| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$8,250.00 |
$13,644.41 |
$62,500.00 |
$26,600.00 |
$12,000.00 |
$10,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,454 | CY |
$12.00 |
$8.78 |
$17.01 |
$18.00 |
$13.60 |
$14.00 |
$12.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 587 | CY |
$12.00 |
$10.39 |
$15.47 |
$22.00 |
$32.60 |
$15.00 |
$10.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,000.00 |
$7,375.00 |
$16,013.85 |
$11,500.00 |
$23,390.00 |
$6,800.00 |
$4,500.00 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 294 | LF |
$19.00 |
$12.25 |
$14.56 |
$12.00 |
$12.60 |
$16.00 |
$13.00 |
| 60 | 221(F)2720 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 68 | CY |
$150.00 |
$141.00 |
$92.58 |
$120.00 |
$362.00 |
$118.00 |
$170.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 5,484 | SY |
$4.50 |
$4.49 |
$4.58 |
$4.00 |
$3.95 |
$4.57 |
$4.30 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 1.58 | AC |
$1,750.00 |
$150.00 |
$2,188.13 |
$900.00 |
$1,887.00 |
$1,800.00 |
$1,965.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 207 | CY |
$100.00 |
$74.21 |
$75.68 |
$75.00 |
$112.50 |
$94.00 |
$78.00 |
| 100 | 307(K)4200 |
STABILIZED SUBGRADE | 1,393 | SY |
$10.00 |
$29.00 |
$8.26 |
$12.50 |
$13.90 |
$14.00 |
$13.20 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 382 | TON |
$50.00 |
$39.00 |
$35.50 |
$50.00 |
$67.60 |
$49.00 |
$39.00 |
| 120 | 408 8100 |
PRIME COAT | 817 | GAL |
$6.50 |
$3.00 |
$8.39 |
$3.30 |
$0.2500 |
$4.00 |
$3.30 |
| 130 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 242 | TON |
$135.00 |
$155.25 |
$115.76 |
$140.00 |
$170.50 |
$190.00 |
$210.00 |
| 140 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 117 | TON |
$145.00 |
$205.85 |
$124.66 |
$185.00 |
$279.00 |
$293.47 |
$259.00 |
| 150 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$450.00 |
$300.00 |
$494.57 |
$1,500.00 |
$1,195.00 |
$325.00 |
$330.00 |
| 160 | 602(B)2310 |
REVETMENT MATTRESSES | 633 | SY |
$60.00 |
$55.00 |
$65.20 |
$70.00 |
$70.30 |
$57.20 |
$79.00 |
| 170 | 613(B)5552 |
72" CORR. GALV. STEEL PIPE | 86 | LF |
$200.00 |
$155.00 |
$342.94 |
$241.25 |
$95.75 |
$237.50 |
$210.00 |
| 180 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 32 | LF |
$65.00 |
$48.00 |
$86.65 |
$114.00 |
$56.90 |
$82.00 |
$45.00 |
| 190 | 613(P)7450 |
21" X 15" GALV. STEEL CULV. END SEC.ARCH | 2 | EA |
$500.00 |
$313.00 |
$746.16 |
$901.75 |
$599.00 |
$1,250.00 |
$325.00 |
| 200 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$5,550.00 |
$10,917.50 |
$8,500.00 |
$26,585.00 |
$6,500.00 |
$10,000.00 |
| 210 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 694 | SY |
$10.00 |
$5.12 |
$21.02 |
$12.50 |
$19.10 |
$14.00 |
$11.50 |
| 220 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 539 | LF |
$9.00 |
$22.00 |
$9.78 |
$20.00 |
$15.20 |
$18.20 |
$22.00 |
| 230 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 1,600 | CY |
$25.00 |
$10.78 |
$12.41 |
$25.00 |
$12.70 |
$14.00 |
$25.00 |
| 240 | 501(D)1500 |
UNCLASSIFIED BACKFILL | 780 | CY |
$60.00 |
$17.14 |
$89.47 |
$20.00 |
$41.40 |
$102.00 |
$63.00 |
| 250 | 508 9140 |
PREFABRICATED METAL ARCH CULVERT | 55 | LF |
$7,000.00 |
$5,370.00 |
$5,171.93 |
$4,805.00 |
$5,045.00 |
$6,789.00 |
$8,008.00 |
| 260 | 509(B)0320 |
CLASS A CONCRETE | 121.4 | CY |
$750.00 |
$982.50 |
$575.21 |
$485.00 |
$886.50 |
$870.00 |
$780.00 |
| 270 | 511(A)2210 |
REINFORCING STEEL | 12,160 | LB |
$2.00 |
$1.50 |
$1.77 |
$1.50 |
$2.75 |
$1.51 |
$1.15 |
| 280 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 2,114 | LF |
$60.00 |
$48.00 |
$49.27 |
$60.00 |
$57.30 |
$45.15 |
$40.00 |
| 290 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 2,114 | LF |
$20.00 |
$12.00 |
$12.48 |
$26.83 |
$23.20 |
$24.40 |
$20.00 |
| 300 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 310 | 602(B)2320 |
REVETMENT MATTRESS | 1,205 | SY |
$60.00 |
$55.00 |
$59.49 |
$70.00 |
$74.90 |
$57.00 |
$79.00 |
| 320 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 164 | LF |
$40.00 |
$40.00 |
$10.75 |
$22.50 |
$66.40 |
$45.00 |
$42.00 |
| 330 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$40.00 |
$47.00 |
$12.15 |
$28.75 |
$41.70 |
$40.00 |
$45.00 |
| 340 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$13,750.00 |
$8,615.02 |
$15,000.00 |
$21,160.00 |
$12,000.00 |
$15,000.00 |
| 350 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 207 | SD |
$0.7500 |
$12.00 |
$5.52 |
$4.50 |
$4.75 |
$2.90 |
$5.00 |
| 360 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,863 | SD |
$1.00 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.1200 |
$0.0200 |
| 370 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 414 | SD |
$1.50 |
$8.00 |
$4.90 |
$4.00 |
$4.25 |
$5.60 |
$4.40 |
| 380 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 828 | SD |
$1.25 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
$3.35 |
$0.0200 |
| 390 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,070 | SD |
$1.50 |
$0.5500 |
$0.6100 |
$0.5000 |
$0.5300 |
$0.5600 |
$0.5500 |
| 400 | 882(A)8200 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$30,000.00 |
$18,000.00 |
$21,820.02 |
$17,800.00 |
$18,815.00 |
$21,500.00 |
$19,600.00 |
| 410 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$7,250.00 |
$10,572.72 |
$10,000.00 |
$17,445.00 |
$9,500.00 |
$6,200.00 |
| 420 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$90,400.00 |
$63,250.00 |
$65,226.51 |
$85,000.00 |
$51,320.91 |
$76,000.00 |
$70,000.00 |