| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$55,000.00 |
$37,993.33 |
$28,050.00 |
$128,000.00 |
$31,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 21,887 | CY |
$10.00 |
$13.00 |
$10.91 |
$11.00 |
$14.99 |
$15.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 6,961 | CY |
$15.00 |
$14.20 |
$13.24 |
$13.20 |
$17.90 |
$25.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$155,000.00 |
$85,000.00 |
$94,262.63 |
$82,500.00 |
$110,000.00 |
$50,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 3,110 | LF |
$4.50 |
$4.03 |
$3.60 |
$2.48 |
$3.90 |
$2.75 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,274 | LF |
$15.00 |
$23.00 |
$21.00 |
$13.75 |
$22.00 |
$15.00 |
| 70 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 192 | CY |
$150.00 |
$32.00 |
$133.32 |
$129.09 |
$97.00 |
$100.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 109,803 | SY |
$3.00 |
$2.69 |
$2.50 |
$3.01 |
$2.55 |
$3.30 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 23 | AC |
$1,100.00 |
$1,025.00 |
$925.00 |
$1,314.50 |
$950.00 |
$1,440.00 |
| 100 | 241 3100 |
MOWING | 46 | AC |
$300.00 |
$460.00 |
$405.00 |
$273.90 |
$410.00 |
$300.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 13,163 | CY |
$70.00 |
$55.63 |
$67.89 |
$64.41 |
$60.00 |
$65.00 |
| 120 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 40,528 | SY |
$3.00 |
$4.65 |
$3.70 |
$4.38 |
$3.80 |
$4.80 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,859 | TON |
$40.00 |
$32.85 |
$33.13 |
$35.51 |
$44.00 |
$37.50 |
| 140 | 407(B)7300 |
TACK COAT | 9,987 | GAL |
$4.50 |
$3.00 |
$5.09 |
$4.56 |
$2.85 |
$4.25 |
| 150 | 408 8100 |
PRIME COAT | 24,594 | GAL |
$5.00 |
$1.00 |
$5.73 |
$4.40 |
$1.00 |
$6.25 |
| 160 | 409(A)9200 |
FABRIC REINFORCEMENT | 12,791 | SY |
$4.50 |
$1.45 |
$1.31 |
$3.69 |
$4.70 |
$6.00 |
| 170 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 6,090 | TON |
$130.00 |
$112.00 |
$101.26 |
$115.82 |
$112.00 |
$110.00 |
| 180 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,303 | TON |
$120.00 |
$102.20 |
$109.48 |
$118.78 |
$101.00 |
$110.00 |
| 190 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,060 | TON |
$135.00 |
$115.20 |
$101.11 |
$122.65 |
$121.50 |
$110.00 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,310 | TON |
$125.00 |
$104.65 |
$112.56 |
$127.93 |
$112.00 |
$110.00 |
| 210 | 412 3100 |
COLD MILLING PAVEMENT | 1,334 | SY |
$4.00 |
$5.00 |
$19.86 |
$10.66 |
$10.00 |
$22.00 |
| 220 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 134 | CY |
$35.00 |
$35.00 |
$47.08 |
$77.84 |
$68.00 |
$60.00 |
| 230 | 509(A)0200 |
CLASS AA CONCRETE | 579 | CY |
$800.00 |
$725.00 |
$794.41 |
$820.48 |
$648.00 |
$1,000.00 |
| 240 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 35.56 | CY |
$1,000.00 |
$950.00 |
$1,016.74 |
$900.70 |
$1,000.00 |
$1,500.00 |
| 250 | 509(D)0500 |
CLASS C CONCRETE | 142.65 | CY |
$450.00 |
$448.20 |
$572.26 |
$559.70 |
$490.00 |
$750.00 |
| 260 | 511(A)2200 |
REINFORCING STEEL | 94,318 | LB |
$2.00 |
$1.55 |
$1.28 |
$1.34 |
$1.83 |
$2.00 |
| 270 | 611(G)0354 |
INLET (SMD-TYPE 2) | 1 | EA |
$4,800.00 |
$5,700.00 |
$5,443.49 |
$4,427.22 |
