| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$55,000.00 |
$61,750.00 |
$325,000.00 |
$150,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 24,471 | CY |
$12.00 |
$14.50 |
$19.50 |
$35.00 |
$12.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$105,500.00 |
$12,000.00 |
$120,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,856 | LF |
$5.00 |
$2.52 |
$2.40 |
$2.30 |
$3.00 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 2,457 | LF |
$10.00 |
$14.50 |
$13.90 |
$14.00 |
$12.75 |
| 60 | 221(G)2800 |
TEMPORARY FIBER LOG | 48 | LF |
$10.00 |
$481.15 |
$9.50 |
$10.00 |
$4.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 55,383 | SY |
$5.00 |
$2.79 |
$3.40 |
$2.55 |
$2.50 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 11.49 | AC |
$1,000.00 |
$1,400.00 |
$1,300.00 |
$1,250.00 |
$1,500.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 12,597 | CY |
$65.00 |
$65.55 |
$69.40 |
$55.00 |
$50.00 |
| 100 | 310(B)5300 |
SUBGRADE, METHOD B | 65,476 | SY |
$2.00 |
$1.85 |
$0.9500 |
$1.00 |
$2.50 |
| 110 | 403(A)3200 |
CHIP SEAL (SINGLE TREATMENT) | 34,245 | SY |
$10.00 |
$8.45 |
$2.75 |
$8.00 |
$2.88 |
| 120 | 407(B)7300 |
TACK COAT | 2,582 | GAL |
$4.00 |
$4.50 |
$3.15 |
$4.00 |
$6.87 |
| 130 | 408 8100 |
PRIME COAT | 34,533 | GAL |
$4.00 |
$3.65 |
$5.20 |
$2.00 |
$4.85 |
| 140 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 8,164 | TON |
$110.00 |
$128.88 |
$104.00 |
$85.00 |
$144.35 |
| 150 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,589 | TON |
$120.00 |
$132.00 |
$123.00 |
$105.00 |
$130.71 |
| 160 | 412 3100 |
COLD MILLING PAVEMENT | 15,765 | SY |
$5.00 |
$4.85 |
$6.95 |
$5.00 |
$6.94 |
| 170 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 86 | CY |
$30.00 |
$30.00 |
$54.00 |
$150.00 |
$25.00 |
| 180 | 508 9120 |
PRECAST REINFORCED CONCRETE BOX | 46 | LF |
$950.00 |
$1,255.00 |
$855.00 |
$800.00 |
$4,843.00 |
| 190 | 509(A)0200 |
CLASS AA CONCRETE | 20 | CY |
$850.00 |
$950.00 |
$1,345.00 |
$1,800.00 |
$1,750.00 |
| 200 | 509(B)0300 |
CLASS A CONCRETE | 830 | CY |
$750.00 |
$785.00 |
$929.00 |
$690.00 |
$550.00 |
| 210 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$450.00 |
$720.00 |
$600.00 |
$500.00 |
$750.00 |
| 220 | 511(A)2200 |
REINFORCING STEEL | 2,800 | LB |
$2.00 |
$3.20 |
$1.60 |
$3.00 |
$22.88 |
| 230 | 611(G)0350 |
INLET (SMD-TYPE 1) | 2 | EA |
$4,000.00 |
$6,845.00 |
$5,200.00 |
$5,000.00 |
$15,874.90 |
| 240 | 613(A)5264 |
18" R.C.PIPE CLASS IV | 705 | LF |
$80.00 |
$62.56 |
$86.15 |
$107.00 |
$182.40 |
| 250 | 613(A)5268 |
24" R.C.PIPE CLASS IV | 158 | LF |
$90.00 |
$103.24 |
$97.00 |
$130.00 |
$248.60 |
| 260 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 77 | LF |
$140.00 |
$167.50 |
$150.75 |
$207.00 |
$383.20 |
| 270 | 613(A)5370 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 98 | LF |
$150.00 |
$203.94 |
$161.50 |
$267.00 |
$511.00 |
| 280 | 613(A)5400 |
14" X 23" R.C.PIPE ELL. CLASS HE-III | 450 | LF |
$200.00 |
$112.60 |
$215.25 |
$165.00 |
$254.40 |
