| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,000.00 |
$500,000.00 |
$146,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 47,621 | CY |
$11.00 |
$10.50 |
$28.50 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 16,943 | CY |
$14.00 |
$11.00 |
$13.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$155,000.00 |
$200,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 9,260 | LF |
$3.00 |
$3.20 |
$5.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 2,086 | LF |
$12.00 |
$13.10 |
$21.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 270,654 | SY |
$3.00 |
$3.10 |
$5.00 |
| 80 | 232(B)9300 |
SEEDING METHOD B | 55.92 | AC |
$900.00 |
$940.00 |
$1,200.00 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 55.92 | AC |
$900.00 |
$1,000.00 |
$2,800.00 |
| 100 | 241 3100 |
MOWING | 111.84 | AC |
$160.00 |
$195.00 |
$450.00 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 102,356 | SY |
$7.00 |
$11.00 |
$6.00 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 128 | TON |
$46.00 |
$240.00 |
$80.00 |
| 130 | 407(B)7300 |
TACK COAT | 16,534 | GAL |
$4.00 |
$4.00 |
$4.00 |
| 140 | 408 8100 |
PRIME COAT | 18,517 | GAL |
$4.24 |
$7.25 |
$5.50 |
| 150 | 409(A)9200 |
FABRIC REINFORCEMENT | 8,504 | SY |
$5.00 |
$5.50 |
$4.00 |
| 160 | 409(B)9300 |
BITUMINOUS BINDER | 1,701 | GAL |
$7.50 |
$9.25 |
$14.00 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 28,036 | TON |
$110.00 |
$114.50 |
$129.00 |
| 180 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,719 | TON |
$125.00 |
$125.00 |
$140.00 |
| 190 | 412 3100 |
COLD MILLING PAVEMENT | 34,678 | SY |
$3.50 |
$3.00 |
$4.00 |
| 200 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 5,902 | SY |
$25.00 |
$29.95 |
$55.00 |
| 210 | 414(E)5600 |
FULL DEPTH P.C.C. PATCH (PLACEMENT) | 4,160 | SY |
$125.00 |
$129.00 |
$90.00 |
| 220 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 2,646 | CY |
$275.00 |
$226.00 |
$210.00 |
| 230 | 415 7100 |
CONCRETE JOINT SEALING | 16,976 | LF |
$1.75 |
$8.00 |
$4.40 |
| 240 | 416 8100 |
DOWEL BAR RETROFIT | 4,500 | EA |
$36.00 |
$75.00 |
$84.00 |
| 250 | 425 0100 |
DIAMOND GRINDING CONCRETE PAVEMENT | 13,417 | SY |
$6.08 |
$6.50 |
$7.00 |
| 260 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 182 | CY |
$32.00 |
$40.00 |
$35.00 |
| 270 | 509(A)0200 |
CLASS AA CONCRETE | 201 | CY |
$700.00 |
$700.00 |
$735.00 |
| 280 | 509(D)0500 |
CLASS C CONCRETE | 1,459 | CY |
$500.00 |
$380.00 |
$395.00 |
| 290 | 511(A)2200 |
REINFORCING STEEL | 29,262 | LB |
$1.40 |
$1.30 |
$2.80 |
| 300 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 80 | TON |
$90.00 |
$59.00 |
$90.00 |
| 310 | 609(B)4310 |
COMBINED CURB & GUTTER(6" BARRIER) | 289 | LF |
$55.00 |
$25.00 |
$65.00 |
| 320 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 951 | SY |
$70.00 |
$74.25 |
$181.00 |
| 330 | 611(G)8020 |
INLET CDI RCB DES. 6 | 1 | EA |
$6,400.00 |
$10,000.00 |
$5,700.00 |
| 340 | 611(G)9012 |
INLET CDI RCP DES. 4 | 1 | EA |
$5,000.00 |
$11,000.00 |
$5,700.00 |
| 350 | 611(H)0692 |
ADD'L DEPTH IN INLET CDI RCP DES. 4 | 0.58 | VF |
$900.00 |
$355.00 |
$100.00 |
| 360 | 613(A)5216 |
24" R.C.PIPE CLASS III | 488 | LF |
$100.00 |
$88.00 |
$64.00 |
| 370 | 613(A)5220 |
30" R.C.PIPE CLASS III | 208 | LF |
$125.00 |
$113.00 |
$84.00 |
| 380 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 64 | LF |
$145.00 |
$125.00 |
$111.00 |
| 390 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 160 | LF |
$165.00 |
$170.00 |
$140.00 |
| 400 | 613(A)5370 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 126 | LF |
$225.00 |
$225.00 |
$228.00 |
| 410 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 732 | LF |
$60.00 |
$50.00 |
$45.00 |
| 420 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 96 | LF |
$70.00 |
$70.00 |
$53.00 |
| 430 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 112 | LF |
$80.00 |
$80.00 |
$64.00 |
| 440 | 613(L)6636 |
36" X 22" PREFAB. CULVERT END SEC., ARCH | 1 | EA |
$2,800.00 |
$2,200.00 |
$2,900.00 |
| 450 | 613(L)6648 |
43" X 26" PREFAB. CULVERT END SEC., ARCH | 1 | EA |
$4,250.00 |
$2,800.00 |
$3,200.00 |
| 460 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,500.00 |
$1,400.00 |
$1,500.00 |
| 470 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 11 | EA |
$1,800.00 |
$2,000.00 |
$1,200.00 |
| 480 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 5 | EA |
$2,100.00 |
$2,500.00 |
$1,700.00 |
| 490 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$3,000.00 |
$2,300.00 |
| 500 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 3 | EA |
$3,250.00 |
$3,500.00 |
$4,600.00 |
| 510 | 613(M)6988 |
TYPE CC4 CULVERT END TREATMENT | 2 | EA |
$4,000.00 |
$3,000.00 |
$5,700.00 |
| 520 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 15 | EA |
$2,000.00 |
$3,000.00 |
$1,700.00 |
| 530 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 5 | EA |
$2,500.00 |
