| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$58,300.00 |
$50,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 17,995 | CY |
$10.00 |
$9.00 |
$15.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 123,020 | CY |
$11.00 |
$10.85 |
$22.50 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$75,000.00 |
$79,500.00 |
$75,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 33,300 | LF |
$3.50 |
$3.20 |
$3.75 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 3,610 | LF |
$19.00 |
$12.85 |
$15.00 |
| 70 | 221(G)2800 |
TEMPORARY FIBER LOG | 655 | LF |
$40.00 |
$7.90 |
$9.15 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 154,590 | SY |
$3.25 |
$3.50 |
$4.05 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 35 | AC |
$1,500.00 |
$948.70 |
$1,102.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 35 | AC |
$2,500.00 |
$948.70 |
$1,102.00 |
| 110 | 241 3100 |
MOWING | 330 | AC |
$350.00 |
$365.70 |
$424.50 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 87,505 | SY |
$12.00 |
$8.50 |
$13.60 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,280 | TON |
$100.00 |
$82.70 |
$96.60 |
| 140 | 407(B)7300 |
TACK COAT | 56,070 | GAL |
$6.00 |
$4.80 |
$3.65 |
| 150 | 408 8100 |
PRIME COAT | 33,805 | GAL |
$5.00 |
$4.80 |
$4.00 |
| 160 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 32,130 | TON |
$130.00 |
$102.25 |
$145.00 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 41,840 | TON |
$125.00 |
$91.65 |
$142.75 |
| 180 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 23,400 | TON |
$150.00 |
$118.75 |
$161.50 |
| 190 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 11,770 | TON |
$140.00 |
$102.45 |
$155.00 |
| 200 | 411(D)1530 |
SUPERPAVE, TYPE S5(PG 64-22 OK) | 2,270 | TON |
$120.00 |
$104.15 |
$168.50 |
| 210 | 411(J)2100 |
(SP) RICH INTERMEDIATE LAYER | 15,020 | TON |
$165.00 |
$131.45 |
$186.00 |
| 220 | 412 3100 |
COLD MILLING PAVEMENT | 227,910 | SY |
$4.00 |
$4.15 |
$5.45 |
| 230 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 250 | CY |
$40.00 |
$47.70 |
$55.40 |
| 240 | 509(A)0200 |
CLASS AA CONCRETE | 415 | CY |
$700.00 |
$702.40 |
$1,132.00 |
| 250 | 509(D)0500 |
CLASS C CONCRETE | 400 | CY |
$400.00 |
$492.90 |
$637.00 |
| 260 | 511(A)2200 |
REINFORCING STEEL | 50,205 | LB |
$1.50 |
$1.45 |
$1.70 |
| 270 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 450 | TON |
$50.00 |
$70.00 |
$116.50 |
| 280 | 611(G)0362 |
INLET (SMD-TYPE 2B) | 4 | EA |
$7,000.00 |
$7,102.00 |
$8,247.00 |
| 290 | 611(L)1600 |
JUNCTION BOXES | 226 | CF |
$130.00 |
$142.00 |
$165.00 |
| 300 | 613(A)5208 |
18" R.C.PIPE CLASS III | 64 | LF |
$107.00 |
$164.30 |
$191.00 |
| 310 | 613(A)5216 |
24" R.C.PIPE CLASS III | 1,064 | LF |
$115.00 |
$188.70 |
$219.00 |
| 320 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 100 | LF |
$170.00 |
$238.50 |
$277.00 |
| 330 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 894 | LF |
$60.00 |
$74.20 |
$86.20 |
| 340 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 892 | LF |
$72.00 |
$93.30 |
$108.50 |
| 350 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 60 | LF |
$80.00 |
$127.20 |
$147.50 |
| 360 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 868 | LF |
$75.00 |
$92.25 |
$107.00 |
| 370 | 613(B)5616 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 288 | LF |
$120.00 |
$121.90 |
$141.50 |
| 380 | 613(B)5620 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 116 | LF |
$122.00 |
$148.40 |
$172.50 |
| 390 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,000.00 |
$2,226.00 |
$2,585.00 |
| 400 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 8 | EA |
$1,150.00 |
$2,862.00 |
$3,570.00 |
| 410 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 8 | EA |
$2,000.00 |
$2,120.00 |
$2,191.00 |
| 420 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 29 | EA |
$2,200.00 |
$2,332.00 |
$2,542.00 |
| 430 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 1 | EA |
$2,750.00 |
$2,650.00 |
$3,822.00 |
| 440 | 613(M)6972 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$3,180.00 |
$4,437.00 |
| 450 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 3 | EA |
$3,200.00 |
$3,180.00 |
$4,089.00 |
| 460 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 12 | EA |
$2,500.00 |
$3,180.00 |
$3,151.00 |
| 470 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 29 | EA |
$2,750.00 |
$3,392.00 |
$3,496.00 |
| 480 | 613(M)7012 |
TYPE C6 CULVERT END TREATMENT | 6 | EA |
$4,500.00 |
$3,710.00 |
$5,287.00 |
| 490 | 613(M)7016 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$4,500.00 |
$4,240.00 |
$6,530.00 |
| 500 | 613(M)7028 |
TYPE BB6 CULVERT END TREATMENT | 3 | EA |
$6,000.00 |
$5,300.00 |
$5,951.00 |
| 510 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$4.50 |
$68,900.00 |
$84,320.00 |
| 520 | 619(B)6300 |
REMOVAL OF HEADWALL | 23 | EA |
$1,750.00 |
$2,120.00 |
