ODOT Bid Results

Aug 2013 · 3 let jobs Sign up free
3Let jobs
$13,160,127Total low bids
$13,337,564Total estimates
-1.3%Low bids vs estimates

Aug 2013 results

Bid tabs (Excel) ExcelCSV
Let dateContractCounty / DistrictProject EstimateLow bidLow bidder% vs est.Bidders
Aug 22, 2013 130208NHPPIY-0035-2(326) Cleveland
Division 3
GRADE, DRAIN, SURFACE , AND BRIDGE I-35: INTERCHANGE AT SH -9E (SOUTH HALF ONLY ). PROJECT LENGTH = 0.828 MILES · $11,846,298 $11,633,999 SHERWOOD CONSTRUCTION CO., INC. -1.8% 3
Aug 22, 2013 130224STPY-NBIP(465) Rogers
Division 8
BRIDGE PAINTING SH -66: OVER BIRD CREEK, 3.68 MILES NORTH OF I -44. PROJECT LENGTH = 0.156 MILES · $1,116,568 $1,012,258 SOUTHERN ROAD & BRIDGE, LLC -9.3% 6
Aug 22, 2013 130230SSP-276C(004)SS Woods
Division 6
INTERSECTION MODIFICATION US -281: AT SH-14 IN THE CITY OF WAYNOKA. PROJECT LENGTH = 0.060 MILES · $374,698 $513,871 TOM HUDSON PAVING, INC. +37.1% 1
1–3 of 3

Source: ODOT bid tabulations for each letting on Contracts and Proposals, read from ODOT's published bid tab reports, including the engineer's estimate. Bid Potato loads new lettings as ODOT posts them and backfills the last two years. Confirm against ODOT's official tabulations.