $11,067 |
| 529-7009 CONC CURB & GUTTER (TY II) | 247 LF | $75.00 | $32.57 | 2.30x | $10,481 |
| 5047-7001 RELOCATE FIRE HYDRANT | 1 EA | $15,000.00 | $5,500.00 | 2.73x | $9,500 |
| 500-7001 MOBILIZATION | 1 LS | $63,000.00 | $523,850.32 | 0.12x | -$460,850 |
TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $40,000.00 | $11,585.04 | 3.45x | $113,660 |
| 341-7001 D-GR HMA TY-B PG64-22 | 254 TON | $300.00 | $97.82 | 3.07x | $51,352 |
| 344-7025 SP MIXES SP-C SAC-B PG70-28 | 128 TON | $410.00 | $124.40 | 3.30x | $36,557 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,100 SY | $33.95 | $3.93 | 8.65x | $33,027 |
| 450-7044 RAIL (TY PR11) | 110 LF | $275.00 | $131.50 | 2.09x | $15,785 |
| 168-7001 VEGETATIVE WATERING | 12 TGL | $1,034.00 | $8.43 | 122.60x | $12,307 |
| 105-7004 RMV (4"-8") TRT/UNTRT BASE & ASPH PAV | 1,059 SY | $16.00 | $4.38 | 3.65x | $12,302 |
| 529-7009 CONC CURB & GUTTER (TY II) | 247 LF | $67.00 | $32.57 | 2.06x | $8,505 |
| 310-7004 PRIME COAT (MC-30) | 221 GAL | $28.95 | $5.35 | 5.41x | $5,216 |
| 110-7001 EXCAV (ROADWAY) | 51 CY | $100.00 | $11.68 | 8.56x | $4,504 |
| 500-7001 MOBILIZATION | 1 LS | $70,000.00 | $523,850.32 | 0.13x | -$453,850 |