| 10 | 509(D)0500 |
CLASS C CONCRETE | 34.15 | CY |
$575.00 |
$775.00 |
$500.00 |
$1,110.00 |
| 20 | 511(A)2200 |
REINFORCING STEEL | 1,405 | LB |
$2.50 |
$3.00 |
$3.00 |
$2.98 |
| 30 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 260 | LF |
$1,300.00 |
$1,400.00 |
$1,300.00 |
$1,310.00 |
| 40 | 610(A)5200 |
4" CONCRETE SIDEWALK | 210.6 | SY |
$105.00 |
$115.00 |
$150.00 |
$168.00 |
| 50 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 1,500 | LF |
$42.00 |
$26.00 |
$45.00 |
$48.00 |
| 60 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 17,500 | LF |
$16.00 |
$9.00 |
$15.00 |
$18.00 |
| 70 | 803(A)1210 |
PULL BOX(SIZE I) | 108 | EA |
$1,750.00 |
$1,000.00 |
$1,600.00 |
$2,100.00 |
| 80 | 804(A)2200 |
STRUCTURAL CONCRETE | 95.12 | CY |
$1,450.00 |
$1,100.00 |
$1,300.00 |
$1,110.00 |
| 90 | 804(B)2300 |
REINFORCING STEEL | 16,472 | LB |
$3.10 |
$2.50 |
$4.00 |
$2.98 |
| 100 | 806(C)4508 |
40' MTG & 8' HLMA(G.STL.) | 58 | EA |
$6,000.00 |
$5,000.00 |
$5,785.00 |
$6,200.00 |
| 110 | 807 5120 |
BREAKAWAY BASE (DES. B) | 58 | EA |
$1,100.00 |
$900.00 |
$1,095.00 |
$1,065.00 |
| 120 | 809(A)7200 |
ROADWAY LUMINAIRE | 58 | EA |
$2,100.00 |
$1,800.00 |
$1,565.00 |
$1,480.00 |
| 130 | 809(E)7600 |
HIGH MAST LUMINAIRE | 50 | EA |
$3,800.00 |
$2,825.00 |
$2,100.00 |
$3,750.00 |
| 140 | 810(A)8200 |
SERVICE POLE | 2 | EA |
$6,500.00 |
$10,000.00 |
$8,500.00 |
$7,495.50 |
| 150 | 811 9110 |
1/C NO.2 ELECT.COND. | 57,000 | LF |
$2.00 |
$1.50 |
$4.00 |
$3.55 |
| 160 | 811 9135 |
1/C NO.12 ELECT.COND. | 22,300 | LF |
$1.50 |
$1.00 |
$2.00 |
$1.65 |
| 170 | 812 0150 |
150' HIGH MAST POLE(G.STL.) | 9 | EA |
$85,000.00 |
$77,500.00 |
$82,350.00 |
$77,500.00 |
| 180 | 813 1110 |
HIGH MAST LOWERING DEV.TYP.II | 9 | EA |
$23,000.00 |
$22,500.00 |
$21,225.00 |
$22,000.00 |
| 190 | 870(A)1100 |
SAND FILLED IMPACT ATTEN.MODULE | 95 | EA |
$500.00 |
$467.00 |
$810.00 |
$500.00 |
| 200 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 180 | SD |
$20.00 |
$14.50 |
$100.00 |
$15.00 |
| 210 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$30.00 |
$55.50 |
$60.00 |
$55.00 |
| 220 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 22,000 | LF |
$5.00 |
$1.10 |
$5.00 |
$1.15 |
| 230 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 360 | SD |
$1.25 |
$3.30 |
$5.00 |
$3.35 |
| 240 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,080 | SD |
$2.25 |
$2.20 |
$8.00 |
$2.25 |
| 250 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 1,980 | SD |
$1.00 |
$2.00 |
$5.00 |
$2.00 |
| 260 | 880(F)6700 |
DRUMS | 900 | SD |
$1.00 |
$1.10 |
$5.00 |
$1.15 |
| 270 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$30.00 |
$26.50 |
$50.00 |
$30.00 |
| 280 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$8,000.00 |
$15,000.00 |
$20,000.00 |
| 290 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$190,000.00 |
$195,000.00 |
$250,000.00 |
$299,780.04 |