$9,400.00 |
$4,800.00 |
| 280 | 613(A)5208 |
18" R.C.PIPE CLASS III | 200 | LF |
$100.00 |
$52.45 |
$83.57 |
$74.50 |
$61.00 |
$85.00 |
| 290 | 613(A)5216 |
24" R.C.PIPE CLASS III | 1,573 | LF |
$100.00 |
$68.20 |
$95.84 |
$111.68 |
$76.00 |
$105.00 |
| 300 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 108 | LF |
$130.00 |
$84.24 |
$141.84 |
$155.24 |
$134.00 |
$180.00 |
| 310 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 966 | LF |
$25.00 |
$24.00 |
$17.19 |
$24.99 |
$20.00 |
$35.00 |
| 320 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 322 | LF |
$25.00 |
$20.00 |
$23.88 |
$25.74 |
$37.00 |
$35.00 |
| 330 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 3 | EA |
$2,000.00 |
$2,530.00 |
$1,991.60 |
$2,109.63 |
$1,425.00 |
$3,675.00 |
| 340 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 31 | EA |
$2,200.00 |
$3,080.00 |
$3,049.32 |
$2,396.43 |
$1,500.00 |
$4,812.00 |
| 350 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 5 | EA |
$2,600.00 |
$3,100.00 |
$3,483.99 |
$2,513.69 |
$4,640.00 |
$3,256.00 |
| 360 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 27 | EA |
$3,000.00 |
$3,500.00 |
$2,928.95 |
$3,248.33 |
$4,850.00 |
$3,910.00 |
| 370 | 613(R)7600 |
STANDARD BEDDING MATERIAL, CLASS A | 70 | CY |
$70.00 |
$35.00 |
$265.94 |
$78.58 |
$230.00 |
$375.00 |
| 380 | 613(V)8000 |
TRENCH EXCAVATION | 46 | CY |
$16.00 |
$10.00 |
$26.75 |
$35.78 |
$100.00 |
$65.00 |
| 390 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$46,000.00 |
$26,500.00 |
$35,649.83 |
$24,750.00 |
$50,000.00 |
$30,000.00 |
| 400 | 619(B)6300 |
REMOVAL OF HEADWALL | 28 | EA |
$1,300.00 |
$350.00 |
$789.00 |
$1,262.86 |
$550.00 |
$2,500.00 |
| 410 | 619(C)6600 |
SAWING PAVEMENT | 27,187 | LF |
$3.50 |
$2.20 |
$6.62 |
$3.82 |
$3.80 |
$6.50 |
| 420 | 624(A)3200 |
FENCE-STYLE WWF | 104 | LF |
$11.00 |
$11.50 |
$12.04 |
$11.00 |
$23.40 |
$20.72 |
| 430 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 9,928 | LF |
$10.00 |
$6.95 |
$7.28 |
$6.66 |
$8.50 |
$7.06 |
| 440 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,920 | LF |
$10.00 |
$6.95 |
$7.28 |
$6.66 |
$9.60 |
$7.29 |
| 450 | 624(E)3620 |
FENCE-STYLE CLF (6'HIGH, CLASS A) | 243 | LF |
$55.00 |
$39.10 |
$40.93 |
$37.40 |
$37.00 |
$43.06 |
| 460 | 624(F)3763 |
GATES-STYLE CLF (6'HIGH X 11.5'LONG) | 2 | EA |
$2,000.00 |
$1,855.00 |
$1,926.26 |
$1,760.00 |
$1,700.00 |
$2,319.55 |
| 470 | 624(F)3772 |
GATES-STYLE CLF (6'HIGH X 16'LONG) | 1 | EA |
$2,000.00 |
$2,070.00 |
$2,167.04 |
$1,980.00 |
$1,915.00 |
$3,029.10 |
| 480 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 12 | EA |
$230.00 |
$172.00 |
$180.59 |
$165.00 |
$155.00 |
$175.00 |
| 490 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 12 | EA |
$80.00 |
$11.50 |
$12.04 |
$11.00 |
$11.00 |
$12.50 |
| 500 | 629(E)7600 |
MAILBOX | 12 | EA |
$80.00 |
$97.00 |
$102.33 |
$93.50 |
$90.00 |
$100.00 |
| 510 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 27,500 | LF |
$1.00 |
$0.2300 |
$0.2600 |
$0.2400 |
$0.2400 |
$0.5000 |
| 520 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 16,963 | LF |
$0.3600 |
$0.0400 |
$0.0600 |
$0.0600 |
$0.0600 |
