| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$15,307.87 |
$6,500.00 |
$375,000.00 |
$20,011.54 |
$200,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 11,322 | CY |
$15.00 |
$6.03 |
$15.00 |
$11.00 |
$18.50 |
$37.22 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 9,568 | CY |
$15.00 |
$18.95 |
$22.00 |
$21.00 |
$20.21 |
$50.15 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$63,792.49 |
$6,600.00 |
$17,500.00 |
$15,701.01 |
$31,096.98 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,884 | LF |
$10.00 |
$3.62 |
$4.26 |
$3.50 |
$3.31 |
$11.04 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 13 | EA |
$300.00 |
$343.42 |
$426.00 |
$300.00 |
$313.67 |
$410.83 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 245 | LF |
$15.00 |
$12.54 |
$14.91 |
$12.00 |
$11.45 |
$19.06 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 14,351 | SY |
$5.00 |
$3.20 |
$4.26 |
$3.50 |
$2.92 |
$4.39 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 17.08 | AC |
$1,500.00 |
$932.82 |
$1,331.25 |
$1,000.00 |
$852.02 |
$6,162.47 |
| 100 | 241 3100 |
MOWING | 6 | AC |
$1,000.00 |
$291.14 |
$213.00 |
$275.00 |
$265.92 |
$1,173.80 |
| 110 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 8 | EA |
$5,000.00 |
$3,558.01 |
$2,200.00 |
$5,645.36 |
$8,317.83 |
$18,552.66 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 70,503 | SY |
$5.00 |
$5.91 |
$5.00 |
$6.00 |
$6.08 |
$5.97 |
| 130 | 317 7100 |
CEMENT TREATED BASE | 70,503 | SY |
$7.00 |
$26.51 |
$17.00 |
$28.00 |
$24.61 |
$41.39 |
| 150 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 48 | TON |
$200.00 |
$172.19 |
$426.00 |
$385.00 |
$219.42 |
$541.42 |
| 160 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 28,871 | SY |
$35.00 |
$10.79 |
$18.00 |
$15.00 |
$23.85 |
$36.28 |
| 170 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 36,190 | SY |
$45.00 |
$19.83 |
$30.00 |
$19.50 |
$25.85 |
$51.26 |
| 180 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 18,075 | CY |
$260.00 |
$204.34 |
$205.00 |
$237.00 |
$232.68 |
$319.78 |
| 190 | 501(G)1810 |
CLSM BACKFILL | 61 | CY |
$350.00 |
$284.62 |
$255.81 |
$285.00 |
$300.11 |
$466.51 |
| 200 | 504(E)5520 |
42" F-SHAPED PARAPET | 4,641 | LF |
$200.00 |
$66.28 |
$146.73 |
$80.00 |
$159.15 |
$158.80 |
| 210 | 509(A)0200 |
CLASS AA CONCRETE | 1,165 | CY |
$950.00 |
$356.54 |
$889.28 |
$405.00 |
$666.29 |
$575.23 |
| 220 | 509(B)0300 |
CLASS A CONCRETE | 1,433 | CY |
$750.00 |
$351.98 |
$729.53 |
$500.00 |
$682.38 |
$909.53 |
| 230 | 509(D)0500 |
CLASS C CONCRETE | 242 | CY |
$450.00 |
$369.49 |
$622.49 |
$415.00 |
$666.95 |
$399.58 |
| 240 | 510(B)1310 |
SOUND BARRIER WALL | 820 | SY |
$950.00 |
$555.45 |
$428.34 |
$675.00 |
$300.81 |
$816.06 |
| 250 | 511(A)2200 |
REINFORCING STEEL | 27,220 | LB |
$1.00 |
$1.55 |
$1.25 |
$1.65 |
$1.72 |
$3.77 |
| 260 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 210,790 | LB |
$2.00 |
$1.39 |
$1.32 |
$1.50 |
$1.59 |
$2.28 |
| 270 | 514(J)6100 |