| 290 | 613(A)5448 |
51" X 31" R.C.PIPE ARCH CLASS A-IV | 35 | LF |
$130.00 |
$293.25 |
$140.00 |
$277.00 |
$643.00 |
| 300 | 613(L)6636 |
36" X 22" PREFAB. CULVERT END SEC., ARCH | 4 | EA |
$1,200.00 |
$3,320.00 |
$1,290.00 |
$2,500.00 |
$6,544.20 |
| 310 | 613(L)6648 |
43" X 26" PREFAB. CULVERT END SEC., ARCH | 6 | EA |
$1,400.00 |
$5,731.00 |
$1,505.00 |
$3,500.00 |
$9,216.90 |
| 320 | 613(L)6656 |
51" X 31" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,500.00 |
$6,850.00 |
$1,615.00 |
$4,500.00 |
$11,337.20 |
| 330 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,100.00 |
$2,442.00 |
$1,185.00 |
$1,000.00 |
$2,576.40 |
| 340 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 38 | EA |
$2,000.00 |
$980.00 |
$3,175.00 |
$1,400.00 |
$3,947.40 |
| 350 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 3 | EA |
$2,500.00 |
$1,550.00 |
$3,390.00 |
$2,549.95 |
$5,154.00 |
| 360 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$55,000.00 |
$9,020.00 |
$310,000.00 |
$47,898.65 |
| 370 | 619(C)6600 |
SAWING PAVEMENT | 2,195 | LF |
$4.00 |
$3.25 |
$4.30 |
$5.00 |
$6.00 |
| 380 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 18 | EA |
$250.00 |
$280.00 |
$269.25 |
$300.00 |
$1,085.00 |
| 390 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$150.00 |
$392.00 |
$377.00 |
$400.00 |
$350.00 |
| 400 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 375 | SF |
$25.00 |
$33.60 |
$32.30 |
$33.00 |
$30.00 |
| 410 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 600 | LF |
$15.00 |
$12.32 |
$11.85 |
$12.00 |
$11.00 |
| 420 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 180 | LF |
$18.00 |
$13.25 |
$12.90 |
$13.00 |
$12.00 |
| 430 | 856(A)8201 |
(SP) TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 61,882 | LF |
$1.00 |
$0.5900 |
$0.6000 |
$0.6000 |
$0.5700 |
| 440 | 856(B)8310 |
(SP) TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 28 | EA |
$350.00 |
$1,620.00 |
$1,670.00 |
$1,600.00 |
$1,550.00 |
| 450 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 11,700 | SD |
$1.00 |
$0.2800 |
$0.2500 |
$0.3000 |
$0.2500 |
| 460 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 8,400 | SD |
$1.50 |
$0.5100 |
$0.5000 |
$0.5500 |
$0.5000 |
| 470 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,000 | SD |
$2.00 |
$1.65 |
$1.50 |
$1.60 |
$1.50 |
| 480 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 8,400 | SD |
$1.00 |
$1.10 |
$1.05 |
$1.10 |
$1.00 |
| 490 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 16,800 | SD |
$0.2500 |
$0.4900 |
$0.5000 |
$0.5500 |
$0.5000 |
| 500 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 600 | SD |
$20.00 |
$16.95 |
$15.25 |
$20.00 |
$15.00 |
| 510 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$25,000.00 |
$41,300.00 |
$156,000.00 |
$27,500.00 |
| 520 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$22,500.00 |
$12,000.00 |
$65,250.00 |
| 530 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$241,000.00 |
$225,000.00 |
$255,169.50 |
$280,000.00 |
$985,000.00 |