Overlay
CCSJ 0136-05-049 · lets Jan 6, 2027 · Delta, Lamar, Paris · SH 19 · Preventive Maintenance
$13,004,091Engineer's estimate
Items at market: $12,034,086 (-7.5%)
$12,262,815Most likely low bid$10,966,237 to $13,030,551 (middle half)
4.4Expected bidders0 plan holders, 0 regular bidders
64/100Worth a lookMarket only. Set your company for a personal score
Where the low bid should land
$12,262,815
Estimate $13,004,091
$9,776,482 (1 in 10 go lower)$14,194,812 (1 in 10 go higher)
From 25 comparable let jobs (district, estimates of $5,201,637 to $32,510,228, last 3 years). 72% of them went under the estimate; the typical low bid was -5.7% vs estimate.
Bid / no-bid score
- Competition19 / 25Jobs like this draw about 4.4 bidders.
- Margin10 / 20Low bids land at 94% of the estimate.
Set your company to add your experience, win rate and size fit.
Comparable jobs
| Nov 2026 | 0009-06-056Hunt · 2 bidders | $14,216,814-24.5% |
| Nov 2026 | 1017-03-040Hunt · 9 bidders | $6,803,596+4.4% |
| Oct 2026 | 0510-06-024Fannin · 6 bidders | $9,766,246-10.6% |
| Oct 2026 | 0410-02-047Grayson · 7 bidders | $9,878,022+7.6% |
| Jul 2026 | 6502-48-001Lamar · 3 bidders | $6,261,324-2.6% |
| Apr 2026 | 0735-01-020Delta · 3 bidders | $4,747,421-15.7% |
| Nov 2025 | 0009-08-033Hunt · 5 bidders | $12,986,715-24.0% |
| Sep 2025 | 1815-01-009Fannin · 4 bidders | $5,445,359-5.7% |
The field: plan holders and how they bid
Last 3 years in TexasNo plan holders posted for this job yet. Check back closer to the letting.
Items that decide this job
103 of 106 items priced from low bids| Item | Qty | Market price | Range of low bids | At market | Share |
|---|---|---|---|---|---|
| 344-7009 SP MIXES SP-C PG64-2224 low bids · prices swing 4x | 44,114 TON | $131.13 | $95.00 – $400.00 | $5,784,493 | 48.1% |
| 344-7009 SP MIXES SP-C PG64-2224 low bids · prices swing 4x | 12,142 TON | $131.13 | $95.00 – $400.00 | $1,592,132 | 13.2% |
| 344-7009 SP MIXES SP-C PG64-2224 low bids · prices swing 4x | 8,383 TON | $131.13 | $95.00 – $400.00 | $1,099,229 | 9.1% |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")54 low bids · prices swing 25x | 9,000 SY | $98.88 | $23.96 – $589.81 | $889,956 | 7.4% |
| 500-7001 MOBILIZATION2229 low bids · prices swing 42,200,000,000x | 1 LS | $523,850.32 | $0.0010 – $42,200,000.00 | $523,850 | 4.4% |
| 533-7005 FILL MILLED ASPH RUMBLE STRIPS (SHLDR)17 low bids · prices swing 46x | 173,892 LF | $3.00 | $1.62 – $75.00 | $522,492 | 4.3% |
| 134-7001 BACKFILL (TY A)113 low bids · prices swing 200x | 869 STA | $224.26 | $30.00 – $6,000.00 | $194,886 | 1.6% |
| 530-7010 DRIVEWAYS (ACP)299 low bids · prices swing 84x | 2,220 SY | $54.96 | $8.88 – $750.00 | $122,001 | 1.0% |
| 533-7005 FILL MILLED ASPH RUMBLE STRIPS (SHLDR)17 low bids · prices swing 46x | 39,764 LF | $3.00 | $1.62 – $75.00 | $119,479 | 1.0% |
| 530-7002 INTERSECTIONS (ACP)93 low bids · prices swing 47x | 1,925 SY | $50.74 | $6.11 – $290.00 | $97,666 | 0.8% |
| 3007-7001 BONDING COURSE228 low bids · prices swing 7,500x | 28,210 GAL | $3.32 | $0.0100 – $75.00 | $93,690 | 0.8% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING2018 low bids · prices swing 273,686,480x | 8 MO | $11,585.04 | $0.0010 – $273,686.48 | $92,680 | 0.8% |
| 354-7003 PLANE & TEXT ASPH CONC PAV(0" TO 3")34 low bids · prices swing 31x | 27,873 SY | $2.75 | $0.7000 – $21.51 | $76,681 | 0.6% |
| 666-7305 TY I HIGH PERF PM (Y)6"(SLD)(100MIL)131 low bids · prices swing 79x | 96,440 LF | $0.5714 | $0.3800 – $30.00 | $55,105 | 0.5% |
| 666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL)123 low bids · prices swing 24x | 94,464 LF | $0.5533 | $0.3800 – $9.14 | $52,269 | 0.4% |