TEMPORARY SHEET PILING | 1 | LSUM |
$5,000.00 |
$169,878.34 |
$16,368.50 |
$25,893.33 |
$85,781.11 |
$131,715.90 |
| 280 | 516(A)8210 |
DRILLED SHAFTS 24" DIAMETER | 852 | LF |
$600.00 |
$238.13 |
$202.35 |
$650.00 |
$175.22 |
$270.95 |
| 290 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 28 | TON |
$60.00 |
$83.51 |
$81.58 |
$130.00 |
$109.38 |
$162.32 |
| 300 | 610(C)5400 |
4" CONCRETE DIVIDING STRIP | 719 | SY |
$70.00 |
$41.31 |
$83.07 |
$62.50 |
$129.34 |
$139.60 |
| 310 | 611(A)7211 |
(PL) MANHOLE (4' DIA.) | 3 | EA |
$3,500.00 |
$6,535.70 |
$3,779.36 |
$4,450.00 |
$3,301.53 |
$3,410.52 |
| 320 | 611(A)7231 |
(PL) MANHOLE (8' DIA.) | 1 | EA |
$8,000.00 |
$29,707.73 |
$14,995.78 |
$15,500.00 |
$10,168.60 |
$15,815.30 |
| 330 | 611(B)7301 |
(PL) ADD'L.DEPTH IN MANHOLE (4' DIA.) | 1 | VF |
$100.00 |
$594.15 |
$282.41 |
$200.00 |
$557.67 |
$163.00 |
| 340 | 611(B)7321 |
(PL) ADD'L.DEPTH IN MANHOLE (8' DIA.) | 10 | VF |
$300.00 |
$950.65 |
$1,402.21 |
$1,300.00 |
$952.69 |
$1,017.00 |
| 360 | 611(G)8175 |
INLET - LONG. BARRIER - TYPE II, DES.2 | 2 | EA |
$4,000.00 |
$6,535.70 |
$8,312.36 |
$7,750.00 |
$8,145.24 |
$7,485.25 |
| 370 | 613(A)5208 |
18" R.C.PIPE CLASS III | 12 | LF |
$80.00 |
$178.25 |
$165.21 |
$165.00 |
$84.29 |
$326.51 |
| 380 | 613(A)5216 |
24" R.C.PIPE CLASS III | 247 | LF |
$95.00 |
$297.08 |
$202.64 |
$75.00 |
$99.86 |
$342.86 |
| 390 | 613(A)5232 |
48" R.C.PIPE CLASS III | 7 | LF |
$350.00 |
$1,188.31 |
$826.00 |
$500.00 |
$210.95 |
$711.46 |
| 400 | 613(A)5236 |
54" R.C.PIPE CLASS III | 10 | LF |
$400.00 |
$1,485.39 |
$846.31 |
$460.00 |
$267.59 |
$746.31 |
| 401 | 613(S)7700 |
STANDARD BEDDING MATERIAL, CLASS B | 117 | CY |
$45.00 |
$118.83 |
$293.03 |
$125.00 |
$79.77 |
$105.04 |
| 402 | 613(V)8000 |
TRENCH EXCAVATION | 176 | CY |
$25.00 |
$59.42 |
$43.66 |
$17.75 |
$24.75 |
$1.00 |
| 420 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$40,310.89 |
$15,000.00 |
$17,600.00 |
$30,112.29 |
$125,000.00 |
| 430 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 14,929 | SY |
$10.00 |
$8.19 |
$9.00 |
$17.00 |
$13.27 |
$12.28 |
| 440 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 11,562 | SY |
$8.00 |
$8.49 |
$7.00 |
$4.00 |
$5.91 |
$5.28 |
| 450 | 619(B)6368 |
REMOVAL OF DRAINAGE INLETS | 8 | EA |
$1,000.00 |
$668.21 |
$871.91 |
$575.00 |
$567.96 |
$1,519.20 |
| 460 | 619(B)6372 |
REMOVAL OF MANHOLES | 1 | EA |
$2,000.00 |
$2,038.79 |
$1,647.38 |
$1,700.00 |
$1,672.93 |
$1,519.20 |
| 470 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,086 | LF |
$5.00 |
$5.94 |
$5.33 |
$6.75 |
$7.16 |
$9.68 |
| 480 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 11,666 | LF |
$4.00 |
$2.93 |
$5.33 |
$2.00 |
$2.01 |
$5.28 |
| 490 | 619(C)6600 |
SAWING PAVEMENT | 30,478 | LF |
$5.00 |
$6.54 |
$3.42 |
$3.25 |
$4.59 |
$2.98 |
| 500 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 625 | LF |
$30.00 |
$47.53 |
$42.60 |
$24.00 |
$24.95 |
$33.73 |
| 510 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$3,000.00 |
