| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$22,000.00 |
$5,000.00 |
$13,334.96 |
$67,400.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 104,700 | CY |
$8.00 |
$10.80 |
$6.59 |
$12.85 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 19,035 | CY |
$10.00 |
$11.50 |
$12.05 |
$14.51 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$14,000.00 |
$112,784.00 |
$42,903.76 |
$36,300.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 60,770 | LF |
$3.00 |
$2.86 |
$3.12 |
$2.73 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 11 | EA |
$311.00 |
$307.79 |
$335.11 |
$292.81 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,708 | LF |
$12.00 |
$14.79 |
$16.11 |
$14.07 |
| 80 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 14 | CY |
$154.00 |
$319.50 |
$48.70 |
$165.00 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 126,819 | SY |
$3.00 |
$2.97 |
$3.24 |
$2.83 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 26.2 | AC |
$616.00 |
$1,379.18 |
$1,501.63 |
$1,312.06 |
| 110 | 241 3100 |
MOWING | 52.4 | AC |
$180.00 |
$307.79 |
$335.11 |
$292.81 |
| 120 | 303(A)1200 |
AGGREGATE BASE TYPE A | 48,491 | CY |
$65.00 |
$28.00 |
$43.19 |
$50.00 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 298,285 | SY |
$6.00 |
$5.00 |
$4.70 |
$5.34 |
| 140 | 317 7100 |
CEMENT TREATED BASE | 230,528 | SY |
$15.00 |
$13.74 |
$15.35 |
$15.50 |
| 150 | 325 0100 |
SEPARATOR FABRIC | 280,546 | SY |
$3.00 |
$2.41 |
$1.30 |
$1.14 |
| 160 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 54,618 | TON |
$35.00 |
$18.00 |
$21.42 |
$23.00 |
| 170 | 407(B)7300 |
TACK COAT | 4,429 | GAL |
$3.00 |
$5.33 |
$5.80 |
$5.21 |
| 180 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,358 | TON |
$105.00 |
$85.00 |
$122.91 |
$111.72 |
| 190 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,333 | TON |
$175.00 |
$153.36 |
$166.98 |
$120.86 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,061 | TON |
$150.00 |
$90.80 |
$148.42 |
$118.57 |
| 210 | 412 3100 |
COLD MILLING PAVEMENT | 45,536 | SY |
$2.50 |
$6.00 |
$3.85 |
$8.00 |
| 220 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 34,109 | SY |
$25.00 |
$6.00 |
$9.91 |
$17.50 |
| 230 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 215,291 | SY |
$25.00 |
$14.50 |
$18.14 |
$23.50 |
| 240 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 78,421 | CY |
$150.00 |
$124.00 |
$140.32 |
$160.00 |
| 250 | 509(A)0200 |
CLASS AA CONCRETE | 23 | CY |
$613.00 |
$798.29 |
$536.97 |
$900.00 |
| 260 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 1 | CY |
$1,460.00 |
$311.86 |
$1,442.64 |
$1,200.00 |
| 270 | 511(A)2200 |
REINFORCING STEEL | 3,290 | LB |
$1.70 |
$1.41 |
$1.35 |
$2.00 |
| 280 | 611(G)0354 |
INLET (SMD-TYPE 2) | 2 | EA |
$3,465.00 |
$3,032.52 |
$3,636.68 |
$5,773.35 |
| 290 | 611(G)0358 |
INLET (SMD-TYPE 2A) | 9 | EA |
$3,620.00 |
$4,113.08 |
$21,840.73 |
$5,654.17 |
| 300 | 611(L)1600 |
JUNCTION BOXES | 34 | CF |
$138.00 |
$1,208.52 |
$91.24 |
$248.72 |
| 310 | 613(A)5216 |
24" R.C.PIPE CLASS III | 54 | LF |
$90.00 |
$178.34 |
$77.32 |
$139.90 |
| 320 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 251 | LF |
$60.00 |
$52.85 |
$67.46 |
$66.58 |
| 330 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 1,093 | LF |
$63.00 |
$67.87 |
$71.43 |
$82.13 |
| 340 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 2,143 | LF |
$90.00 |
$53.32 |
$135.42 |
$107.62 |
| 350 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,480.00 |
