| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,000.00 |
$15,000.00 |
$10,000.00 |
$14,500.00 |
$19,500.00 |
$8,072.21 |
$25,320.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,308 | CY |
$11.00 |
$9.25 |
$12.00 |
$9.75 |
$12.00 |
$14.71 |
$16.20 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 2,471 | CY |
$13.00 |
$11.08 |
$12.00 |
$14.50 |
$15.00 |
$17.01 |
$16.20 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$10,275.00 |
$7,500.00 |
$6,500.00 |
$12,000.00 |
$6,686.67 |
$23,540.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 960 | LF |
$3.80 |
$4.25 |
$4.25 |
$3.85 |
$6.25 |
$4.61 |
$3.25 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 308 | LF |
$20.00 |
$5.00 |
$18.00 |
$13.00 |
$18.00 |
$19.75 |
$14.20 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 6,440 | SY |
$4.60 |
$5.50 |
$5.65 |
$4.00 |
$5.70 |
$5.72 |
$4.20 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 1.33 | AC |
$2,000.00 |
$200.00 |
$2,600.00 |
$500.00 |
$3,100.00 |
$2,855.12 |
$1,363.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 387 | CY |
$110.00 |
$103.00 |
$115.00 |
$58.00 |
$112.00 |
$107.60 |
$121.00 |
| 100 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 49 | TON |
$68.00 |
$55.00 |
$57.00 |
$100.00 |
$57.09 |
$58.37 |
$62.10 |
| 110 | 509(A)0200 |
CLASS AA CONCRETE | 3.7 | CY |
$700.00 |
$1,842.50 |
$1,500.00 |
$875.00 |
$2,000.00 |
$769.91 |
$1,546.00 |
| 120 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$425.00 |
$325.00 |
$400.00 |
$300.00 |
$300.00 |
$529.88 |
$1,136.00 |
| 130 | 511(A)2200 |
REINFORCING STEEL | 446 | LB |
$2.50 |
$1.75 |
$1.10 |
$4.00 |
$4.12 |
$3.06 |
$2.65 |
| 140 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 40 | LF |
$65.00 |
$49.00 |
$45.00 |
$68.00 |
$55.00 |
$85.90 |
$48.60 |
| 150 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 74 | LF |
$70.00 |
$58.00 |
$60.00 |
$99.00 |
$70.48 |
$95.27 |
$67.00 |
| 160 | 613(B)5616 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 120 | LF |
$100.00 |
$104.00 |
$77.00 |
$115.00 |
$84.62 |
$98.88 |
$81.00 |
| 170 | 613(L)6632 |
35" X 24" PREFAB. CULVERT END SEC., ARCH | 4 | EA |
$575.00 |
$590.00 |
$865.00 |
$2,000.00 |
$1,283.00 |
$1,243.73 |
$923.50 |
| 180 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$460.00 |
$358.00 |
$400.00 |
$1,200.00 |
$750.00 |
$982.29 |
$631.50 |
| 190 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$500.00 |
$425.00 |
$535.00 |
$1,200.00 |
$950.00 |
$1,095.41 |
$788.50 |
| 200 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,000.00 |
$7,775.00 |
$4,000.00 |
$8,500.00 |
$7,500.00 |
$6,757.20 |
$16,900.00 |
| 210 | 619(B)6508 |
REMOVE AND RESET CATTLE GUARD | 1 | EA |
$2,000.00 |
$2,250.00 |
$2,000.00 |
$2,500.00 |
$1,850.00 |
$2,195.43 |
$2,700.00 |
| 220 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 25 | LF |
$35.00 |
$55.00 |
$55.00 |
$50.00 |
$39.00 |
$59.86 |
$54.50 |
| 230 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 3 | EA |
$3,000.00 |
$2,717.00 |
$2,700.00 |
$2,950.00 |
$3,500.00 |
$2,956.87 |
$3,218.00 |
| 240 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$3,050.00 |
$3,025.00 |
$3,625.00 |
$3,200.00 |
$5,950.00 |
$3,292.06 |
$3,490.00 |
| 250 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 974 | LF |
$16.50 |
$13.20 |
$13.50 |
$25.00 |
$14.50 |
$18.37 |
$13.00 |
| 260 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 210 | CY |
$22.00 |