$1,188.31 |
$1,065.00 |
$1,200.00 |
$1,248.18 |
$1,687.34 |
| 520 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 1 | EA |
$4,000.00 |
$3,564.93 |
$3,195.00 |
$3,650.00 |
$3,798.82 |
$5,135.39 |
| 530 | 623(I)2030 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 1 | EA |
$3,800.00 |
$1,188.31 |
$1,065.00 |
$1,525.00 |
$1,573.80 |
$2,127.52 |
| 540 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 1 | EA |
$4,000.00 |
$3,564.93 |
$3,195.00 |
$3,650.00 |
$3,794.48 |
$5,129.52 |
| 550 | 627(A)6200 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 10,922 | LF |
$85.00 |
$78.75 |
$74.51 |
$66.00 |
$114.94 |
$102.83 |
| 560 | 853 5130 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) | 8 | EA |
$75.00 |
$237.66 |
$213.00 |
$85.00 |
$91.01 |
$118.85 |
| 570 | 853 5160 |
BARRIER DELINEATORS(TYPE 1, CODE 1) | 55 | EA |
$15.00 |
$38.03 |
$34.08 |
$33.00 |
$35.95 |
$46.95 |
| 580 | 853 5165 |
BARRIER DELINEATORS(TYPE 2, CODE 1) | 237 | EA |
$15.00 |
$38.03 |
$34.08 |
$33.00 |
$35.95 |
$46.95 |
| 590 | 871(A)2210 |
(PL) IMPACT ATTENUATOR | 1 | EA |
$10,000.00 |
$33,866.81 |
$30,352.50 |
$32,500.00 |
$33,931.88 |
$47,621.56 |
| 600 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 930 | SD |
$15.00 |
$11.88 |
$10.65 |
$18.00 |
$19.10 |
$24.94 |
| 610 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 28,020 | LF |
$25.00 |
$30.58 |
$55.00 |
$46.00 |
$54.71 |
$98.06 |
| 620 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,295 | LF |
$6.00 |
$11.85 |
$5.15 |
$1.60 |
$22.67 |
$5.85 |
| 630 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 60 | SD |
$5.00 |
$29.71 |
$26.63 |
$0.9500 |
$1.01 |
$1.32 |
| 640 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,920 | SD |
$1.00 |
$0.5900 |
$0.5300 |
$0.0500 |
$0.0200 |
$0.0300 |
| 650 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,860 | SD |
$2.00 |
$5.94 |
$5.50 |
$6.25 |
$6.74 |
$8.80 |
| 660 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,570 | SD |
$3.00 |
$5.94 |
$5.50 |
$0.7500 |
$0.7900 |
$1.03 |
| 670 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 120 | SD |
$2.00 |
$2.38 |
$2.50 |
$0.0500 |
$0.0200 |
$0.0300 |
| 680 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 1,410 | SD |
$0.5000 |
$1.19 |
$1.07 |
$4.20 |
$4.49 |
$5.87 |
| 690 | 880(F)6700 |
DRUMS | 3,630 | SD |
$0.5000 |
$1.19 |
$1.07 |
$1.20 |
$1.24 |
$1.61 |
| 700 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 800 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 710 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 892 | SD |
$25.00 |
$29.71 |
$26.63 |
$9.50 |
$10.11 |
$13.21 |
| 720 | 804(A)2200 |
STRUCTURAL CONCRETE | 44 | CY |
$1,200.00 |
$3,475.80 |
$1,065.00 |
$450.00 |
$466.28 |
$608.91 |
| 730 | 804(B)2300 |
REINFORCING STEEL | 3,438 | LB |
$2.00 |
$11.70 |
$4.26 |
$2.40 |
$2.53 |
$3.30 |
| 740 | 805(A)3236 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE | 1 | EA |
$10,000.00 |
$8,912.32 |
$7,987.50 |
$15,000.00 |
$15,730.01 |