$3,000.00 |
$2,900.00 |
| 540 | 613(M)7012 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$3,000.00 |
$3,000.00 |
$3,400.00 |
| 550 | 613(M)7028 |
TYPE BB6 CULVERT END TREATMENT | 3 | EA |
$4,000.00 |
$3,000.00 |
$7,900.00 |
| 560 | 613(M)7032 |
TYPE CC6 CULVERT END TREATMENT | 2 | EA |
$4,000.00 |
$3,500.00 |
$9,000.00 |
| 570 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$250,000.00 |
$94,425.95 |
| 580 | 619(B)6300 |
REMOVAL OF HEADWALL | 8 | EA |
$1,750.00 |
$2,000.00 |
$1,200.00 |
| 585 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 9,926 | SY |
$8.75 |
$10.00 |
$9.00 |
| 590 | 619(C)6600 |
SAWING PAVEMENT | 14,526 | LF |
$4.00 |
$3.00 |
$3.50 |
| 600 | 624(A)3200 |
FENCE-STYLE WWF | 1,580 | LF |
$9.50 |
$12.25 |
$10.00 |
| 610 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 8,715 | LF |
$9.00 |
$7.25 |
$8.50 |
| 620 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 8,322 | LF |
$9.50 |
$7.25 |
$8.80 |
| 630 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$200.00 |
$225.00 |
$255.00 |
| 640 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$300.00 |
$350.00 |
$395.00 |
| 650 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 9 | EA |
$75.00 |
$65.00 |
$75.00 |
| 660 | 629(E)7600 |
MAILBOX | 9 | EA |
$100.00 |
$40.00 |
$45.00 |
| 670 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 115 | SD |
$250.00 |
$190.00 |
$215.00 |
| 680 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 25,488 | LF |
$0.6000 |
$0.4000 |
$0.4500 |
| 690 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 37,813 | LF |
$0.3500 |
$0.5500 |
$0.6000 |
| 700 | 857(F)9710 |
PAVEMENT MARKING REMOVAL(ARROWS) | 6 | EA |
$32.00 |
$25.00 |
$29.00 |
| 710 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 447 | EA |
$7.00 |
$9.50 |
$11.00 |
| 720 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 214 | EA |
$7.00 |
$9.50 |
$11.00 |
| 730 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 214 | EA |
$7.00 |
$9.50 |
$11.00 |
| 740 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 180 | SD |
$20.00 |
$40.00 |
$45.00 |
| 750 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 140 | SD |
$45.00 |
$12.00 |
$14.00 |
| 760 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,700 | LF |
$30.00 |
$25.00 |
$28.00 |
| 770 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 5,200 | LF |
$5.56 |
$13.00 |
$4.00 |
| 780 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 20 | SD |
$7.50 |
$1.00 |
$5.00 |
| 790 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,170 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
| 800 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,310 | SD |
$0.5000 |
$5.50 |
$7.00 |
| 810 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,720 | SD |
$1.00 |
$0.0500 |
$0.0500 |
| 820 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,180 | SD |
$1.50 |
$3.50 |
$5.00 |
| 830 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 23,690 | SD |
$0.5000 |
$0.0200 |
$0.0500 |
| 840 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 17,280 | SD |
$0.2500 |
$0.7000 |
$1.00 |
| 850 | 880(F)6700 |
DRUMS | 7,880 | SD |
$0.3200 |
$0.0500 |
$0.0500 |
| 860 | 880(G)6805 |
CHANNELIZER CONES | 13,060 | SD |
$0.2500 |
$1.25 |
$2.00 |
| 870 | 880(I)7000 |
FLAGGER | 40 | SD |
$300.00 |
$1,200.00 |
$800.00 |
| 880 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 956 | SD |
$20.00 |
$12.00 |
$14.00 |
| 890 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 20,926 | LF |
$0.3500 |
$0.3000 |
$0.3500 |
| 895 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 34,877 | LF |
$0.3000 |
$0.3000 |
$0.3500 |
| 900 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 60 | EA |
$200.00 |
$85.00 |
$96.00 |
| 920 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 2,250 | SF |
$40.00 |
$19.00 |
$22.00 |
| 930 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 2,088 | SF |
$45.00 |
$22.00 |
$25.00 |
| 940 | 851(A)2215 |
6"@25 GALV.STL.WD.FLANGE BM.POST | 225 | LF |
$75.00 |
$58.00 |
$66.00 |
| 950 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 562.5 | LF |
$7.50 |
$9.00 |
$11.00 |
| 960 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 77,750 | LF |
$1.00 |
$0.8000 |
$0.9000 |
| 970 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 400 | LF |
$3.00 |
$3.70 |
$5.00 |
| 980 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 200 | LF |
$15.00 |
$17.50 |
$20.00 |
| 990 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 20 | EA |
$250.00 |
$550.00 |
$630.00 |
| 1,000 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$65,000.00 |
$150,000.00 |
$80,000.00 |
| 1,010 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$100,000.00 |
$27,000.00 |
| 1,020 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$6,500.00 |
$100,000.00 |
$24,000.00 |
| 1,030 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$455,000.00 |
$595,000.00 |
$645,000.00 |