$2,462.00 |
| 530 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 12,020 | SY |
$15.00 |
$12.75 |
$25.70 |
| 540 | 619(B)6376 |
REMOVAL OF CONC.PAV.W/ASPH.OVERLAY | 16,310 | SY |
$13.00 |
$15.90 |
$32.60 |
| 550 | 619(C)6600 |
SAWING PAVEMENT | 23,070 | LF |
$4.50 |
$2.65 |
$4.65 |
| 560 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,785 | LF |
$12.50 |
$8.63 |
$9.85 |
| 570 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 10 | EA |
$300.00 |
$238.50 |
$274.00 |
| 580 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$450.00 |
$291.50 |
$335.00 |
| 590 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 11 | EA |
$100.00 |
$68.90 |
$79.20 |
| 600 | 629(E)7600 |
MAILBOX | 12 | EA |
$400.00 |
$42.40 |
$48.80 |
| 610 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 5,270 | CY |
$15.00 |
$12.75 |
$14.50 |
| 620 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 2,880 | CY |
$25.00 |
$47.75 |
$61.40 |
| 630 | 509(A)0210 |
CLASS AA CONCRETE | 315.8 | CY |
$750.00 |
$723.50 |
$1,060.00 |
| 640 | 511(A)2210 |
REINFORCING STEEL | 53,800 | LB |
$1.35 |
$1.45 |
$1.70 |
| 650 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$5,000.00 |
$8,480.00 |
$25,000.00 |
| 660 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$35,000.00 |
$42,400.00 |
$65,000.00 |
| 670 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 208,332 | LF |
$1.00 |
$0.3100 |
$0.2600 |
| 680 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 71,534 | LF |
$2.00 |
$0.1200 |
$0.1300 |
| 690 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 2,787 | EA |
$7.00 |
$6.05 |
$6.95 |
| 700 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 2,787 | EA |
$7.00 |
$6.05 |
$6.95 |
| 710 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 500 | SD |
$20.00 |
$12.20 |
$14.00 |
| 720 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 400 | SD |
$20.00 |
$12.20 |
$14.00 |
| 730 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 200 | LF |
$30.00 |
$23.85 |
$27.40 |
| 740 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,000 | LF |
$10.00 |
$4.25 |
$4.85 |
| 750 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 1,000 | SD |
$15.00 |
$1.05 |
$1.20 |
| 760 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,000 | SD |
$0.5000 |
$0.0500 |
$0.0600 |
| 770 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,000 | SD |
$0.7500 |
$6.40 |
$7.30 |
| 780 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 16,160 | SD |
$1.00 |
$0.1600 |
$0.1800 |
| 790 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 15,500 | SD |
$2.00 |
$0.6000 |
$0.6700 |
| 800 | 880(D)6500 |
VERTICAL PANELS | 89,580 | SD |
$0.7500 |
$0.0200 |
$0.0200 |
| 810 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 51,920 | SD |
$1.00 |
$0.8500 |
$0.9700 |
| 820 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 152,590 | SD |
$1.00 |
$0.0200 |
$0.0200 |
| 830 | 880(F)6700 |
DRUMS | 61,540 | SD |
$0.5000 |
$0.0200 |
$0.0200 |
| 840 | 880(G)6800 |
TUBE CHANNELIZERS | 40,600 | SD |
$0.5000 |
$1.30 |
$1.45 |
| 850 | 880(G)6805 |
CHANNELIZER CONES | 70,270 | SD |
$0.2500 |
$0.0200 |
$0.0200 |
| 860 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,028 | SD |
$25.00 |
$15.90 |
$18.30 |
| 870 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 60,000 | LF |
$1.00 |
$0.3000 |
$0.2200 |
| 880 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 50,000 | LF |
$1.00 |
$0.3000 |
$0.2200 |
| 890 | 804(A)2200 |
STRUCTURAL CONCRETE | 19 | CY |
$1,200.00 |
$636.00 |
$731.00 |
| 900 | 804(B)2300 |
REINFORCING STEEL | 2,630 | LB |
$4.50 |
$3.20 |
$3.65 |
| 910 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 180 | EA |
$200.00 |
$47.70 |
$54.80 |
| 920 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$400.00 |
$1,272.00 |
$1,462.00 |
| 930 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 3,530 | SF |
$60.00 |
$50.00 |
$57.30 |
| 940 | 851(B)2315 |
3"@7.58 GALV.STL.PIPE POST | 1,360 | LF |
$40.00 |
$29.75 |
$34.10 |
| 950 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 4,630 | LF |
$20.00 |
$10.60 |
$12.20 |
| 955 | 856(A)8205 |
TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 170,810 | LF |
$1.00 |
$0.7000 |
$0.6800 |
| 970 | 856(A)8213 |
TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 2,800 | LF |
$2.00 |
$1.20 |
$1.35 |
| 980 | 856(A)8217 |
TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 378 | LF |
$3.00 |
$7.40 |
$8.55 |
| 995 | 856(B)8301 |
TRAF.STR.(PLURAL-COMPONENT)(SYM,WRD,ETC) | 78 | EA |
$250.00 |
$856.60 |
$987.00 |
| 1,000 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$250,000.00 |
$120,204.00 |
$180,940.00 |
| 1,010 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$15,565.00 |
$15,000.00 |
| 1,020 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$12,450.00 |
$35,000.00 |
| 1,030 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$1,200,000.00 |
|
|