$20,541.55 |
| 750 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 21 | EA |
$250.00 |
$118.83 |
$532.50 |
$375.00 |
$393.25 |
$513.54 |
| 760 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 101 | SF |
$50.00 |
$29.71 |
$31.95 |
$26.00 |
$28.09 |
$36.68 |
| 770 | 850(B)1320 |
EXTR.ALUM.PAN.SGN.(OVRHD SIGNS) | 854 | SF |
$50.00 |
$57.04 |
$47.93 |
$36.50 |
$39.33 |
$51.35 |
| 780 | 852(B)3300 |
GALV.STEEL OVERHEAD SIGN STRUCTURE | 75 | LF |
$400.00 |
$2,138.96 |
$1,011.75 |
$2,500.00 |
$2,494.33 |
$3,257.30 |
| 790 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 93,491 | LF |
$1.50 |
$0.7700 |
$0.6900 |
$1.65 |
$1.69 |
$2.20 |
| 800 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 6,489 | LF |
$2.00 |
$2.38 |
$2.13 |
$2.00 |
$2.08 |
$2.71 |
| 810 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 4,910 | LF |
$3.00 |
$3.56 |
$3.20 |
$10.00 |
$10.11 |
$13.21 |
| 820 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 9 | EA |
$300.00 |
$594.15 |
$532.50 |
$825.00 |
$870.77 |
$1,137.12 |
| 830 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 62,378 | LF |
$1.00 |
$0.5300 |
$0.4800 |
$0.2000 |
$0.2000 |
$0.2600 |
| 840 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 81,000 | LF |
$0.5000 |
$0.4200 |
$0.3700 |
$0.4500 |
$0.4600 |
$0.6000 |
| 850 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 350 | LF |
$30.00 |
$40.40 |
$39.23 |
$36.00 |
$37.27 |
$49.89 |
| 860 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 505 | LF |
$15.00 |
$24.95 |
$24.23 |
$22.00 |
$23.02 |
$30.81 |
| 870 | 802(C)0430 |
2" HIGH DENSITY PE PIPE - TRENCHED | 13,375 | LF |
$18.00 |
$8.32 |
$8.07 |
$7.25 |
$7.67 |
$10.27 |
| 880 | 803(A)1200 |
PULL BOX | 64 | EA |
$1,800.00 |
$1,990.42 |
$1,932.79 |
$1,750.00 |
$1,836.19 |
$2,457.65 |
| 890 | 803(A)1210 |
PULL BOX(SIZE I) | 4 | EA |
$1,500.00 |
$1,592.34 |
$1,546.24 |
$1,400.00 |
$1,468.95 |
$1,966.12 |
| 900 | 806(C)4524 |
40' MHP & TWIN H.L.MST.ARM(G.STL.) | 56 | EA |
$5,500.00 |
$5,050.31 |
$4,904.11 |
$4,750.00 |
$4,658.98 |
$6,235.83 |
| 910 | 809(A)7200 |
ROADWAY LUMINAIRE | 112 | EA |
$1,600.00 |
$2,222.14 |
$2,157.81 |
$2,000.00 |
$2,049.95 |
$2,743.76 |
| 920 | 810(A)8200 |
SERVICE POLE | 2 | EA |
$6,500.00 |
$10,397.71 |
$10,096.71 |
$9,250.00 |
$9,592.02 |
$12,838.47 |
| 930 | 811 9115 |
1/C NO.4 ELECT.COND. | 40,625 | LF |
$5.00 |
$1.19 |
$1.15 |
$1.05 |
$1.10 |
$1.47 |
| 940 | 811 9135 |
1/C NO.12 ELECT.COND. | 5,600 | LF |
$2.00 |
$1.43 |
$1.38 |
$1.25 |
$1.32 |
$1.76 |
| 950 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$47,452.09 |
$98,445.00 |
$105,000.00 |
$105,905.61 |
$100,000.00 |
| 960 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,970.77 |
$8,300.00 |
$7,500.00 |
$12,975.10 |
$4,401.76 |
| 970 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$4,159.08 |
$13,993.00 |
$40,000.00 |
$15,193.21 |
$39,304.78 |
| 980 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$700,000.00 |
$480,346.85 |
$723,000.00 |
$729,960.00 |
$788,870.15 |
|