$0.3000 |
| 530 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 688 | EA |
$7.92 |
$5.76 |
$6.02 |
$5.50 |
$5.35 |
$18.00 |
| 540 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,680 | SD |
$16.00 |
$11.48 |
$12.04 |
$11.00 |
$10.65 |
$15.50 |
| 550 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 480 | SD |
$25.17 |
$11.45 |
$12.04 |
$11.00 |
$10.65 |
$13.00 |
| 560 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 6,140 | LF |
$25.19 |
$71.19 |
$28.27 |
$31.53 |
$55.50 |
$1.00 |
| 570 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,440 | SD |
$0.4800 |
$2.28 |
$2.41 |
$2.20 |
$2.13 |
$2.40 |
| 580 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,200 | SD |
$0.8200 |
$2.32 |
$2.41 |
$2.20 |
$2.13 |
$4.80 |
| 590 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,160 | SD |
$1.60 |
$2.26 |
$2.41 |
$2.20 |
$2.13 |
$2.40 |
| 600 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,400 | SD |
$1.33 |
$1.14 |
$1.20 |
$1.10 |
$1.07 |
$1.20 |
| 610 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 18,240 | SD |
$0.3500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0600 |
$0.3000 |
| 620 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 68,400 | SD |
$0.2000 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0600 |
$0.1200 |
| 630 | 880(F)6700 |
DRUMS | 39,600 | SD |
$0.2400 |
$0.3400 |
$0.3600 |
$0.3300 |
$0.3200 |
$0.3500 |
| 640 | 880(G)6805 |
CHANNELIZER CONES | 160,320 | SD |
$0.3200 |
$0.3200 |
$0.3600 |
$0.3300 |
$0.3200 |
$0.3500 |
| 650 | 880(I)7000 |
FLAGGER | 240 | SD |
$140.00 |
$35.00 |
$186.81 |
$268.67 |
$325.00 |
$1.00 |
| 660 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,016 | SD |
$17.38 |
$5.75 |
$6.02 |
$5.50 |
$5.33 |
$12.50 |
| 670 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 13,600 | LF |
$1.00 |
$0.3500 |
$0.3600 |
$0.3300 |
$0.3200 |
$0.3900 |
| 680 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 22,667 | LF |
$1.00 |
$0.3200 |
$0.3600 |
$0.3300 |
$0.3200 |
$0.3900 |
| 690 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 22 | EA |
$128.76 |
$28.00 |
$30.10 |
$27.50 |
$26.50 |
$120.00 |
| 700 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 477 | SF |
$37.23 |
$28.85 |
$30.10 |
$27.50 |
$26.50 |
$31.25 |
| 710 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 735 | LF |
$15.61 |
$4.45 |
$4.64 |
$4.24 |
$4.10 |
$13.25 |
| 720 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 49,123 | LF |
$0.7700 |
$0.6900 |
$0.7800 |
$0.7200 |
$0.7000 |
$1.05 |
| 730 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 91 | LF |
$9.60 |
$30.25 |
$30.10 |
$27.50 |
$26.75 |
$28.75 |
| 740 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$107,600.00 |
$35,000.00 |
$25,843.43 |
$21,309.40 |
$100,000.00 |
$50,000.00 |
| 750 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$2,500.00 |
$3,009.78 |
$7,046.55 |
$21,424.18 |
$10,000.00 |
| 760 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$30,000.00 |
$1,203.91 |
$9,600.00 |
$25,000.00 |
$30,000.00 |
| 770 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$297,500.00 |
$290,000.00 |
$184,721.00 |
$256,855.42 |
$350,000.00 |
$350,000.00 |