$15.65 |
$25.00 |
$28.00 |
$28.00 |
$16.09 |
$28.00 |
| 270 | 501(F)1700 |
GRANULAR BACKFILL | 120 | CY |
$95.00 |
$83.50 |
$114.00 |
$145.00 |
$145.51 |
$128.19 |
$156.00 |
| 280 | 503(A)4270 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 404 | LF |
$390.00 |
$386.50 |
$375.00 |
$385.75 |
$396.90 |
$381.12 |
$340.00 |
| 290 | 504(D)5410 |
CONCRETE RAIL (TR3) | 347.2 | LF |
$100.00 |
$107.00 |
$355.00 |
$110.00 |
$108.25 |
$107.38 |
$134.50 |
| 300 | 506(A)7200 |
STRUCTURAL STEEL | 970 | LB |
$3.20 |
$4.45 |
$3.00 |
$6.00 |
$4.87 |
$2.88 |
$4.10 |
| 310 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,600.00 |
$1,637.50 |
$1,200.00 |
$1,250.00 |
$1,890.00 |
$1,010.63 |
$2,116.00 |
| 320 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$1,600.00 |
$1,717.50 |
$1,300.00 |
$1,250.00 |
$1,890.00 |
$1,108.04 |
$2,203.00 |
| 330 | 509(A)0210 |
CLASS AA CONCRETE | 117.2 | CY |
$880.00 |
$970.00 |
$800.00 |
$800.00 |
$900.00 |
$1,014.56 |
$909.50 |
| 340 | 509(B)0320 |
CLASS A CONCRETE | 81.4 | CY |
$900.00 |
$1,005.00 |
$850.00 |
$770.00 |
$840.00 |
$659.63 |
$870.00 |
| 350 | 511(A)2210 |
REINFORCING STEEL | 37,300 | LB |
$1.35 |
$1.27 |
$1.10 |
$1.55 |
$1.26 |
$1.38 |
$1.30 |
| 360 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 148 | LF |
$46.00 |
$52.00 |
$35.00 |
$48.00 |
$42.40 |
$40.60 |
$49.30 |
| 370 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 434 | LF |
$54.00 |
$57.60 |
$40.00 |
$55.00 |
$46.49 |
$49.67 |
$61.00 |
| 380 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 148 | LF |
$20.00 |
$13.00 |
$20.00 |
$24.00 |
$23.00 |
$40.66 |
$25.30 |
| 390 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 434 | LF |
$21.00 |
$14.40 |
$20.00 |
$23.00 |
$20.00 |
$38.97 |
$25.90 |
| 400 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 410 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 590 | TON |
$85.00 |
$67.00 |
$70.00 |
$80.00 |
$64.50 |
$73.97 |
$72.20 |
| 420 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 197 | TON |
$75.00 |
$63.00 |
$60.00 |
$60.00 |
$56.75 |
$62.01 |
$59.20 |
| 430 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$38.00 |
$46.50 |
$40.00 |
$50.00 |
$35.00 |
$34.80 |
$104.00 |
| 440 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$38.00 |
$45.00 |
$40.00 |
$50.00 |
$30.00 |
$39.10 |
$21.70 |
| 450 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$14,800.00 |
$10,000.00 |
$20,000.00 |
$23,000.00 |
$20,500.00 |
$21,395.00 |
| 460 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,000 | SD |
$0.3000 |
$0.1700 |
$0.2000 |
$0.8500 |
$0.0400 |
$0.1800 |
$1.25 |
| 470 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 300 | SD |
$0.3000 |
$8.00 |
$4.40 |
$2.00 |
$0.0400 |
$4.79 |
$2.75 |
| 480 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,400 | SD |
$0.2500 |
$1.65 |
$2.00 |
$1.75 |
$0.0400 |
$1.80 |
$1.65 |
| 490 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 6,000 | SD |
$0.3000 |
$0.8300 |
$0.9000 |
$0.7500 |
$0.0400 |
$0.9000 |
$0.5500 |
| 500 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,500.00 |
$7,800.00 |
$6,950.00 |
$13,500.00 |
$14,000.00 |
$7,282.32 |
$18,140.00 |
| 510 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$3,200.00 |
$3,500.00 |
$5,200.00 |
$3,000.00 |
$2,992.78 |
$2,970.00 |
| 520 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$62,000.00 |
$45,600.00 |
$81,990.00 |
$60,000.00 |
$72,300.00 |
$63,004.71 |