$932.05 |
$641.35 |
$984.50 |
| 360 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,860.00 |
$1,236.95 |
$967.21 |
$1,191.77 |
| 370 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$15,000.00 |
$44,701.08 |
$57,000.00 |
| 380 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 1,433 | SY |
$11.00 |
$12.34 |
$150.97 |
$16.06 |
| 390 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 29,297 | SY |
$4.00 |
$5.50 |
$6.02 |
$8.56 |
| 400 | 619(B)6376 |
REMOVAL OF CONC.PAV.W/ASPH.OVERLAY | 119,508 | SY |
$5.00 |
$6.00 |
$10.45 |
$15.06 |
| 410 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 2,013 | LF |
$4.00 |
$4.10 |
$4.46 |
$8.00 |
| 420 | 619(B)6400 |
REMOVAL OF CURB | 134 | LF |
$11.00 |
$3.00 |
$6.40 |
$16.58 |
| 430 | 619(C)6600 |
SAWING PAVEMENT | 2,685 | LF |
$4.00 |
$4.00 |
$7.54 |
$5.00 |
| 440 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,400 | LF |
$30.00 |
$26.63 |
$28.99 |
$43.50 |
| 450 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 4 | EA |
$1,450.00 |
$1,597.50 |
$1,739.34 |
$4,450.00 |
| 460 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,300.00 |
$4,260.00 |
$4,638.25 |
$5,500.00 |
| 470 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$2,800.00 |
$3,887.25 |
$4,232.40 |
$5,000.00 |
| 480 | 625(D)4500 |
REMOVE AND RECONSTRUCT GUARDRAIL | 425 | LF |
$23.00 |
$24.73 |
$26.93 |
$75.00 |
| 490 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 380 | CY |
$18.00 |
$31.95 |
$14.04 |
$35.00 |
| 500 | 501(F)1700 |
GRANULAR BACKFILL | 143 | CY |
$77.00 |
$93.72 |
$122.27 |
$88.00 |
| 510 | 509(A)0210 |
CLASS AA CONCRETE | 84.6 | CY |
$921.00 |
$937.20 |
$745.09 |
$880.00 |
| 520 | 509(B)0320 |
CLASS A CONCRETE | 124.9 | CY |
$767.00 |
$745.50 |
$585.08 |
$700.00 |
| 530 | 509(D)0510 |
CLASS C CONCRETE | 3 | CY |
$982.00 |
$426.00 |
$958.10 |
$400.00 |
| 540 | 510(C)1450 |
SLOPE WALL (5") | 12 | SY |
$203.00 |
$378.08 |
$574.69 |
$355.00 |
| 550 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 45,900 | LB |
$1.75 |
$1.92 |
$1.53 |
$1.80 |
| 560 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 100 | LF |
$31.00 |
$36.21 |
$14.59 |
$34.00 |
| 570 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$12,780.00 |
$8,743.09 |
$12,000.00 |
| 580 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 50,000 | LF |
$0.9000 |
$0.2300 |
$0.2600 |
$0.5000 |
| 590 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 110,000 | LF |
$0.6000 |
$1.49 |
$1.62 |
$1.30 |
| 600 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 10,000 | EA |
$0.6000 |
$0.6900 |
$0.7900 |
$0.6500 |
| 610 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 50,000 | LF |
$0.2000 |
$0.2800 |
$0.3000 |
$0.4000 |
| 620 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,800 | SD |
$5.30 |
$22.37 |
$24.35 |
$5.00 |
| 630 | 871(C)2410 |
RELOCATION OF IMPACT ATTENUATOR | 3 | EA |
$674.00 |
$905.25 |
$985.63 |
$2,000.00 |
| 640 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 37,420 | LF |
$25.00 |
$40.00 |
$29.55 |
$33.00 |
| 650 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 74,840 | LF |
$5.00 |
$1.50 |
$4.41 |
$3.00 |
| 660 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 900 | SD |
$3.00 |
$1.07 |
$1.16 |
$5.00 |
| 670 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,800 | SD |
$0.3000 |
$0.0200 |
$0.0200 |
$1.00 |
| 680 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,900 | SD |
$0.5000 |
$1.07 |
$1.16 |
$2.50 |
| 690 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,800 | SD |
$0.9000 |
$5.33 |
$5.80 |
$5.00 |
| 700 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$0.7000 |
$10.65 |
$11.60 |
$2.25 |
| 710 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 7,200 | SD |
$0.2000 |
$0.6400 |
$0.7000 |
$4.00 |
| 720 | 880(F)6700 |
DRUMS | 8,400 | SD |
$0.2000 |
$1.07 |
$1.16 |
$0.5000 |
| 730 | 880(G)6805 |
CHANNELIZER CONES | 217,500 | SD |
$0.4000 |
$0.0200 |
$0.0200 |
$0.1000 |
| 740 | 880(K)7200 |
SURVEILLANCE TRAFFIC CONTROL | 300 | SD |
$440.00 |
$559.13 |
$608.77 |
$575.00 |
| 750 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 3,000 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 760 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 600 | SD |
$12.00 |
$52.19 |
$56.82 |
$20.00 |
| 770 | 413(C)4400 |
RUMBLE STRIP-METHOD PCC-CON | 61,484 | LF |
$0.5000 |
$0.5200 |
$0.5700 |
$0.3200 |
| 780 | 509(D)0500 |
CLASS C CONCRETE | 34.15 | CY |
$370.00 |
$426.00 |
$356.48 |
$570.38 |
| 790 | 511(A)2200 |
REINFORCING STEEL | 1,405 | LB |
$1.50 |
$1.92 |
$1.30 |
$6.00 |
| 800 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 175 | LF |
$1,000.00 |
$1,118.25 |
$1,217.54 |
$1,500.00 |
| 810 | 804(A)2200 |
STRUCTURAL CONCRETE | 1.75 | CY |
$976.00 |
$426.00 |
$463.82 |
$1,250.00 |
| 820 | 804(B)2300 |
REINFORCING STEEL | 244 | LB |
$2.50 |
$2.40 |
$2.61 |
$5.00 |
| 830 | 805(A)3244 |
(PL)REMOVAL OF GROUND MOUNTED SIGNS | 1 | LSUM |
$3,800.00 |
$9,052.50 |
$9,856.27 |
$15,000.00 |
| 840 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$221.00 |
$372.75 |
$405.85 |
$750.00 |
| 850 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 82.71 | SF |
$26.00 |
$38.34 |
$41.74 |
$45.00 |
| 860 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 75 | SF |
$34.00 |
$40.47 |
$44.06 |
$85.00 |
| 870 | 850(B)1320 |
EXTR.ALUM.PAN.SGN.(OVRHD SIGNS) | 986.5 | SF |
$28.00 |
$44.73 |
$48.70 |
$60.00 |
| 880 | 851(A)2205 |
6"@15 GALV.STL.WD.FLANGE BM.POST | 39.5 | LF |
$40.00 |
$34.08 |
$37.11 |
$100.00 |
| 890 | 851(C)2415 |
2" SQUARE TUBE POST | 90 | LF |
$3.00 |
$10.65 |
$11.60 |
$12.00 |
| 900 | 852(E)3600 |
OVHD.SN.STR., MONOTUBE TYPE C | 5 | EA |
$68,782.00 |
$80,242.43 |
$87,367.13 |
$96,500.00 |
| 910 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 92,789 | LF |
$0.5000 |
$0.8700 |
$0.9500 |
$0.8800 |
| 920 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,400 | LF |
$1.90 |
$1.76 |
$1.91 |
$2.25 |
| 930 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 9,409 | LF |
$1.70 |
$2.08 |
$2.26 |
$3.35 |
| 940 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 45 | LF |
$10.00 |
$5.33 |
$5.80 |
$25.00 |
| 950 | 856(B)8308 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 3 | EA |
$430.00 |
$79.88 |
$86.97 |
$500.00 |
| 960 | 858(A)0272 |
PAVE.MARKERS CLASS C TYPE 2-C | 666 | EA |
$35.00 |
$7.99 |
$8.70 |
$75.00 |
| 970 | 858(A)0276 |
PAVE.MARKERS CLASS C TYPE 2-D | 564 | EA |
$35.00 |
$7.99 |
$8.70 |
$75.00 |
| 980 | 870(A)1100 |
SAND FILLED IMPACT ATTEN.MODULE | 95 | EA |
$351.00 |
$399.38 |
$434.84 |
$700.00 |
| 990 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$110,000.00 |
$57,000.00 |
$108,998.75 |
$224,790.00 |
| 1,000 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$6,000.00 |
$4,058.47 |
$10,000.00 |
| 1,010 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$19,000.00 |
$11,595.62 |
$29,000.00 |
| 1,020 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$1,542,800.00 |
|
|
|